1103.4 Side Walls Draining onto a Roof.
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Where vertical walls project above a roof to permit storm water to drain into the roof area below, the adjacent roof area shall be permitted to be computed from Table 1103.1 as follows:
2019 CALIFORNIA PLUMBING CODE 213
STORM DRAINAGE any other purpose or distributed to any other persons or parti es.
(1) For one wall – add 50 percent of the wall area to the roof
area figures.
(1) For one wall – add 50 percent of the wall area to the roof
area figures. (2) For two adjacent walls of equal height – add 35 percent
of the total wall areas.
(6) The height of stones or other granular material above the
waterproofed surface shall not be considered in water
(2) For two adjacent walls of equal height – add 35 percent
of the total wall areas. (3) For two adjacent walls of unequal height – add 35 per cent of the total common height and add 50 percent of
(3) For two adjacent walls of unequal height – add 35 per cent of the total common height and add 50 percent of the remaining height of the highest wall. (4) Two opposite walls of same height – add no additional
area.
(6) The height of stones or other granular material above the
waterproofed surface shall not be considered in water depth measurement, and the roof surface in the vicinity of the drain shall not be recessed to create a reservoir. (7) Roof design, where controlled-flow roof drainage is
used, shall be such that the design roof live load is not
(4) Two opposite walls of same height – add no additional
area. (5) Two opposite walls of differing heights – add 50 percent
of the wall area above the top of the lower wall.
(5) Two opposite walls of differing heights – add 50 percent
of the wall area above the top of the lower wall. (6) Walls on three sides – add 50 percent of the area of the
inner wall below the top of the lowest wall, plus an
(7) Roof design, where controlled-flow roof drainage is
used, shall be such that the design roof live load is not less than 30 lb/ft 2 (146 kg/m 2 ) to provide a safety factor exceeding the 15 lb/ft 2 (73 kg/m 2 ) represented by the depth of water stored on the roof in accordance with Table 1105.1(1). (8) Scuppers shall be provided in parapet walls. The distance
of scupper bottoms above the roof level at the drains shall
(6) Walls on three sides – add 50 percent of the area of the
inner wall below the top of the lowest wall, plus an allowance for the area of the wall above the top of the lowest wall, in accordance with Section 1103.4(3) and Section 1103.4(5) above. (7) Walls on four sides – no allowance for wall areas below
the top of the lowest wall – add for areas above the top
(8) Scuppers shall be provided in parapet walls. The distance
of scupper bottoms above the roof level at the drains shall not exceed the maximum distances specified in Table 1105.1(2). (9) Scupper openings shall be not less than 4 inches (102
mm) high and have a width equal to the circumference of
Walls on four sides – no allowance for wall areas below
the top of the lowest wall – add for areas above the top of the lowest wall in accordance with Section 1103.4(1), Section 1103.4(3), Section 1103.4(5), and Section 1103.4(6) above.
(9) Scupper openings shall be not less than 4 inches (102
mm) high and have a width equal to the circumference of the roof drain required for the area served, sized in accordance with Table 1103.1. (10)Flashings shall extend above the top of the scuppers. (11) At a wall or parapet, 45 degree (0.79 rad) cants shall be
installed.
(11) At a wall or parapet, 45 degree (0.79 rad) cants shall be
installed. (12)Separate storm and sanitary drainage systems shall be
provided within the building.
(12)Separate storm and sanitary drainage systems shall be
provided within the building. (13)Calculations for the roof drainage system shall be sub mitted along with the plans to the Authority Having Juris
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
▸Chapter 11 — STORM DRAINAGE
Overview- 1101.2 Where Required. Roofs, paved areas, yards, courts,
- 1101.3 Storm Water Drainage to Sanitary Sewer Pro-hibited. Sto…
- 1101.4 Material Uses. Pipe, tube, and fittings conveying
- 1101.5 Expansion Joints Required. Expansion joints or
- 1101.6 Subsoil Drains. Subsoil drains shall be provided
- 1101.9 Window Areaway Drains. Window areaways at a
- 1101.10 Filling Stations and Motor Vehicle WashingEstablishmen…
- 1101.11 Paved Areas. Where the occupant creates surface
- 1101.12 Roof Drainage. Roof drainage shall comply with
- 1101.7 Building Subdrains. Building subdrains located
- 1101.8 Areaway Drains. Open subsurface space adjacent
- 1101.13 Cleanouts. Cleanouts for building storm drains
- 1101.16 Leaders, Conductors, and Connections.
- 1101.14 Rainwater Sumps. Rainwater sumps serving
- 1101.15 Traps on Storm Drains and Leaders. Leaders
- 1102.2 Dome Strainers Required. Roof drains shall have
- 1102.3 Roof Drain Flashings. The connection between
- 1103.2 Size of Horizontal Storm Drains and Sewers.
- 1103.3 Size of Roof Gutters. The size of semi-circular
- 1103.4 Side Walls Draining onto a Roof. Where vertical walls p…
- 1104.0 Values for Continuous Flow.1104.1 General. Where there …
- 1105.0 Controlled-Flow Roof Drainage.1105.1 Application. Inste…
- 1105.2 Setback Roofs. Drains on setback roofs shall be
- 1106.2 Siphonic Roof Drainage Systems. The design of
- 1106.3 Siphonic Roof Drains. Siphonic roof drains shall
- 1107.2 Methods of Testing Storm Drainage Systems. Except for o…
- Chapter 12 — FUEL GAS PIPING
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR