1210.1 Piping Underground. Underground gas piping

California Plumbing Code (Title 24, Part 5) · 2025 edition · updated 2026-09-10 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

shall be installed with sufficient clearance from any other underground structure to avoid contact therewith, to allow maintenance, and to protect against damage from proximity to other structures. Underground plastic piping shall be installed with sufficient clearance or shall be insulated from any source of heat so as to prevent the heat from impairing the serviceability of the pipe. [NFPA 54:7.1.1.1 – 7.1.1.2]

1210.1.1 Cover Requirements. Underground piping systems shall be installed with a minimum of 12 inches (305 mm) of cover. The minimum cover shall be increased to 18 inches (457 mm) if external damage to the pipe or tubing from external forces is likely to result. Where a minimum of 12 inches (305 mm) of cover cannot be provided, the piping shall be installed in conduit.

[NFPA 54:7.1.2.1 – 7.1.2.1(B)]

1210.1.2 Trenches. The trench shall be graded so that the pipe has a firm, substantially continuous bearing on the bottom of the trench. [NFPA 54:7.1.2.2]

1210.1.2.1 Backfilling. Where flooding of the trench is done to consolidate the backfill, care shall be exercised to see that the pipe is not floated from its firm bearing on the trench bottom. [NFPA 54:7.1.2.3]

1210.1.3 Protection Against Corrosion. Steel pipe and steel tubing installed underground shall be installed in accordance with Section 1210.1.3.1 through Section 1210.1.3.9. [NFPA 54:7.1.3]

1210.1.3.1 Zinc Coating. Zinc coating (galvanizing) shall not be deemed adequate protection for underground gas piping. [NFPA 54:7.1.3.1]

1210.1.3.2 Underground Piping. Underground piping shall comply with one or more of the following unless approved technical justification is provided to demonstrate that protection is unnecessary:

(1) The piping shall be made of corrosion-resistant material that is suitable for the environment in

which it will be installed.

(2) Pipe shall have a factory-applied, electrically insulating coating. Fittings and joints between sections of coated pipe shall be coated in accordance with the coating manufacturer’s instructions.

(3) The piping shall have a cathodic protection system installed, and the system shall be maintained in accordance with Section 1210.1.3.3 or

Section 1210.1.3.6. [NFPA 54:7.1.3.2]

SHUTOFF VALVE
APPLICATION
STANDARDS





Appliance shutoff valve up
to ½ psi
CSA/ANSI Z21.15/CSA 9.1





Appliance shutoff valve up
to ½ psi
ASME B16.44





Appliance shutoff valve up
to ½ psi
ASME B16.33 marked 125 G





Appliance shutoff valve up
to ½ psi
ANSI LC 4/CSA 6.32



Valve up to ½ psi
ASME B16.44



Valve up to ½ psi
ASME B16.33 marked 125 G



Valve up to ½ psi
ANSI LC 4/CSA 6.32






Valve up to 2 psi
ASME B16.44 labeled 2G






Valve up to 2 psi
ASME B16.33 marked 125 G






Valve up to 2 psi
ANSI LC 4/CSA 6.32 with
ASME B16.44 labeled 2G
or labeled 5G






Valve up to 2 psi
ANSI LC 4/CSA 6.32 with
ASME B16.33 marked 125 G





Valve up to 5 psi
ASME B16.44 labeled 5G





Valve up to 5 psi
ASME B16.33





Valve up to 5 psi
ANSI LC 4/CSA 6.32 with
ASME B16.44 marked 5G





Valve up to 5 psi
ANSI LC 4/CSA 6.32 with
ASME B16.33 marked 125 G



Valve up to 125 psi
ASME B16.33 marked 125 G



Valve up to 125 psi
ANSI LC 4/CSA 6.32 with
ASME B16.33 marked 125 G

For SI Units: 1 pound-force per square inch = 6.8947 kPa

FUEL GAS PIPING

1210.1.3.3 Cathodic Protection. Cathodic protection systems shall be monitored by testing and the results shall be documented. The test results shall demonstrate one of the following:

− (1) A pipe-to-soil voltage of 0.85 volts or more negative is produced, with reference to a saturated copper-copper sulfate half cell.

