Skip to content

Chapter 17.820 — LOT LINE ADJUSTMENTS

Sacramento Zoning Code · 2026-06 edition · updated 2026-07-06 · Sacramento

17.820.010 General.

A. Applications for lot line adjustments shall be decided by the director of public works pursuant to the procedures in this chapter.

B. The procedure provided by this chapter is an alternative to the procedures provided by chapters 17.828, 17.832 and 17.836. Nothing stated herein shall be construed to prevent an applicant from filing a tentative map, a final map or parcel map for any lot line adjustment. (Ord. 2017-0009 § 20)

17.820.020 Application.

A. An application for a lot line adjustment shall be filed with the director of public works and shall include the following information, materials and documents:

  1. Drawings specifying the location of the existing lots, the proposed lot line adjustment, and the boundaries and dimensions of the proposed new lots;

  2. A legal description for each new lot within the boundaries of the drawing;

  3. A title report for each existing lot within the boundaries of the drawing;

  4. Such additional information as the director of public works may require pursuant to sections 17.828.040.C and 17.828.060, considering the magnitude of the adjustment; its relation to existing buildings, structures, and landscaping; the present use and zoning of the property; location and extent of public improvements; its relation to adopted plans for the area; and compliance with the subdivision map act or other ordinances and plans of the city.

  5. Additional reports, drawings, statements, or other data as required by the director of public works.

B. The application shall be accompanied by a filing fee established by resolution of the city council. (Ord. 20170009 § 20)

17.820.030 Process for reviewing lot line adjustment.

A. Application Processing.

  1. Within 30 days of receiving an application for a lot line adjustment, the director of public works shall inform the applicant whether the application is complete and accepted for filing. If incomplete, the director of public works shall advise the applicant as to the deficiencies in the application.

  2. Within 10 days after an application has been found to be complete and accepted for filing, the director of public works shall transmit copies of the application and, where applicable, copies of drawing, statements and other data required to accompany the application or required subsequent to the filing of the application, to members of the subdivision review committee and to such other public or private agencies or departments as the director of public works determines may be affected by the proposed lot line adjustment.

  3. Applications for lot line adjustments shall be processed by the applicant in a timely manner. If the applicant fails to process the application to completion within one year from the date the application was first submitted, due to the applicant's failure to respond to requests for additional information, to pay processing fees, or for any other reason, and upon written notice of the director of public works the application shall be deemed withdrawn. Thereafter, a new application, including the filing fee, will be needed to process the lot line adjustment.

B. Action by the director of public works: The director of public works may approve, or conditionally approve, or disapprove a proposed lot line adjustment. (Ord. 2017-0009 § 20)

17.820.040 Findings.

The director of public works shall approve a lot line adjustment sought pursuant to this chapter if the director of public works finds:

A. That the lot line adjustment will not result in the abandonment of any street or utility easement of record, and that, if the lot line adjustment will result in the transfer of property from one owner to another owner, the deed to the subsequent owner expressly reserves any street or utility easement of record;

B. That the lot line adjustment will not result in the elimination or reduction in size of the access way to any resulting parcel, or that the application is accompanied by new easements to provide access which meet all the city requirements regarding access to parcels in the location and of the size as those proposed to be created; and

C. That the resulting parcels conform to the requirements of the city's general plan, building code, and this title. (Ord. 2017-0009 § 20)

17.820.050 Recording.

Pursuant to California Government Code section 66412(d), the lot line adjustment shall be reflected in a deed, which shall be recorded. (Ord. 2017-0009 § 20)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Sacramento Zoning Code
Sacramento Zoning Code
  1. Chapter 17.100 — TITLE, PURPOSE, AND AUTHORITY
  2. Chapter 17.104 — HOW TO USE THE PLANNING AND DEVELOPMENT CODE
  3. Chapter 17.108 — DEFINITIONS
  4. Chapter 17.112 — ENFORCEMENT
  5. Chapter 17.200 — AGRICULTURE AND OPEN SPACE
  6. Chapter 17.204 — SINGLE-UNIT AND DUPLEX DWELLINGS
  7. Chapter 17.208 — MULTI-UNIT DWELLINGS
  8. Chapter 17.212 — RESIDENTIAL MIXED USE
  9. Chapter 17.216 — COMMERCIAL, OFFICE, AND MIXED USE
  10. Chapter 17.220 — INDUSTRIAL AND MANUFACTURING
  11. Chapter 17.224 — MISCELLANEOUS
  12. Chapter 17.228 — SPECIAL USE REGULATIONS
  13. Chapter 17.232 — NONCONFORMING USES
  14. Chapter 17.300 — OVERLAY ZONES GENERALLY
  15. Chapter 17.312 — EXECUTIVE AIRPORT OVERLAY ZONE (EA-1 THROUGH …
  16. Chapter 17.332 — PARKWAY CORRIDOR (PC) OVERLAY ZONE
  17. Chapter 17.336 — SOLID WASTE RESTRICTED (SWR) OVERLAY ZONE
  18. Chapter 17.340 — TO ZONE-TRANSIT OVERLAY
  19. Chapter 17.400 — SPECIAL PLANNING DISTRICTS GENERALLY
  20. Chapter 17.404 — BROADWAY-STOCKTON SPECIAL PLANNING DISTRICT
  21. Chapter 17.408 — FOLSOM BOULEVARD WEST SPECIAL PLANNING DISTRICT
  22. Chapter 17.409 — FOLSOM BOULEVARD EAST SPECIAL PLANNING DISTRICT
  23. Chapter 17.412 — MCCLELLAN HEIGHTS AND PARKER HOMES SPECIAL PL…
  24. Chapter 17.416 — NORTHGATE SPECIAL PLANNING DISTRICT
  25. Chapter 17.420 — ALHAMBRA CORRIDOR SPECIAL PLANNING DISTRICT
  26. Chapter 17.424 — DEL PASO BOULEVARD/ARDEN WAY SPECIAL PLANNING…
  27. Chapter 17.428 — DEL PASO NUEVO SPECIAL PLANNING DISTRICT
  28. Chapter 17.432 — SACRAMENTO ARMY DEPOT SPECIAL PLANNING DISTRICT
  29. Chapter 17.436 — RIVER DISTRICT SPECIAL PLANNING DISTRICT
  30. Chapter 17.440 — RAILYARDS SPECIAL PLANNING DISTRICT
  31. Chapter 17.442 — ENTERTAINMENT AND SPORTS CENTER SPECIAL PLANN…
  32. Chapter 17.444 — CENTRAL CITY SPECIAL PLANNING DISTRICT
  33. Chapter 17.448 — FREEPORT SPECIAL PLANNING DISTRICT
  34. Chapter 17.452 — PLANNED UNIT DEVELOPMENT REGULATIONS
  35. Chapter 17.500 — DESIGN STANDARDS FOR SUBDIVISIONS
  36. Chapter 17.504 — IMPROVEMENT REQUIREMENTS FOR SUBDIVISIONS
  37. Chapter 17.512 — PARKS AND RECREATION FACILITIES
  38. Chapter 17.516 — BRIDGES AND MAJOR THOROUGHFARES
  39. Chapter 17.604 — HISTORIC PRESERVATION
  40. Chapter 17.608 — PARKING REGULATIONS
  41. Chapter 17.612 — LANDSCAPING AND PAVING REGULATIONS
  42. Chapter 17.616 — RECYCLING AND SOLID WASTE DISPOSAL REGULATIONS
  43. Chapter 17.620 — WALL, FENCE AND GATE REGULATIONS
  44. Chapter 17.624 — RESIDENTIAL ACCESSORY STRUCTURE AND USE REGUL…
  45. Chapter 17.700 — TRANSPORTATION SYSTEMS MANAGEMENT PROGRAM
  46. Chapter 17.704 — DENSITY BONUSES
  47. Chapter 17.706 — GREEN BUILDING BONUSES FOR NONRESIDENTIAL BUI…
  48. Chapter 17.712 — MIXED INCOME HOUSING
  49. Chapter 17.716 — RESIDENTIAL CONDOMINIUM CONVERSION AND NEW CO…
  50. Chapter 17.718 — COMMERCIAL CONDOMINIUM PROGRAM
  51. Chapter 17.720 — SURFACE MINING AND RECLAMATION
  52. Chapter 17.722 — URBAN AGRICULTURE INCENTIVE ZONE
  53. Chapter 17.800 — APPLICATIONS AND FEES
  54. Chapter 17.804 — REQUESTS FOR REASONABLE ACCOMMODATION UNDER T…
  55. Chapter 17.808 — PERMITS AND LEGISLATIVE CHANGE REQUESTS
  56. Chapter 17.810 — FLOODPLAIN MANAGEMENT FINDINGS
  57. Chapter 17.812 — REVIEW PROCEDURES
  58. Chapter 17.816 — MAPS GENERALLY
  59. Chapter 17.820 — LOT LINE ADJUSTMENTS
  60. Chapter 17.824 — MERGER OF PARCELS
  61. Chapter 17.828 — TENTATIVE MAPS
  62. Chapter 17.832 — FINAL AND PARCEL MAPS
  63. Chapter 17.836 — MASTER PARCEL MAPS
  64. Chapter 17.840 — VESTING TENTATIVE MAPS
  65. Chapter 17.842 — TENTATIVE MAP DESIGN DEVIATION
  66. Chapter 17.844 — POST-TENTATIVE MAP DESIGN DEVIATION
  67. Chapter 17.848 — SURVEYS AND MONUMENTS
  68. Chapter 17.852 — IMPROVEMENT PLANS AND PERMITS
  69. Chapter 17.856 — REVERSION TO ACREAGE
  70. Chapter 17.860 — MINISTERIAL APPROVAL FOR INFILL HOUSING PROJE…
  71. Chapter 17.864 — MINISTERIAL APPROVAL OF TWO DWELLING UNITS ON…
  72. Chapter 17.868 — Ministerial Approval of Development Projects …
  73. Chapter 17.876 — LOW BARRIER NAVIGATION CENTERS
  74. Chapter 17.880 — SUPPORTIVE HOUSING
  75. Chapter 17.900 — GENERAL PLAN ADOPTION AND AMENDMENT
  76. Chapter 17.904 — SPECIFIC PLANS
  77. Chapter 17.908 — TRANSIT VILLAGE PLANS
  78. Chapter 17.912 — GENERAL PLAN CONSISTENCY REVIEWS
  79. Chapter 17.916 — PLANNING AND DEVELOPMENT CODE AMENDMENTS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.