Division 5
Danville Zoning Code · 2026-07 edition · updated 2026-07-09 · Danville
Sections in this part
32-83.40 Procedure. ¶
a. Land. At the time of approval of the tentative map or parcel map or issuance of a building permit in projects without maps, the Town shall determine under subsection 32-83.11 the land required for dedication. An offer of dedication shall be recorded at the same tune as the final or parcel map.
b. Fees. If the Town requires in lieu fee payment, the Town will set the amount of land upon which the in lieu fee will be based at the time of tentative map approval or building permit issuance in projects without maps.
The fee shall be established using land values at the time of final map approval or building permit issuance in projects without maps and using the formula in subsection 32-83.12. When a fee is required, it shall be paid at the time of the recording of the final map or building permit, whichever occurs first.
c. Other Covenants. Open space covenants for private park or recreation facilities shall be submitted to the Town before approval of the final subdivision map or parcel map and shall be recorded contemporaneously with the map.
(Ord. #69-85, §8-6240)
32-84—32-91 RESERVED.
Article VIII ¶
Article IX ¶
SIGNS AND OUTDOOR ADVERTISING[*]
- Editor's Note: Prior ordinances codified herein include portions of Ordinance No. 116.
Article X ¶
TRANSPORTATION IMPROVEMENT PROGRAM FEE DIVISION THREE REGIONAL
TRANSPORTATION FEES
Division 1
NONRESIDENTIAL CONSTRUCTION[*]
- Editor's Note: Prior ordinances codified herein include portions of Ordinance Nos. 62-85 and 126.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Danville Zoning Code
- Chapter I
- Chapter II
- Chapter III
- Chapter IV
- Chapter V
- Part 1 — GENERAL
- Part 2 — CARDROOM LICENSES
- Part 3 — CARDROOM RESTRICTIONS
- Part 5 — SUSPENSION, REVOCATION, CHANGE AND VARIANCE
- Part 1
- Part 2
- Part 3
- Part 4
- Part 1
- Division 1 — FORM AND CONTENTS
- Division 2 — SUPPLEMENTARY DOCUMENTS
- Division 3 — CHECKING
- Division 4 — APPROVAL
- Division 1
- Division 3
- Division 4
- Division 1 — INTRODUCTION
- Division 2 — SPECIFIC USES AND DEFINITIONS
- Division 3 — DEVELOPMENT STANDARDS
- Division 4 — PARKING STANDARDS
- Division 5 — DEVELOPMENT PLAN REVIEW PROCEDURES
- Division 1 — GENERAL
- Division 2 — REQUIREMENTS AND STANDARDS
- Division 3 — CREDIT; EXEMPTIONS
- Division 4 — DISPOSITION OF FEES AND LAND
- Division 5 — PROCEDURES
- Division 1 — GENERAL
- Division 3 — ENFORCEMENT REGULATIONS
- Division 1 — NONRESIDENTIAL CONSTRUCTION
- Division 2 — RESIDENTIAL CONSTRUCTION
- Division 1 — GENERAL PROVISIONS
- Division 2 — APPLICATIONS
- Division 3 — ADMINISTRATION
- Division 4 — PROVISIONS FOR FLOOD HAZARD REDUCTION
- Division 5 — FLOOD HAZARD VARIANCE PROCEDURES
- Division 2
- Division 5
- Division 2 — REQUIREMENTS AND STANDARDS
- Division 4
-
▸ Division 5
- Division 2
- Division 1
- Division 2