1220.4 Snow and Ice Melt Controls.
California Mechanical Code (Title 24, Part 4) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
An automatic thermostatically operating control device that controls the supply hydronic solution temperature to the snow and ice melt area shall be installed in the system. Snow and ice melt systems shall be protected from freezing with a mixture of propylene glycol or ethylene glycol, and water or other approved fluid. Automotive antifreeze shall not be used.
1220.4.1 Tube Placement. Snow and ice melt tubing shall be installed in accordance with the manufacturer’s installation instructions and with the tube layout and spacing in accordance with the system design. Except for distribution mains, tube spacing and the individual loop lengths shall be installed with a variance of not more than ±10 percent from the design.
The maximum loop length of continuous tubing from a supply-and-return manifold arrangement shall not exceed the lengths specified by the manufacturer or, in the absence of manufacturer’s specifications, the lengths specified in Table 1220.4.1. Actual loop lengths shall be determined by spacing, flow rate, and pressure drop in accordance with the system design.
TABLE 1220.4.1 LOOP LENGTHS FOR SNOW AND ICE MELT SYSTEMS 1,2
| NOMINAL TUBE SIZE (inches) |
MAXIMUM ACTIVE LOOP LENGTH (feet) |
TOTAL LOOP LENGTH (feet) |
|---|---|---|
PE-RT and PEX Tubing |
PE-RT and PEX Tubing |
PE-RT and PEX Tubing |
1_/_2 |
115 | 140 |
5/8 |
225 | 250 |
3_/_4 |
300 | 325 |
1 |
450 | 475 |
Copper Tubing3 |
Copper Tubing3 |
Copper Tubing3 |
1_/_2 |
– | 140 |
3_/_4 |
– | 280 |
For SI units: 1 inch = 25.4 mm, 1 foot = 304.8 mm
Notes:
1 The total PE-RT and PEX loop lengths consist of two separate sections, the active loop, and the leader length. The active loop is installed within the heated slab. The leader length is the total distance to and from the manifold and heated slab, including any vertical distances.
2 The manifolds shall be installed as close to the snow melt area as possible.
3 In concrete use minimum Type L copper water tubing. In bituminous pavement use a Type K copper water tubing.
1220.4.2 Poured Structural Concrete Slab Sys- tems. Where tubes are embedded in a structural concrete slab, such tubes shall not be larger in outside dimension than one-third of the overall thickness of the slab and shall be spaced not less than three diameters on center except within 10 feet (3048 mm) of the distribution manifold. The top of the tubing shall be embedded in the slab not less than 2 inches (51 mm) below the surface of the finished concrete slab.
1220.4.3 Slab Penetration Tube and Joint Pro- tection. Where embedded in or installed under a concrete slab, tubing shall be protected from damage at
penetrations of the slab with protective sleeving approved by the tubing manufacturer. The space between the tubing and sleeve shall be sealed with an approved sealant compatible with the tubing. The tubing at the location of an expansion joint in a concrete slab shall be encased in a protective pipe sleeve that covers the tubing not less than 12 inches (305 mm) on either side of the joint or the tubing shall be installed below the slab. 1220.4.4 Concrete Slab Preparation. A solid foundation shall be prepared before the tubing is installed. Compaction shall be used for slabs, sidewalks, and driveways. 1220.4.5 Insulation. Where a poured concrete snow melt system is installed in contact with the soil, insulation recommended by the manufacturer for such application and with a minimum R-value of 5 shall be placed between the concrete and the compacted grade; and be extended as close as practicable to the outside edges of the concrete.
1220.4.5.1 California Energy Code Insulation Requirements for Heated Slab Floors. See California Energy Code Section 110.8(g) and Table 110.8-A for additional insulation requirements for heated slab floors – a higher level of insulation is required for Climate Zone 16, and more detailed requirements for installing insulation are specified in all climate zones. 1220.4.6 Testing and Flushing. Testing of snow and ice melt systems shall be in accordance with Section 1205.2 and flushing shall be in accordance with Section 1205.3.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Mechanical Code (Title 24, Part 4)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — VENTILATION AIR
- Chapter 5 — EXHAUST SYSTEMS
- Chapter 6 — DUCT SYSTEMS
- Chapter 7 — COMBUSTION AIR
- Chapter 8 — CHIMNEYS AND VENTS
- Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
- Chapter 10 — BOILERS AND PRESSURE VESSELS
- Chapter 11 — REFRIGERATION
▸Chapter 12 — HYDRONICS
Overview- 1201.1 Applicability. This chapter shall apply to hydronic
- 1201.2 Insulation. Surfaces within reach of building occupants…
- 1201.3 Water Hammer. The piping system shall be
- 1201.4 Terminal Units. Terminal units, valves, and flow
- 1201.5 Return-Water Low-Temperature Protection.
- 1202.1 Prohibited Sources. Hydronic systems or parts
- 1202.2 Chemical Injection. Where systems include an
- 1202.3 Compatibility. Fluids used in hydronic systems
- 1203.1 Heat Source. The heat source shall be sized to the
- 1203.2 Dual Purpose Water Heater. Water heaters utilized for c…
- 1203.3 Tankless Water Heaters. Tankless water heaters
- 1204.1 General. In buildings where potable water and nonpotabl…
- 1204.2 Color and Information. Each system shall be identified …
- 1204.3 Potable Water. Potable water systems shall be identifie…
- 1204.4 Nonpotable Water. Nonpotable water systems
- 1204.5 Location of Piping Identification. The background
- 1204.6 Flow Directions. Flow directions shall be indicated
- 1205.1 Operating Instructions. Operating and maintenance
- 1205.2 Pressure Testing. System piping and components
- 1205.3 Flushing. Heating and cooling sources, system piping an…
- 1206.1 General. Each closed hydronic system shall be protected…
- 1206.2 Discharge Piping. The discharge piping serving a
- 1207.1 General. Heating appliances, equipment, safety and
- 1207.2 Boilers. Boilers and their control systems shall comply…
- 1207.3 Dual-Purpose Water Heaters. Water heaters used
- 1207.4 Solar Heat Collector Systems. Solar water heating syste…
- 1208.1 General. Circulators and pumps shall be selected
- 1208.2 Mounting. The circulator or pump shall be installed
- 1208.3 Sizing. The selection and sizing of a circulator or
- 1209.1 General. An expansion tank shall be installed in each
- 1209.2 Installation. Expansion tanks shall be accessible for
- 1209.3 Open-Type Expansion Tanks. Open type expansion tanks sh…
- 1209.4 Closed-Type Tanks. Closed-type expansion tanks
- 1209.5 Sizing. Expansion tanks shall be sized to accept the
- 1210.1 Piping, Tubing, and Fittings. Hydronic pipe and
- 1210.2 Expansion and Contraction. Pipe and tubing shall
- 1210.3 Hangers and Supports. Pipe and tubing shall be
- 1210.4 Oxygen Diffusion Corrosion. PEX and PE-RT tubing in clo…
- 1211.1 General. Joints and connections shall be of an
- 1211.2 Chlorinated Polyvinyl Chloride (CPVC) Pipe.
- 1211.3 CPVC/AL/CPVC Plastic Pipe and Joints. Joints
- 1211.4 Copper or Copper Alloy Pipe and Tubing.
- 1211.5 Cross-Linked Polyethylene (PEX) Pipe. Joints
- 1211.6 Cross-Linked Polyethylene/Aluminum/Cross-
- 1211.7 Ductile Iron Pipe. Joints between ductile iron pipe
- 1211.8 Polyethylene (PE) Plastic Pipe/Tubing. Joints
- 1211.9 Polyethylene/Aluminum/Polyethylene (PE-AL-
- 1211.10 Polyethylene of Raised Temperature (PE-RT).
- 1211.11 Polypropylene (PP) Pipe. Joints between
- 1211.12 Polyvinyl Chloride (PVC) Pipe. Joints between
- 1211.13 Steel Pipe and Tubing. Joints between steel pipe
- 1211.14 Joints Between Various Materials. Joints
- 1212.1 General. Valves shall be rated for the operating temper…
- 1212.2 Where Required. Valves shall be installed in
- 1212.3 Heat Exchanger. Isolation valves shall be installed
- 1212.4 Pressure Vessels. Isolation valves shall be installed
- 1212.5 Pressure Reducing Valves. Isolation valves shall
- 1212.6 Equipment, Components, and Appliances. Serviceable equi…
- 1212.7 Expansion Tank. Isolation valves shall be installed
- 1212.8 Flow Balancing Valves. Where flow balancing
- 1212.9 Mixing or Temperature Control Valves. Where
- 1212.10 Thermosiphoning. An approved type check valve
- 1212.11 Air Removal Device or Air Vents. Isolation valves
- 1213.1 Water Temperature Controls. A heat source or system of …
- 1213.2 Operating Steam Controls. A steam heat source or
- 1213.3 Occupied Spaces. A temperature-sensing device
- 1213.4 Simultaneous Operation. Radiant heating and cooling sys…
- 1213.5 Temperature Reading. A temperature gauge or
- 1214.1 Balancing. A means for balancing distribution
- 1214.2 Low-Water Control. Direct-fired heat sources
- 1214.3 Flow-Sensing Devices. A direct-fired heat source,
- 1214.4 Automatic Makeup Fluid. Where an automatic
- 1214.5 Differential Pressure Regulation. Provisions
- 1214.6 Air-Removal Device. Provision shall be made for
- 1214.7 Air-Separation Device. To assist with the removal
- 1214.8 Secondary Loops. Secondary loops that are isolated from…
- 1215.1 General. Based on the system design, the heat-distribut…
- 1215.2 Installation. Heat-distribution units shall be
- 1215.3 Freeze Protection. Hydronic systems and components shal…
- 1215.4 Balancing. System loops shall be installed so that
- 1215.5 Heat Transfer Fluid. The ignitable flash point of
- 1216.1 Steam Traps. For other than one-pipe steam systems, eac…
- 1216.2 Sloping for Two-Pipe System. Two-pipe steam
- 1216.3 Sloping for One-Pipe System. One-pipe steam
- 1216.4 Automatic Air Vents. Steam automatic air vents
- 1216.5 Condensate Flow. System piping shall be installed
- 1216.6 Steam-Distribution Piping. Where multi-row elements are…
- 1217.1 Installation. Radiant heating and cooling systems
- 1217.2 Radiant Under-Floor Heating. Floor finished surface tem…
- 1217.3 Radiant Cooling Systems. Radiant cooling systems shall …
- 1217.4 Tube Placement. Hydronic radiant system tubing
- 1217.6 Joist Systems and Subfloors. Where tubing is
- 1217.7 Wall and Ceiling Panels. Where piping is installed
- 1217.5 Poured Floor Structural Concrete Slab Sys-
- 1219.1 General. Domestic hot-water heat exchangers,
- 1220.1 Use of Chemical Additives and Corrosive Flu-
- 1220.2 Types of Tube Fasteners. Tubing that is embedded within…
- 1220.3 Spacing of Tube Fasteners. The maximum spacing between …
- 1217.8 Radiant Heating and Cooling Panels. Radiant
- 1218.1 General. Systems utilizing heat exchangers shall
- 1220.4 Snow and Ice Melt Controls. An automatic thermostatical…
- 1220.5 Hydronic Makeup Air Units. Hydronic makeup
- 1221.1 General. Piping, fittings, and connections shall be
- 1221.2 Embedded Piping Materials and Joints. Piping embedded i…
- 1221.3 Pressure Testing. Piping to be embedded in concrete sha…
- 1221.4 System Drainage. Hydronic piping systems shall
- 1221.5 Condensate Drainage. Condensate drains from
- 1221.6 Clearance to Combustibles. Hydronic piping
- Chapter 13 — FUEL GAS PIPING
- Chapter 14 — PROCESS PIPING
- Chapter 15 — SOLAR ENERGY SYSTEMS
- Chapter 16 — STATIONARY POWER PLANTS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
- Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
- Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
- Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
- Appendix E — SUSTAINABLE PRACTICES
- Appendix F — GEOTHERMAL ENERGY SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
- Appendix H — EXAMPLE CALCULATION OF OUTDOOR AIR RATE