Chapter 18 — SOILS AND FOUNDATIONS
Section 1803
California Building Code (Title 24, Part 2) · 2022 edition · updated 2026-09-12 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
1803.1 General.¶
Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. [OSHPD 1R, 2 & 5] The classification, testing and investigation of the soil shall be made under the respon- sible charge of a California registered geotechnical engineer. All recommendations contained in geotechnical and geohaz- ard reports shall be subject to the approval of the enforcement agency. All reports shall be prepared and signed by a registered geotechnical engineer, certified engineering geologist and a registered geophysicist, where applicable.
1803.1.1 General and where required for applications listed in Section 1.8.2.1.1 regulated by the Department of Housing and Community Development. [HCD 1] Foun- dation and soils investigations shall be conducted in con- formance with Health and Safety Code Sections 17953 through 17957 as summarized below.
1803.1.1.1 Preliminary soil report. Each city, county, or city and county shall enact an ordinance which requires a preliminary soil report, prepared by a civil engineer who is registered by the state. The report shall be based upon adequate test borings or excavations, of every sub- division, where a tentative and final map is required pur- suant to Section 66426 of the Government Code.
The preliminary soil report may be waived if the building department of the city, county, or city and county, or other enforcement agency charged with the administration and enforcement of the provisions of Section 1803.1.1, shall determine that, due to the
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
SOILS AND FOUNDATIONS
knowledge such department has as to the soil qualities of the soil of the subdivision or lot, no preliminary analysis is necessary.
1803.1.1.2 Soil investigation by lot, necessity, prepara- tion and recommendations. If the preliminary soil report indicates the presence of critically expansive soils or other soil problems which, if not corrected, would lead to structural defects, such ordinance shall require a soil investigation of each lot in the subdivision.
The soil investigation shall be prepared by a civil engineer who is registered in this state. It shall recom- mend corrective action which is likely to prevent struc- tural damage to each dwelling proposed to be constructed on the expansive soil.
1803.1.1.3 Approval, building permit conditions, appeal. The building department of each city, county, or city and county, or other enforcement agency charged with the administration and enforcement of the provisions of Section 1803.1.1, shall approve the soil investigation if it determines that the recommended action is likely to prevent structural damage to each dwelling to be constructed. As a condition to the build- ing permit, the ordinance shall require that the approved recommended action be incorporated in the construction of each dwelling. Appeal from such deter- mination shall be to the local appeals board.
1803.1.1.4 Liability. A city, county, city and county, or other enforcement agency charged with the administra- tion and enforcement of the provisions of Section 1803.1.1, is not liable for any injury which arises out of any act or omission of the city, county, city and county, other enforcement agency, or a public employee or any other person under Section 1803.1.1. 1803.1.1.5 Alternate procedures. The governing body of any city, county, or city and county may enact an ordinance prescribing an alternate procedure which is equal to or more restrictive than the procedure speci- fied in Section 1803.1.1.
1803.2 Investigations required.¶
Geotechnical investigations shall be conducted in accordance with Sections 1803.3 through 1803.5.
Exception: The building official shall be permitted to waive the requirement for a geotechnical investigation where satisfactory data from adjacent areas is available that demonstrates an investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and Sections 1803.5.10 and 1803.5.11.
[OSHPD 2] Geotechnical reports are not required for one-story, wood-frame and light-steel-frame buildings of Type V construction and 4,000 square feet (371 m 2 ) or less in floor area, not located within Earthquake Fault Zones or Seismic Hazard Zones as shown in the most recently published maps from the California Geological Survey (CGS). Allowable foundation and lateral soil pressure val- ues may be determined from Table 1806.2.
1803.3 Basis of investigation.¶
Soil classification shall be based on observation and any necessary tests of the materials
disclosed by borings, test pits or other subsurface exploration made in appropriate locations. Additional studies shall be made as necessary to evaluate slope stability, soil strength, position and adequacy of load-bearing soils, the effect of moisture variation on soil-bearing capacity, compressibility, liquefaction and expansiveness.
1803.3.1 Scope of investigation. The scope of the geotechnical investigation including the number and types of borings or soundings, the equipment used to drill or sample, the in-situ testing equipment and the laboratory testing program shall be determined by a registered design professional.
[OSHPD 1R, 2 & 5] There shall not be less than one boring or exploration shaft for each 5,000 square feet (465 m 2 ) of building area at the foundation level with a minimum of two provided for any one building. A bor- ing may be considered to reflect subsurface conditions relevant to more than one building, subject to the approval of the enforcement agency.
Borings shall be of sufficient size to permit visual examination of the soil in place or, in lieu thereof, cores shall be taken.
Borings shall be of sufficient depth and size to ade- quately characterize subsurface conditions.
Exception: Single-story Type V skilled nursing or intermediate care facilities utilizing wood-frame or light-steel frame construction.
1803.4 Qualified representative.¶
The investigation procedure and apparatus shall be in accordance with generally accepted engineering practice. The registered design professional shall have a fully qualified representative on site during all boring or sampling operations.
1803.5 Investigated conditions.¶
Geotechnical investigations shall be conducted as indicated in Sections 1803.5.1 through 1803.5.12.
1803.5.1 Classification. Soil materials shall be classified in accordance with ASTM D2487.
1803.5.2 Questionable soil. Where the classification, strength or compressibility of the soil is in doubt or where a load-bearing value superior to that specified in this code is claimed, the building official shall be permitted to require that a geotechnical investigation be conducted.
1803.5.3 Expansive soil. In areas likely to have expansive soil, the building official shall require soil tests to determine where such soils do exist.
Soils meeting all four of the following provisions shall be considered to be expansive, except that tests to show compliance with Items 1, 2 and 3 shall not be required if the test prescribed in Item 4 is conducted:
Plasticity index (PI) of 15 or greater, determined in accordance with ASTM D4318.
More than 10 percent of the soil particles pass a No.200 sieve (75 µm), determined in accordance with ASTM D422.
18-4 2022 CALIFORNIA BUILDING CODE
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
More than 10 percent of the soil particles are less than 5 micrometers in size, determined in accordance with ASTM D422.
Expansion index greater than 20, determined in accordance with ASTM D4829.
1803.5.4 Ground-water table. A subsurface soil investigation shall be performed to determine whether the existing ground-water table is above or within 5 feet (1524 mm) below the elevation of the lowest floor level where such floor is located below the finished ground level adjacent to the foundation.
Exception: [OSHPD 1R, 2 & 5] Not permitted by OSHPD. A subsurface soil investigation to determine the location of the ground-water table shall not be required where waterproofing is provided in accordance with Section 1805.
1803.5.5 Deep foundations. Where deep foundations will be used, a geotechnical investigation shall be conducted and shall include all of the following, unless sufficient data on which to base the design and installation is otherwise available:
Recommended deep foundation types and installed capacities.
Recommended center-to-center spacing of deep foundation elements.
Driving criteria.
Installation procedures.
Field inspection and reporting procedures (to include procedures for verification of the installed bearing capacity where required).
Load test requirements.
Suitability of deep foundation materials for the intended environment.
Designation of bearing stratum or strata.
Reductions for group action, where necessary.
1803.5.6 Rock strata. Where subsurface explorations at the project site indicate variations in the structure of rock on which foundations are to be constructed, a sufficient number of borings shall be drilled to sufficient depths to assess the competency of the rock and its load-bearing capacity.
1803.5.7 Excavation near foundations. Where excavation will reduce support from any foundation, a registered design professional shall prepare an assessment of the structure as determined from examination of the structure, available design documents, available subsurface data, and, if necessary, excavation of test pits. The registered design professional shall determine the requirements for support and protection of any existing foundation and prepare site-specific plans, details and sequence of work for submission. Such support shall be provided by underpinning, bracing, excavation retention systems, or by other means acceptable to the building official.
SOILS AND FOUNDATIONS
1803.5.8 Compacted fill material. Where shallow foundations will bear on compacted fill material more than 12 inches (305 mm) in depth, a geotechnical investigation shall be conducted and shall include all of the following:
Specifications for the preparation of the site prior to placement of compacted fill material.
Specifications for material to be used as compacted fill.
Test methods to be used to determine the maximum dry density and optimum moisture content of the material to be used as compacted fill.
Maximum allowable thickness of each lift of compacted fill material.
Field test method for determining the in-place dry density of the compacted fill.
Minimum acceptable in-place dry density expressed as a percentage of the maximum dry density determined in accordance with Item 3.
Number and frequency of field tests required to determine compliance with Item 6.
1803.5.9 Controlled low-strength material (CLSM). Where shallow foundations will bear on controlled lowstrength material (CLSM), a geotechnical investigation shall be conducted and shall include all of the following:
Specifications for the preparation of the site prior to placement of the CLSM.
Specifications for the CLSM.
Laboratory or field test method(s) to be used to determine the compressive strength or bearing capacity of the CLSM.
Test methods for determining the acceptance of the CLSM in the field.
Number and frequency of field tests required to determine compliance with Item 4.
1803.5.10 Alternate setback and clearance. Where setbacks or clearances other than those required in Section 1808.7 are desired, the building official shall be permitted to require a geotechnical investigation by a registered design professional to demonstrate that the intent of Section 1808.7 would be satisfied. Such an investigation shall include consideration of material, height of slope, slope gradient, load intensity and erosion characteristics of slope material.
other than those required in Section 1808.7 are desired, the building official shall be permitted to require a geotechnical investigation by a registered design professional to demonstrate that the intent of Section 1808.7 would be satisfied. Such an investigation shall include consideration of material, height of slope, slope gradient, load intensity and erosion characteristics of slope material.
1803.5.11 Seismic Design Categories C through F. For structures assigned to Seismic Design Category C, D, E or F, a geotechnical investigation shall be conducted, and shall include an evaluation of all of the following potential geologic and seismic hazards:
Slope instability.
Liquefaction.
Total and differential settlement.
Surface displacement due to faulting or seismically induced lateral spreading or lateral flow.
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
SOILS AND FOUNDATIONS
1803.5.12 Seismic Design Categories D through F. For structures assigned to Seismic Design Category D, E or F, the geotechnical investigation required by Section 1803.5.11 shall include all of the following as applicable:
The determination of dynamic seismic lateral earth pressures on foundation walls and retaining walls supporting more than 6 feet (1.83 m) of backfill height due to design earthquake ground motions.
The potential for liquefaction and soil strength loss evaluated for site peak ground acceleration, earthquake magnitude and source characteristics consistent with the maximum considered earthquake ground motions. Peak ground acceleration shall be determined based on one of the following:
2.1. A site-specific study in accordance with Chapter 21 of ASCE 7.
2.2. In accordance with Section 11.8.3 of ASCE 7.
- An assessment of potential consequences of liquefaction and soil strength loss including, but not limited to, the following:
3.1. Estimation of total and differential settlement.
3.2. Lateral soil movement.
3.3. Lateral soil loads on foundations.
3.4. Reduction in foundation soil-bearing capacity and lateral soil reaction.
3.5. Soil downdrag and reduction in axial and lateral soil reaction for pile foundations.
3.6. Increases in soil lateral pressures on retaining walls.
3.7. Flotation of buried structures.
- Discussion of mitigation measures such as, but not limited to, the following:
4.1. Selection of appropriate foundation type and depths.
4.2. Selection of appropriate structural systems to accommodate anticipated displacements and forces.
4.3. Ground stabilization.
4.4. Any combination of these measures and how they shall be considered in the design of the structure.
1803.6 Reporting.¶
Where geotechnical investigations are required, a written report of the investigations shall be submitted to the building official by the permit applicant at the time of permit application. This geotechnical report shall include, but need not be limited to, the following information:
A plot showing the location of the soil investigations.
A complete record of the soil boring and penetration test logs and soil samples.
A record of the soil profile.
Elevation of the water table, if encountered.
Recommendations for foundation type and design criteria, including but not limited to: bearing capacity of natural or compacted soil; provisions to mitigate the effects of expansive soils; mitigation of the effects of liquefaction, differential settlement and varying soil strength; and the effects of adjacent loads.
Expected total and differential settlement.
Deep foundation information in accordance with Section 1803.5.5.
Special design and construction provisions for foundations of structures founded on expansive soils, as necessary.
Compacted fill material properties and testing in accordance with Section 1803.5.8.
Controlled low-strength material properties and testing in accordance with Section 1803.5.9.
11. [OSHPD 1R, 2 & 5] The report shall consider the effects of seismic hazard in accordance with Section 1803.7.
1803.7 Geohazard reports. [OSHPD 1R, 2 & 5]¶
Geohazard reports shall be required for all proposed construction.
Exceptions:
1. Reports are not required for one-story, wood-frame and light-steel-frame buildings of Type V skilled nursing or intermediate care facilities construction and 4,000 square feet (371 m 2 ) or less in floor area, not located within Earthquake Fault Zones or Seis- mic Hazard Zones as shown in the most recently published maps from the California Geological Sur- vey (CGS); nonstructural, associated structural or voluntary structural alterations and incidental structural additions or alterations, and structural repairs for other than earthquake damage.
2. A previous report for a specific site may be resub- mitted, provided that a reevaluation is made and the report is found to be currently appropriate.