− (2) A pipe-to-soil voltage of 0.78 volts or more negative is produced, with reference to a saturated KCl calomel half cell.

− (3) A pipe-to-soil voltage of 0.80 volts or more negative is produced, with reference to a silversilver chloride half cell.

(4) Compliance with a method described in Appendix D of Title 49 of the code of Federal Regulations, Part 192. [NFPA 54:7.1.3.3]

1210.1.3.4 Sacrificial Anodes. Sacrificial anodes shall be tested in accordance with the following:

(1) Upon installation of the cathodic protection system, except where prohibited by climatic conditions, in which case the testing shall be performed not later than 180 days after the installation of the system.

(2) 12 to 18 months after the initial test.

(3) Upon successful verification testing in accordance with Section 1210.1.3.4(1) and Section 1210.1.3.4(2), periodic follow-up testing shall be performed at intervals not to exceed 36 months. [NFPA 54:7.1.3.4]

1210.1.3.5 System Failing Tests. Systems failing a test shall be repaired not more than 180 days after the date of the failed testing. The testing schedule shall be restarted as required in Section 1210.1.3.4(1) and Section 1210.1.3.4(2), and the results shall comply with Section 1210.1.3.3. [NFPA 54:7.1.3.5]

1210.1.3.6 Impressed Current Cathodic Pro- tection. Impressed current cathodic protection systems shall be inspected and tested in accordance with the following schedule:

(1) The impressed current rectifier voltage output shall be checked at intervals not exceeding two months.

(2) The pipe-to-soil voltage shall be tested at least annually. [NFPA 54:7.1.3.6]

1210.1.3.7 Documentation. Documentation of

the results of the two most recent tests shall be retained. [NFPA 54:7.1.3.7]

1210.1.3.8 Dissimilar Metals. Where dissimilar metals are joined underground, an insulating coupling or fitting shall be used. [NFPA 54:7.1.3.8]

1210.1.3.9 Steel Risers. Steel risers, other than anodeless risers, connected to plastic piping shall be cathodically protected by means of a welded anode.

[NFPA 54:7.1.3.9]

1210.1.4 Protection Against Freezing. Where the formation of hydrates or ice is known to occur, piping shall be protected against freezing. [NFPA 54:7.1.4] 1210.1.5 Piping through Foundation Wall. Piping through a foundation wall shall comply with all of the following:

(1) Underground piping, where installed through the outer foundation or basement wall of a building, shall be encased in a protective sleeve or protected by an approved device or method.

(2) The spaces between the gas piping and the sleeve and between the sleeve and the wall shall be sealed to prevent entry of gas and water.

(3) Sealing materials shall be compatible with the piping and sleeve. [NFPA 54:7.1.5] 1210.1.6 Piping Underground Beneath Buildings. Where gas piping is installed underground beneath buildings, the piping shall be either of the following:

(1) Encased in an approved conduit designed to withstand the imposed loads and installed in accordance with Section 1210.1.6.1 or Section 1210.1.6.2.

(2) A piping/encasement system listed for installation beneath buildings. [NFPA 54:7.1.6]

1210.1.6.1 Conduit with One End Terminat- ing Outdoors. The conduit shall extend into an accessible portion of the building and, at the point where the conduit terminates in the building, the space between the conduit and the gas piping shall be sealed to prevent the possible entrance of any gas leakage. Where the end sealing is of a type that retains the full pressure of the pipe, the conduit shall be designed for the same pressure as the pipe. The conduit shall extend at least 4 inches (102 mm) outside the building, be vented outdoors above finished ground level, and be installed so as to prevent the entrance of water and insects. [NFPA 54:7.1.6.1]

1210.1.6.2 Conduit with Both Ends Terminat- ing Indoors. Where the conduit originates and terminates within the same building, the conduit shall originate and terminate in an accessible portion of the building and shall not be sealed. [NFPA 54:7.1.6.2] 1210.1.7 Connections of Plastic Piping. Plastic piping shall be installed outdoors, underground only.

Exceptions :

(1) Plastic piping shall be permitted to terminate aboveground where an anodeless riser is used.

(2) Plastic piping shall be permitted to terminate with a wall head adapter aboveground in buildings, including basements, where the plastic piping is inserted in a piping material permitted for use in buildings.

[NFPA 54:7.1.7.1]

1210.1.7.1 Connections Between Metallic and Plastic Piping. Connections made between metallic and plastic piping shall be made with fittings conforming to one of the following:

224 2025 CALIFORNIA PLUMBING CODE

FUEL GAS PIPING

(1) ASTM D2513, Category I transition fittings

(2) ASTM F1973

(3) ASTM F2509 [NFPA 54:7.1.7.2] 1210.1.7.2 Tracer Wire. An electrically continuous corrosion-resistant tracer shall be buried with the plastic pipe to facilitate locating. The tracer shall be one of the following:

(1) A product specifically designed for that pur pose.

(2) Insulated copper conductor not less than 14 AWG.

Where tracer wire is used, access shall be provided from aboveground, or one end of the tracer wire or tape shall be brought aboveground at a building wall or riser. [NFPA 54:7.1.7.3 – 7.1.7.3.2]

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Plumbing Code (Title 24, Part 5)
California Plumbing Code (Title 24, Part 5)
  1. Chapter 1 — GENERAL CODE PROVISIONS
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REGULATIONS
  4. Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
  5. Chapter 5 — WATER HEATERS
  6. Chapter 6 — WATER SUPPLY AND DISTRIBUTION
  7. Chapter 7 — SANITARY DRAINAGE
  8. Chapter 8 — INDIRECT WASTES
  9. Chapter 9 — VENTS
  10. Chapter 10 — TRAPS AND INTERCEPTORS
  11. Chapter 11 — STORM DRAINAGE
  12. Chapter 12 — FUEL GAS PIPING
    Overview
    1. 1201.1 Applicability. The regulations of this chapter shall
    2. 1202.1 General. Coverage of piping systems shall extend
    3. 1202.2 Piping System Requirements. Requirements for
    4. 1202.3 Applications. This chapter shall not apply to the
    5. 1203.1 Inspection Notification. Upon completion of the
    6. 1203.2 Excavation. Excavations required for the installation o…
    7. 1203.3 Type of Inspections. The Authority Having Jurisdiction …
    8. 1203.4 Inspection Waived. In cases where the work
    9. 1204.1 Issuance. Whereupon final piping inspection, the
    10. 1204.2 Gas Supplier. A copy of the certificate of such final
    11. 1204.3 Unlawful. It shall be unlawful for a serving gas suppli…
    12. 1205.1 Authorized Personnel. It shall be unlawful for a
    13. 1205.2 Outlets. It shall be unlawful to turn on or connect gas
    14. 1206.1 Disconnection. The Authority Having Jurisdiction
    15. 1206.2 Notice. Where such disconnection has been made, a
    16. 1206.3 Capped Outlets. It shall be unlawful to remove or
    17. 1207.1 General. Where temporary use of gas is desired, and
    18. 1208.1 Installation of Piping System. Where required
    19. 1208.2 Interconnections Supplying Separate Users.
    20. 1208.3 Sizing of Gas Piping Systems. Gas piping systems shall …
    21. 1208.4 Maximum Operating Pressure in Buildings.
    22. 1208.5 Acceptable Piping Materials and Joining
    23. 1208.6 Gas Meters. Gas meters shall be selected for the
    24. 1208.7 Gas Pressure Regulators. A line pressure regulator shal…
    25. 1208.8 Overpressure Protection Required. Where the
    26. 1208.9 Overpressure Protection Devices. Overpressure protectio…
    27. 1208.10 Pressure Limitation Requirements. Where piping systems…
    28. 1208.11 Backpressure Protection. Protective devices
    29. 1208.12 Low-Pressure Protection. A protective device
    30. 1208.13 Shutoff Valves. Shutoff valves shall be selected in
    31. 1208.14 Expansion and Flexibility. Piping systems shall
    32. 1208.15 Pressure Regulator and Pressure Control
    33. 1209.1 General. Where automatic excess flow valves are
    34. 1210.1 Piping Underground. Underground gas piping
    35. 1210.2 CSST Piping Systems. CSST piping systems shall
    36. 1210.3 Installation of Aboveground Piping. Piping
    37. 1210.4 Concealed Piping in Buildings. Gas piping in
