Skip to content

Division 3

Danville Zoning Code · 2026-07 edition · updated 2026-07-09 · Danville

31-11.24 Prints Required; Fees.

The subdivider shall submit three (3) sets of prints of the map and certificate sheet to the Engineering Department for checking purposes before the certificates on the original tracings are executed. The preliminary prints shall be accompanied by a current preliminary title report, furnished by the applicant and acceptable to the Engineering Department; by traverse sheets prepared by the subdivider’s engineer, showing the mathematical closure of the subdivision’s exterior boundaries; and by a checking fee as established and adopted by the Town Council from time to time by resolution.

31-11.25 Error of Closure in Traverse.

The error of closure in traverse around the subdivision and around the interior lots or blocks shall not exceed one (1) part in twenty thousand (20,000).

31-11.26 Engineering Department Action.

The Engineering Department, within ten (10) working days, shall note the required corrections, if any, on one (1) set of the preliminary prints and return them to the engineer or surveyor for revision of the maps.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Danville Zoning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.