1107.2 Methods of Testing Storm Drainage Systems.
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Except for outside leaders and perforated or open-jointed drain tile, the piping of storm drain systems shall be tested upon completion of the rough piping installation by water or air, except that plastic pipe shall not be tested with air, and proved tight. The Authority Having Jurisdiction shall be permitted to require the removal of cleanout plugs to ascertain whether the pressure has reached parts of the system. One of the following test methods shall be used in accordance with Section 1107.2.1 through Section 1107.2.3.
1107.2.1 Water Test. After piping has been installed, the water test shall be applied to the drainage system, either to the entire system or sections. Where the test is applied to the entire system, all openings in the piping shall be tightly closed except for the highest opening, and the system shall be filled with water to the point of overflow. Where the system is tested in sections, each opening shall be tightly plugged except for the highest opening of the section under test, and each section shall be filled with water, but no section shall be tested with less than a 10 foot (3048 mm) head of water. In testing successive sections, not less than the upper 10 feet (3048 mm) of the next preceding section shall be tested so that no joint of pipe in the building except the uppermost 10 feet (3048 mm) of a roof drainage system, which shall be filled with water to the flood level of the uppermost roof drain, shall have been submitted to a test of less than
2019 CALIFORNIA PLUMBING CODE 215
»
STORM DRAINAGE any other purpose or distributed to any other persons or parti es.
| TABLE 1103.1 SIZING ROOF DRAINS, LEADERS, AND VERTICAL RAINWATER PIPING2, 3 | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SIZE OF DRAIN, LEADER, OR PIPE |
FLOW |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
| inches |
gpm1 |
1 (in/h) |
2 (in/h) |
3 (in/h) |
4 (in/h) |
5 (in/h) |
6 (in/h) |
7 (in/h) |
8 (in/h) |
9 (in/h) |
10 (in/h) |
11 (in/h) |
12 (in/h) |
Notes:
Notes: 1 Maximum discharge capacity, gpm (L/s) with approximately 13⁄4 inch (44 mm) head of water at the drain. 2 For rainfall rates other than those listed, determine the allowable roof area by dividing the area given in the 1 inch per hour (25.4 mm/h) column by the desired rainfall rate. 3 Vertical piping shall be round, square, or rectangular. Square pipe shall be sized to enclose its equivalent round pipe. Rectangular pipe shall have not less than the same cross-sectional area as its equivalent round pipe, except that the ratio of its side dimensions shall not exceed 3 to 1.
216 2019 CALIFORNIA PLUMBING CODE
STORM DRAINAGE
»
STORM DRAINAGE
| TABLE 1103.2 SIZING OF HORIZONTAL RAINWATER PIPING1, 2 | ||
|---|---|---|
| SIZE OF PIPE | FLOW (1⁄8 inch per foot slope) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
| inches |
gpm |
1 (in/h) 2 (in/h) 3 (in/h) 4 (in/h) 5 (in/h) 6 (in/h) |
| SIZE OF PIPE | FLOW (1⁄4 inch per foot slope) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
| inches |
gpm |
1 (in/h) 2 (in/h) 3 (in/h) 4 (in/h) 5 (in/h) 6 (in/h) |
| SIZE OF PIPE | FLOW (1⁄2 inch per foot slope) |
MAXIMUM ALLOWABLE HORIZONTAL PROJECTED ROOF AREAS AT VARIOUS RAINFALL RATES (square feet) |
Notes: inches |
~~ = 25 mm, 1 gallon per minute = 0.06 L/s,1⁄8 inch per foot = 10.4 mm/m, 1 inch per hour = 25.4 mm/h, 1 square foot = 0.0929 m2~~ gpm 1 (in/h) 2 (in/h) 3 (in/h) 4 (in/h) 5 (in/h) 6 (in/h) |
~~ = 25 mm, 1 gallon per minute = 0.06 L/s,1⁄8 inch per foot = 10.4 mm/m, 1 inch per hour = 25.4 mm/h, 1 square foot = 0.0929 m2~~ gpm 1 (in/h) 2 (in/h) 3 (in/h) 4 (in/h) 5 (in/h) 6 (in/h) |
desired rainfall rate.
2019 CALIFORNIA PLUMBING CODE 217
STORM DRAINAGE any other purpose or distributed to any other persons or parti es.
| TABLE 1103.3 SIZE OF GUTTERS |
|||
|---|---|---|---|
| DIAMETER OF GUTTER (1⁄16inch per foot slope) |
MAXIMUM RAINFALL RATES BASED ON ROOF AREA (square feet) |
||
| inches |
2 (in/h) |
3 (in/h) 4 (in/h) 5 (in/h) |
6 (in/h) |
| DIAMETER OF GUTTER (1⁄8 inch per foot slope) |
MAXIMUM RAINFALL RATES BASED ON ROOF AREA (square feet) |
||
| inches |
2 (in/h) |
3 (in/h) 4 (in/h) 5 (in/h) |
6 (in/h) |
| DIAMETER OF GUTTER (1⁄4 inch per foot slope) |
MAXIMUM RAINFALL RATES BASED ON ROOF AREA (square feet) |
||
| inches |
2 (in/h) |
3 (in/h) 4 (in/h) 5 (in/h) |
6 (in/h) |
| DIAMETER OF GUTTER (1⁄2 inch per foot slope) |
MAXIMUM RAINFALL RATES BASED ON ROOF AREA (square feet) |
||
inches |
2 (in/h) |
3 (in/h) 4 (in/h) 5 (in/h) |
6 (in/h) |
218 2019 CALIFORNIA PLUMBING CODE
CALIFORNIA PLUMBING CODE – MATRIX ADOPTION TABLE
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
▸Chapter 11 — STORM DRAINAGE
Overview- 1101.2 Where Required. Roofs, paved areas, yards, courts,
- 1101.3 Storm Water Drainage to Sanitary Sewer Pro-hibited. Sto…
- 1101.4 Material Uses. Pipe, tube, and fittings conveying
- 1101.5 Expansion Joints Required. Expansion joints or
- 1101.6 Subsoil Drains. Subsoil drains shall be provided
- 1101.9 Window Areaway Drains. Window areaways at a
- 1101.10 Filling Stations and Motor Vehicle WashingEstablishmen…
- 1101.11 Paved Areas. Where the occupant creates surface
- 1101.12 Roof Drainage. Roof drainage shall comply with
- 1101.7 Building Subdrains. Building subdrains located
- 1101.8 Areaway Drains. Open subsurface space adjacent
- 1101.13 Cleanouts. Cleanouts for building storm drains
- 1101.16 Leaders, Conductors, and Connections.
- 1101.14 Rainwater Sumps. Rainwater sumps serving
- 1101.15 Traps on Storm Drains and Leaders. Leaders
- 1102.2 Dome Strainers Required. Roof drains shall have
- 1102.3 Roof Drain Flashings. The connection between
- 1103.2 Size of Horizontal Storm Drains and Sewers.
- 1103.3 Size of Roof Gutters. The size of semi-circular
- 1103.4 Side Walls Draining onto a Roof. Where vertical walls p…
- 1104.0 Values for Continuous Flow.1104.1 General. Where there …
- 1105.0 Controlled-Flow Roof Drainage.1105.1 Application. Inste…
- 1105.2 Setback Roofs. Drains on setback roofs shall be
- 1106.2 Siphonic Roof Drainage Systems. The design of
- 1106.3 Siphonic Roof Drains. Siphonic roof drains shall
- 1107.2 Methods of Testing Storm Drainage Systems. Except for o…
- Chapter 12 — FUEL GAS PIPING
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR