Chapter 17.864 — MINISTERIAL APPROVAL OF TWO DWELLING UNITS ON A LOT AND URBAN LOT SPLITS.
Sacramento Zoning Code · 2026-06 edition · updated 2026-07-06 · Sacramento
17.864.010 Purpose and intent. ¶
The purpose of this chapter is to comply with Senate Bill 9 (Chapter 162, Statutes of 2021), related to housing development approvals and urban lot splits. Consistent with that bill, this chapter authorizes a ministerial review process for housing developments containing no more than two dwelling units in compliance with California Government Code section 65852.21. Under that section, a "housing development contains two [dwelling] units if the development proposes no more than two new units or if itproposes to add one new unit to one existing unit." This chapter also, consistent with Senate Bill 9, authorizes a ministerial review process for parcel maps that create no more than two new lots (referred to in state law as an "urban lot split") in compliance with California Government Code section 66411.7.
Nothing in this chapter precludes an applicant from applying for a development permit under another section of this code. (Ord. 2021-0035, § 3)
17.864.020 Housing development projects eligible for ministerial review under… ¶
A. Administrative permit. Except as provided in subsection B of this section, the city will grant an administrative permit to any housing development containing no more than two dwelling units if it complies with all the following:
- General requirements.
a. The site is located within the RE or R-1 zones.
b. The project qualifies for ministerial approval under California Government Code section 65852.21.
c. Dwelling units created pursuant to this section may not be used as short-term rentals, bed and breakfast inns, hotels, or any other nonresidential use, excluding a use authorized by article II of chapter 17.228, related to home occupations.
- Development standards.
a. Height. New construction must comply with the height limit of the applicable zone.
- b. Density. The maximum density is two dwelling units per lot.
c. Lot coverage. The housing development must comply with the lot coverage requirement applicable to the zone in which the development is located unless that requirement would have the effect of physically precluding the construction of up to two dwelling units or would physically preclude either of the two dwelling units from being at least 800 square feet.
d. Setbacks. The following setbacks apply:
i. Front-yard setback. The minimum front-yard setback is as follows:
(a) If there are at least two other buildings with front-yard setbacks on the same side of the street on the same block as the lot for which the setback is being determined, the minimum front-yard setback is the average of the two front-yard setbacks of the nearest two buildings.
- (b) If there is only one other building with a front-yard setback on the same side of the street on the same
block as the lot for which the setback is being determined, the minimum front-yard setback is the front-yard setback of the other building.
(c) If there is no other building with a front-yard setback on the same side of the street on the same block as the lot for which the setback is being determined, the minimum front-yard setback is 20 feet.
ii. Interior side-yard setback. The minimum interior side-yard setback is four feet.
iii. Street side-yard setback. The minimum street side-yard setback is 12.5 feet.
iv. Rear-yard setback. The minimum rear-yard setback is four feet.
v. No setback is required for an existing structure or a structure constructed in the same location and to the same dimensions as an existing structure.
e. Accessory dwelling units. If one of the two proposed dwelling units is an accessory dwelling unit, it must comply with section 17.228.105.
f. Private protected trees. No private protected tree, as defined in section 12.56.020, may be removed unless: (i) leaving the tree in place would have the effect of physically precluding the construction of up to two dwelling units;
(ii) leaving the tree in place would physically preclude either of the two dwelling units from being at least 800 square feet; or (iii) removal is authorized by a tree permit under section 12.56.050.
- Design standards.
a. New construction must comply with the Citywide Infill Housing Design Standards and, if the development is located within a planned unit development, the objective standards set forth in the planned unit development's development guidelines.
b. No portion of an open balcony, deck, stairs, or landing within 10 feet of a rear lot line or side lot line may be higher than three feet from the ground unless the rear lot line or side lot line abuts a nonresidential use, alley, public street, or city-approved private street.
- c. Garbage, recycling, and organic waste containers for each dwelling unit must have a designated storage area onsite that is screened from view from public streets.
- Other standards.
a. Fencing. All new fencing must comply with sections 17.620.100 and 17.620.1110, and chapter 12.28.
b. Streets. All housing developments must comply with the applicable, objective standards in chapter 17.502.
c. Alleys. Prior to issuance of a certificate of occupancy or final inspection for any dwelling with alley access, the alley must be named as required by the city and a street sign must be installed as required by the city.
d. Parking. No off-street vehicle parking spaces are required; however, if off-street vehicle parking is provided, the following standards apply:
i. Garages, carports, and parking pads must be at least 10 feet wide and 20 feet deep.
ii. Access to the on-site parking must be provided by a driveway that complies with the following:
(a) The driveway must be at least five feet from the property line.
(b) Driveways must have a width of at least 10 feet and a depth of at least 20 feet measured from the rightof-way line, unless the lot is located within the central city and less than 3,200 square feet, in which case the minimum required depth is 18 feet.
(c) Garages accessed from an alley must be setback at least four feet from the right-of-way line.
(d) All driveways and parking pads must be paved with concrete, decorative pavers, asphaltic concrete, or Portland cement.
(e) All applicable objective standards and other requirements in chapter 17.508.
e. All housing development must comply with the California Building Standards Code, as set forth in title 24 of theCalifornia Code of Regulations, including the California Fire Code.
f. All housing developments must comply with all applicable, objective standards set forth in the city code.
B. Findings for denial. Notwithstanding subsection A of this section, the city may deny a housing development project if the building official makes a written finding, based upon a preponderance of the evidence, that the proposed housing development project would have a specific, adverse impact, as defined in subdivision (d)(2) of section
65589.5 of the California Government Code, upon public health and safety and for which there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact.
- C. Approval and denial.
The city shall approve or deny an application submitted under this section within 60 days of receipt of a complete application. If the city does not approve or deny the complete application within 60 days, the application is deemed approved.
If the city denies the application, the city shall, within the time period described in subsection C.1, return in writing a full set of comments to the applicant with a list of items that are defective or deficient, and a description of how the application can be remedied by the applicant. (Ord. 2026-0001 § 34; Ord. 2025-0007 § 37; Ord. 2024-0017 § 74; Ord. 2021-0035, § 3)
17.864.030 Urban lot splits eligible for ministerial review under Government Code section 66411.7. ¶
A. Notwithstanding any other law, the city will ministerially approve a parcel map for an urban lot split if all the following requirements are met:
- General requirements.
a. The site is located within the RE or R-1 zones.
b. The parcel map subdivides an existing lot to create no more than two new lots of approximately equal lot area provided that one lot shall not be smaller than 40% of the lot size of the original lot proposed for subdivision.
c. Applicants must sign an affidavit stating that the applicant intends to occupy a dwelling unit on the property as their principal residence for a minimum of three years from the date of the approval of the urban lot split.
d. The project qualifies for ministerial approval under subdivision (a) of California Government Code section 66411.7.
- Subdivision standards.
a. The minimum lot size for each new lot is 1,200 square feet.
b. Each lot shall have either of the following:
i. At least 20 feet of developed public street frontage or public alley frontage; or
ii. An easement for access and the provision of public services and facilities or, in the absence of such an easement, the applicant enters into an agreement for conveyance of easements pursuant to subsection A.2.b.i of this section.
c. Each lot must have separate water and sewer services.
d. Existing water, sewer, and drainage mains located on the property without easements require dedication of easements in consultation with the Department of Utilities.
e. Prior to recording a parcel map, all existing tax assessments on the property must be paid, excluding taxes owed on any portion of the parcel subject to a pending tax bill segregation application.
f. The parcel map must adequately delineate all existing public easements and any new public easements.
g. The parcel map must comply with all applicable objective requirements of the Subdivision Map Act.
h. The parcel map must comply with all applicable objective standards in chapter 17.832.
i. As determined applicable by the city, prior to or concurrent with recording a parcel map, the subdivider shall enter into agreements for conveyance of easements for the provision of public services and facilities and for the provision of access to the public rights-of-way.
j. All urban lot splits must comply with the California Building Standards Code, as set forth in title 24 of the California Code of Regulations, including the California Fire Code.
k. All urban lot splits must comply with all applicable objective standards set forth in the city code.
B. Findings for denial. Notwithstanding subsection A of this section, the city may deny a housing development project if the building official makes a written finding, based upon a preponderance of the evidence, that the proposed housing development project would have a specific, adverse impact, as defined in California Government Code section 65589.5, subdivision (d)(2), upon public health and safety and for which there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact.
- C. Approval and denial.
The city shall approve or deny an application submitted under this section within 60 days of receipt of a complete application. If the city does not approve or deny the complete application within 60 days, the application will be deemed approved.
If the city denies the application, the city shall, within the time period described in subsection C.1, return in writing a full set of comments to the applicant with a list of items that are defective or deficient, and a description of how the application can be remedied by the applicant. (Ord. 2026-0001 § 35; Ord. 2021-0035, § 3)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Sacramento Zoning Code
- Chapter 17.100 — TITLE, PURPOSE, AND AUTHORITY
- Chapter 17.104 — HOW TO USE THE PLANNING AND DEVELOPMENT CODE
- Chapter 17.108 — DEFINITIONS
- Chapter 17.112 — ENFORCEMENT
- Chapter 17.200 — AGRICULTURE AND OPEN SPACE
- Chapter 17.204 — SINGLE-UNIT AND DUPLEX DWELLINGS
- Chapter 17.208 — MULTI-UNIT DWELLINGS
- Chapter 17.212 — RESIDENTIAL MIXED USE
- Chapter 17.216 — COMMERCIAL, OFFICE, AND MIXED USE
- Chapter 17.220 — INDUSTRIAL AND MANUFACTURING
- Chapter 17.224 — MISCELLANEOUS
- Chapter 17.228 — SPECIAL USE REGULATIONS
- Chapter 17.232 — NONCONFORMING USES
- Chapter 17.300 — OVERLAY ZONES GENERALLY
- Chapter 17.312 — EXECUTIVE AIRPORT OVERLAY ZONE (EA-1 THROUGH …
- Chapter 17.332 — PARKWAY CORRIDOR (PC) OVERLAY ZONE
- Chapter 17.336 — SOLID WASTE RESTRICTED (SWR) OVERLAY ZONE
- Chapter 17.340 — TO ZONE-TRANSIT OVERLAY
- Chapter 17.400 — SPECIAL PLANNING DISTRICTS GENERALLY
- Chapter 17.404 — BROADWAY-STOCKTON SPECIAL PLANNING DISTRICT
- Chapter 17.408 — FOLSOM BOULEVARD WEST SPECIAL PLANNING DISTRICT
- Chapter 17.409 — FOLSOM BOULEVARD EAST SPECIAL PLANNING DISTRICT
- Chapter 17.412 — MCCLELLAN HEIGHTS AND PARKER HOMES SPECIAL PL…
- Chapter 17.416 — NORTHGATE SPECIAL PLANNING DISTRICT
- Chapter 17.420 — ALHAMBRA CORRIDOR SPECIAL PLANNING DISTRICT
- Chapter 17.424 — DEL PASO BOULEVARD/ARDEN WAY SPECIAL PLANNING…
- Chapter 17.428 — DEL PASO NUEVO SPECIAL PLANNING DISTRICT
- Chapter 17.432 — SACRAMENTO ARMY DEPOT SPECIAL PLANNING DISTRICT
- Chapter 17.436 — RIVER DISTRICT SPECIAL PLANNING DISTRICT
- Chapter 17.440 — RAILYARDS SPECIAL PLANNING DISTRICT
- Chapter 17.442 — ENTERTAINMENT AND SPORTS CENTER SPECIAL PLANN…
- Chapter 17.444 — CENTRAL CITY SPECIAL PLANNING DISTRICT
- Chapter 17.448 — FREEPORT SPECIAL PLANNING DISTRICT
- Chapter 17.452 — PLANNED UNIT DEVELOPMENT REGULATIONS
- Chapter 17.500 — DESIGN STANDARDS FOR SUBDIVISIONS
- Chapter 17.504 — IMPROVEMENT REQUIREMENTS FOR SUBDIVISIONS
- Chapter 17.512 — PARKS AND RECREATION FACILITIES
- Chapter 17.516 — BRIDGES AND MAJOR THOROUGHFARES
- Chapter 17.604 — HISTORIC PRESERVATION
- Chapter 17.608 — PARKING REGULATIONS
- Chapter 17.612 — LANDSCAPING AND PAVING REGULATIONS
- Chapter 17.616 — RECYCLING AND SOLID WASTE DISPOSAL REGULATIONS
- Chapter 17.620 — WALL, FENCE AND GATE REGULATIONS
- Chapter 17.624 — RESIDENTIAL ACCESSORY STRUCTURE AND USE REGUL…
- Chapter 17.700 — TRANSPORTATION SYSTEMS MANAGEMENT PROGRAM
- Chapter 17.704 — DENSITY BONUSES
- Chapter 17.706 — GREEN BUILDING BONUSES FOR NONRESIDENTIAL BUI…
- Chapter 17.712 — MIXED INCOME HOUSING
- Chapter 17.716 — RESIDENTIAL CONDOMINIUM CONVERSION AND NEW CO…
- Chapter 17.718 — COMMERCIAL CONDOMINIUM PROGRAM
- Chapter 17.720 — SURFACE MINING AND RECLAMATION
- Chapter 17.722 — URBAN AGRICULTURE INCENTIVE ZONE
- Chapter 17.800 — APPLICATIONS AND FEES
- Chapter 17.804 — REQUESTS FOR REASONABLE ACCOMMODATION UNDER T…
- Chapter 17.808 — PERMITS AND LEGISLATIVE CHANGE REQUESTS
- Chapter 17.810 — FLOODPLAIN MANAGEMENT FINDINGS
- Chapter 17.812 — REVIEW PROCEDURES
- Chapter 17.816 — MAPS GENERALLY
- Chapter 17.820 — LOT LINE ADJUSTMENTS
- Chapter 17.824 — MERGER OF PARCELS
- Chapter 17.828 — TENTATIVE MAPS
- Chapter 17.832 — FINAL AND PARCEL MAPS
- Chapter 17.836 — MASTER PARCEL MAPS
- Chapter 17.840 — VESTING TENTATIVE MAPS
- Chapter 17.842 — TENTATIVE MAP DESIGN DEVIATION
- Chapter 17.844 — POST-TENTATIVE MAP DESIGN DEVIATION
- Chapter 17.848 — SURVEYS AND MONUMENTS
- Chapter 17.852 — IMPROVEMENT PLANS AND PERMITS
- Chapter 17.856 — REVERSION TO ACREAGE
- Chapter 17.860 — MINISTERIAL APPROVAL FOR INFILL HOUSING PROJE…
- Chapter 17.864 — MINISTERIAL APPROVAL OF TWO DWELLING UNITS ON…
- Chapter 17.868 — Ministerial Approval of Development Projects …
- Chapter 17.876 — LOW BARRIER NAVIGATION CENTERS
- Chapter 17.880 — SUPPORTIVE HOUSING
- Chapter 17.900 — GENERAL PLAN ADOPTION AND AMENDMENT
- Chapter 17.904 — SPECIFIC PLANS
- Chapter 17.908 — TRANSIT VILLAGE PLANS
- Chapter 17.912 — GENERAL PLAN CONSISTENCY REVIEWS
- Chapter 17.916 — PLANNING AND DEVELOPMENT CODE AMENDMENTS