The purpose of the geohazard report shall be to identify geologic and seismic conditions that may require project mitigations. The reports shall contain data which provide an assessment of the nature of the site and potential for earthquake damage based on appropriate investigations of the regional and site geology, project foundation condi- tions and the potential seismic shaking at the site. The report shall be prepared by a California-certified engi- neering geologist in consultation with a California-regis- tered geotechnical engineer.
The preparation of the geohazard report shall consider the most recent CGS Note 48; Checklist for the Review of Engineering Geology and Seismology Reports for Califor- nia Public School, Hospitals and Essential Services Build- ings. In addition, the most recent version of CGS Special Publication 42, Fault Rupture Hazard Zones in Califor- nia, shall be considered for project sites proposed within an Alquist-Priolo Earthquake Fault Zone. The most recent version of CGS Special Publication 117, Guidelines for Evaluating and Mitigating Seismic Hazards in California,
18-6 2022 CALIFORNIA BUILDING CODE
Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.
shall be considered for project sites proposed within a Seismic Hazard Zone. All conclusions shall be fully sup- ported by satisfactory data and analysis.
In addition to requirements in Sections 1803.5.11 and 1803.5.12, the report shall include, but shall not be limited to, the following:
1. Site geology.
2. Evaluation of the known active and potentially active faults, both regional and local. 3. Ground-motion parameters, as required by Section 1613 and ASCE 7.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Building Code (Title 24, Part 2)
- Chapter 2 — DEFINITIONS AND ABBREVIATIONS
- Appendix G — FLOOD-RESISTANT
- Appendix L — EARTHQUAKE RECORDING
- Appendix M — TSUNAMI-GENERATED
- Appendix N — REPLICABLE
- Appendix O — PERFORMANCE-BASED
- Chapter 1 — SCOPE AND ADMINISTRATION
- Chapter 3 — OCCUPANCY CLASSIFICATION AND USE
- Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON OCCUPANCY A…
- Chapter 5 — GENERAL BUILDING HEIGHTS AND AREAS
- Chapter 6 — TYPES OF CONSTRUCTION
- Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
- Chapter 7A — MATERIALS AND CONSTRUCTION
- Chapter 8 — INTERIOR FINISHES
- Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
- Chapter 10 — MEANS OF EGRESS
- Chapter 11A — HOUSING ACCESSIBILITY
- Chapter 11B — ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMM…
- Chapter 12 — INTERIOR ENVIRONMENT
- Chapter 14 — EXTERIOR WALLS
- Chapter 15 — ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
- Chapter 16 — STRUCTURAL DESIGN
- Chapter 16A — STRUCTURAL DESIGN
- Chapter 17 — SPECIAL INSPECTIONS AND TESTS
▸Chapter 18 — SOILS AND FOUNDATIONS
Overview- Section 1801
- Section 1802
- Section 1803
- Section 1804
- Section 1805
- Section 1806
- Section 1807
- Section 1808
- Section 1809
- Section 1810
- Section 1811
- Section 1812
- Section 1813
- Section 1801A
- Section 1802A
- Section 1803A
- Section 1804A
- Section 1805A
- Section 1806A
- Section 1807A
- Section 1808A
- Section 1809A
- Section 1810A
- Section 1811A
- Section 1812A
- Section 1813A
- Chapter 19 — CONCRETE
- Chapter 20 — ALUMINUM
- Chapter 21 — MASONRY
- Chapter 22 — STEEL
- Chapter 23 — WOOD
- Chapter 24 — GLASS AND GLAZING
- Chapter 25 — GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER
- Chapter 26 — PLASTIC
- Chapter 27 — ELECTRICAL
- Chapter 28 — MECHANICAL SYSTEMS
- Chapter 30 — ELEVATORS AND CONVEYING SYSTEMS
- Chapter 31 — SPECIAL CONSTRUCTION
- Chapter 31B — PUBLIC POOLS
- Chapter 31C — RADIATION
- Chapter 31D — FOOD ESTABLISHMENTS
- Chapter 31F — MARINE OIL TERMINALS
- Chapter 32 — ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
- Chapter 33 — SAFEGUARDS DURING CONSTRUCTION
- Chapter 35 — REFERENCED STANDARDS
- Appendix A — EMPLOYEE QUALIFICATIONS
- Appendix B — BOARD OF APPEALS
- Appendix C — GROUP U – AGRICULTURAL BUILDINGS
- Appendix D — FIRE DISTRICTS
- Appendix F — RODENTPROOFING
- Appendix H — SIGNS
- Appendix I — PATIO COVERS
- Appendix J — GRADING
- Appendix K — GROUP R-3 AND GROUP R-3.1 OCCUPANCIES
- Appendix P — EMERGENCY HOUSING