Appendix A — GUIDELINES FOR THE SEISMIC RETROFIT OF EXISTING BUILDINGS
Section A112 — ANALYSIS AND DESIGN
2025 California Existing Building Code (Title 24, Part 10) · 2025 edition · updated 2026-07-27 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
[BS] A112.1 General. The following requirements are applicable to both the general procedure and the special procedure for analyzing vertical elements of the lateral force-resisting system.
[BS] A112.2 In-plane shear of unreinforced masonry walls.
[BS] A112.2.1 Flexural rigidity. Flexural components of deflection need not be considered in determining the rigidity of an unreinforced masonry wall.
[BS] A112.2.2 Shear walls with openings. Wall piers shall be analyzed according to the following procedure, which is diagrammed in Figure A112.2.2.
- For any pier: 1.1. The pier shear capacity shall be calculated as:
Equation A1-18 v a = v m A n
where:
A n = area of net mortared or grouted section of a wall or wall pier. 1.2. The pier rocking shear capacity shall be calculated as:
Equation A1-19 V r = 0.9 P D D / H 2. The wall piers at any level are acceptable if they comply with one of the following modes of behavior: 2.1. Rocking controlled mode. Where the pier rocking shear capacity is less than the pier shear capacity, in other words, V r < v a, for each pier in a level, forces in the wall at that level, V wx, shall be distributed to each pier in proportion to P D D/H .
For the wall at that level:
Equation A1-20 0.7 V wx < SV r 2.2. Shear controlled mode. Where the pier shear capacity is less than the pier rocking capacity, in other words, v a < V r in one or more pier(s) in a level, forces in the wall at the level, V wx, shall be distributed to each pier in proportion to D/H .
For each pier at that level: Equation A1-21 V p < v a
and
Equation A1-22 V p < V r If V p < v a for each pier and V p - V r for one or more piers, such piers shall be omitted from the analysis, and the procedure shall be repeated for the remaining piers, unless the wall is strengthened and reanalyzed. 3. Masonry pier tension stress. Unreinforced masonry wall piers need not be analyzed for tension stress.
APPENDIX A-14 2025 CALIFORNIA EXISTING BUILDING CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX A—GUIDELINES FOR THE SEISMIC RETROFIT OF EXISTING BUILDINGS
[BS] FIGURE A112.2.2—ANALYSIS OF URM WALL IN-PLANE SHEAR FORCES
PIER IS OVERSTRESSED IN SHEAR
V a = Allowable shear strength of a pier.
V p = Shear force assigned to a pier on the basis of a relative shear rigidity analysis.
RETURN
V r
V WX
∑ V r
= Rocking shear capacity of pier.
= Total shear force resisted by the wall.
= Rocking shear capacity of all piers in the wall.
[BS] A112.2.3 Shear walls without openings. Shear walls without openings shall be analyzed the same as for walls with openings, except that V r shall be calculated as follows: Equation A1-23 V r = 0.9( P D + 0.5 P w ) D / H
[BS] A112.3 Plywood-sheathed shear walls. Plywood-sheathed shear walls may be used to resist lateral forces for URM buildings with flexible diaphragms analyzed according to provisions of Section A111. Plywood-sheathed shear walls shall not be used to share lateral forces with other materials along the same line of resistance.
[BS] A112.4 Combinations of vertical elements.
[BS] A112.4.1 Seismic force distribution. Seismic forces shall be distributed among the vertical-resisting elements in proportion to their relative rigidities, except that moment-resisting frames shall comply with Section A112.4.2.
[BS] A112.4.2 Moment-resisting frames. Moment resisting frames shall not be used with an unreinforced masonry wall in a single line of resistance unless the wall has piers that have adequate shear capacity to sustain rocking in accordance with Section A112.2.2. The frames shall be designed in accordance with the building code to resist 100 percent of the seismic forces tributary to that line of resistance, as determined from Section A111.2. The story drift ratio shall be limited to 0.0075.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — 2025 California Existing Building Code (Title 24, Part 10)
- 104.11 for consideration of alternative means of compliance.
- Chapter 1 — ADMINISTRATION
- Chapter 2 — DEFINITIONS
- Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 3A — PROVISIONS FOR ALL COMPLIANCE METHODS
- Chapter 4 — REPAIRS
- Chapter 4A — REPAIRS
- Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 5A — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 6 — CLASSIFICATION OF WORK
- Chapter 7 — ALTERATIONS—LEVEL 1
- Chapter 8 — ALTERATIONS—LEVEL 2
- Chapter 9 — ALTERATIONS—LEVEL 3
- Chapter 10 — CHANGE OF OCCUPANCY
- Chapter 11 — ADDITIONS
- Chapter 12 — HISTORIC BUILDINGS
- Chapter 13 — PERFORMANCE COMPLIANCE METHODS
- Chapter 14 — RELOCATED OR MOVED BUILDINGS
- Chapter 15 — CONSTRUCTION SAFEGUARDS
- Chapter 16 — REFERENCED STANDARDS
-
▸ Appendix A — GUIDELINES FOR THE SEISMIC RETROFIT OF EXISTING B…
Overview- Section A100 — APPLICATION
- Section A101 — PURPOSE
- Section A102 — SCOPE
- Section A103 — DEFINITIONS
- Section A104 — SYMBOLS AND NOTATIONS
- Section A105 — GENERAL REQUIREMENTS
- Section A106 — MATERIALS REQUIREMENTS
- Section A107 — QUALITY CONTROL
- Section A108 — DESIGN STRENGTHS
- Section A109 — ANALYSIS AND DESIGN PROCEDURE
- Section A110 — GENERAL PROCEDURE
- Section A111 — SPECIAL PROCEDURE
- Section A112 — ANALYSIS AND DESIGN
- Section A113 — DETAILED BUILDING SYSTEM DESIGN REQUIREMENTS
- Section A114 — WALLS OF UNBURNED CLAY, ADOBE OR STONE MASONRY
- Section A201 — PURPOSE
- Section A202 — SCOPE
- Section A203 — DEFINITIONS
- Section A204 — SYMBOLS AND NOTATIONS
- Section A205 — GENERAL REQUIREMENTS
- Section A206 — ANALYSIS AND DESIGN
- Section A207 — MATERIALS OF CONSTRUCTION
- Section A301 — GENERAL
- Section A302 — DEFINITIONS
- Section A303 — STRUCTURAL WEAKNESSES
- Section A304 — STRENGTHENING REQUIREMENTS
- Section A401 — GENERAL
- Section A402 — DEFINITIONS
- Section A403 — ANALYSIS AND DESIGN
- Section A404 — PRESCRIPTIVE MEASURES FOR WEAK STORY
- Section A405 — MATERIALS OF CONSTRUCTION
- Section A406 — CONSTRUCTION DOCUMENTS
- Section A407 — QUALITY CONTROL
- Section A501 — REFERENCED STANDARDS
- Appendix B — SUPPLEMENTARY ACCESSIBILITY REQUIREMENTS FOR EXIS…
- Appendix C — GUIDELINES FOR THE WIND RETROFIT OF EXISTING BUIL…
- Appendix D — BOARD OF APPEALS
- Appendix E — TEMPORARY EMERGENCY USES
- Appendix A — GUIDELINES ON FIRE RATINGS OF ARCHAIC MATERIALS A…