31-30 MISCELLANEOUS PROVISIONS.
Danville Zoning Code · 2026-07 edition · updated 2026-07-09 · Danville
31-30.1 Ponding Areas; When Permitted. ¶
Disposal of storm water drainage by means of ponding areas may be permitted only with the approval of the Engineering Department, after study of the proposed disposal basin topography and soil characteristics and only where no other reasonable method of disposal is feasible.
31-30.2 Subdrainage; Where Required. ¶
Subdrain facilities shall be provided where specified by the soil engineer controlling the work and other areas where deemed necessary by the Town to prevent sliding or settlement of the earth surface. Facilities will be required to convey the subdrainage to an approved point of discharge.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Danville Zoning Code
- Chapter I
- Chapter II
- Chapter III
- Chapter IV
- Chapter V
- Part 1 — GENERAL
- Part 2 — CARDROOM LICENSES
- Part 3 — CARDROOM RESTRICTIONS
- Part 5 — SUSPENSION, REVOCATION, CHANGE AND VARIANCE
- Part 1
- Part 2
- Part 3
- Part 4
- Part 1
- Division 1 — FORM AND CONTENTS
- Division 2 — SUPPLEMENTARY DOCUMENTS
- Division 3 — CHECKING
- Division 4 — APPROVAL
- Division 1
- Division 3
-
▸ Division 4
Overview- 31-14 PLANS.
- 31-15 CONSTRUCTION WORK.
- 31-16 STREET LIGHTING.
- 31-17 SIDEWALKS AND PATHS.
- 31-18 UNDERGROUND UTILITIES.
- 31-19 CURBS AND GUTTERS.
- 31-20 MISCELLANEOUS PROVISIONS.
- 31-21 RESERVED.
- 31-22 STREETS.
- 31-23 SURVEY MONUMENTS.
- 31-24 BRIDGE CROSSINGS AND MAJOR THOROUGHFARES.
- 31-25 DRAINAGE; MINIMUM REQUIREMENTS.
- 31-26 APPURTENANCES IN PUBLIC RIGHTS-OF-WAY.
- 31-27 OPEN CHANNELS AND CONDUITS.
- 31-28 LEVEES.
- 31-29 EASEMENTS.
- 31-30 MISCELLANEOUS PROVISIONS.
- 31-31 WATER AND SEWERS.
- 31-32 FENCES.
- 31-35 PLANNING COMMISSION AUTHORITY.
- 31-36 PROCEDURE.
- Chapter XXXII
- Division 1 — INTRODUCTION
- Division 2 — SPECIFIC USES AND DEFINITIONS
- Division 3 — DEVELOPMENT STANDARDS
- Division 4 — PARKING STANDARDS
- Division 5 — DEVELOPMENT PLAN REVIEW PROCEDURES
- Division 1 — GENERAL
- Division 2 — REQUIREMENTS AND STANDARDS
- Division 3 — CREDIT; EXEMPTIONS
- Division 4 — DISPOSITION OF FEES AND LAND
- Division 5 — PROCEDURES
- Division 1 — GENERAL
- Division 3 — ENFORCEMENT REGULATIONS
- Division 1 — NONRESIDENTIAL CONSTRUCTION
- Division 2 — RESIDENTIAL CONSTRUCTION
- Division 1 — GENERAL PROVISIONS
- Division 2 — APPLICATIONS
- Division 3 — ADMINISTRATION
- Division 4 — PROVISIONS FOR FLOOD HAZARD REDUCTION
- Division 5 — FLOOD HAZARD VARIANCE PROCEDURES
- Division 2
- Division 5
- Division 2 — REQUIREMENTS AND STANDARDS
- Division 4
- Division 5
- Division 2
- Division 1
- Division 2