    38. 1210.5 Piping in Vertical Chases. Where gas piping
    39. 1210.6 Gas Pipe Turns. Changes in direction of gas pipe
    40. 1210.7 Drips and Sediment Traps. For other than dry gas
    41. 1210.8 Outlets. Outlets shall be located and installed in
    42. 1210.9 Manual Gas Shutoff Valves. An accessible gas
    43. 1210.10 Prohibited Devices. Devices shall not be placed
    44. 1210.11 Systems Containing Gas-Air Mixtures Out-
    45. 1210.12 Systems Containing Flammable Gas-Air
    46. 1211.1 Pipe and Tubing Other than CSST. Each aboveground porti…
    47. 1211.2 Bonding of CSST Gas Piping. CSST gas piping
    48. 1211.3 Arc-Resistant Jacketed CSST. CSST listed with
    49. 1211.4 Prohibited Use. Gas piping shall not be used as a
    50. 1211.5 Lightning Protection System. Where a lightning
    51. 1211.6 Electrical Circuits. Electrical circuits shall not util…
    52. 1211.7 Electrical Connections. All electrical connections
    53. 1211.8 Earthquake-Actuated Gas Shutoff Valves.
    54. 1212.1 Connecting Appliances and Equipment.
    55. 1212.4 Injection (Bunsen) Burners. Injection (Bunsen)
    56. 1212.5 Connection of Portable and Mobile Industrial
    57. 1212.6 Appliance Shutoff Valves and Connections.
    58. 1212.7 Quick-Disconnect Devices. Quick-disconnect
    59. 1212.2 Suspended Low-Intensity Infrared Tube
    60. 1212.3 Use of Nonmetallic Gas Hose Connectors.
    61. 1212.8 Gas Convenience Outlets. Appliances shall be
    62. 1212.9 Sediment Trap. Where a sediment trap is not incorporate…
    63. 1212.10 Installation of Piping. Piping shall be installed in
    64. 1212.11 Liquefied Petroleum Gas Facilities and Pip-
    65. 1213.1 Piping Installations. Prior to acceptance and initial o…
    66. 1213.2 Test Preparation. Test preparation shall comply
    67. 1213.3 Test Pressure. This inspection shall include an air,
    68. 1213.4 Detection of Leaks and Defects. The piping system shall…
    69. 1213.5 Piping System Leak Test. Leak checks using fuel
    70. 1213.6 Purging Requirements. The purging of piping
    71. 1214.1 General. The following regulations shall comply
    72. 1214.2 Volume. The hourly volume of gas required at each
    73. 1214.3 Gas Appliances. Where the gas appliances to be
    74. 1214.4 Size of Piping Outlets. The size of the supply piping o…
    75. 1215.1 Pipe Sizing Methods. Where the pipe size is to be
    76. 1215.2 Sizing of Gas Piping Systems. Sizing of piping
    77. 1215.3 Sizing Equations. The inside diameter of smooth
    78. 1215.4 Sizing of Piping Sections. To determine the size
    79. 1215.5 Engineering Methods. For conditions other than
    80. 1215.6 Variable Gas Pressure. Where the supply gas
  13. Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
  14. Chapter 14 — FIRESTOP PROTECTION
  15. Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
  16. Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
  17. Chapter 17 — REFERENCED STANDARDS
  18. Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
  19. Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
  20. Appendix C — ALTERNATE PLUMBING SYSTEMS
  21. Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
  22. Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
  23. Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
  24. Appendix G — SIZING OF VENTING SYSTEMS
  25. Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
  26. Appendix I — INSTALLATION STANDARDS
  27. Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
  28. Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
  29. Appendix L — SUSTAINABLE PRACTICES
  30. Appendix M — PEAK WATER DEMAND CALCULATOR
  31. Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …
  32. Appendix O — NON-SEWERED SANITATION SYSTEMS
  33. Appendix P — PROFESSIONAL QUALIFICATIONS
  34. Appendix Q — INDOOR HORTICULTURAL FACILITIES
  35. Appendix R — TINY HOUSES
  36. Appendix S — ONSITE STORMWATER TREATMENT SYSTEMS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.