Division 5 — Commercial Base Zones
§131.0543 Setback Requirements for Commercial Zones
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
Setback requirements are specified in Tables 131-05C, 131-05D, and 131-05E and are subject to the following exceptions and additional regulations:
(a) Front and Street Side Setback Requirements
(1) Off-street parking in all commercial zones, with the exception of CC-3-10, and CC-3-11, may be located within the required front yard and required street side yard adjoining the required landscaped strip abutting public rights-of-way .
(2) In the CN, CO, CV, and CC zones with a maximum front or street side setback as shown in Tables 131-05C, 131-05D, and 131-05E, the maximum setback shall apply to only 70 percent of the street frontage . The remaining 30 percent is not required to observe the maximum setback and may be located farther from the property line . See Diagram 131-05B.
Ch. Art. Div. 13 1 5 42
San Diego Municipal Code
Chapter 13: Zones
(3-2026)
==> picture [440 x 486] intentionally omitted <==
Ch. Art. Div. 13 1 5 43
San Diego Municipal Code
Chapter 13: Zones
(3-2026)
- (3) In the CC-1-1, CC-1-2, CC-2-1, CC-2-2, CC-4-1, CC-4-2, CC-5-1, and CC-5-2 zones, the 100-foot maximum front setback does not apply to lots with more than 75 feet of street frontage if the proposed development is within 10 feet of the front or street side property line for at least 30 percent of the street frontage . See Diagram 131-05C.
Diagram 131-05C
Exception to Maximum Setback
==> picture [245 x 167] intentionally omitted <==
----- Start of picture text -----
Building 60'
Exempt from 200'
100' max setback
100'
48' min
(48' + 60' = 30% of 360')
160' STREE T
----- End of picture text -----
NOTE: Example of exemption from 100' m ax setback
The lot has more than 75' of lineal street frontage
Buildings are located within 0' -5' of the f ront and street side property line for 30% of the total linear street f rontage
(b) Minimum Side and Rear Setback
(1) In zones that require a 10-foot minimum side or rear setback and provide the option for a zero-foot side or rear setback as shown in Tables 131-05C, 131-05D, and 131-05E, the structure shall be placed anywhere in between the property line and the minimum 10-foot setback.
(2) The optional side or rear setback is not applicable to commercial development abutting residentially zoned properties with a permitted density of less than 15 dwelling units per acre as further described in Section 131.0543(c).
Ch. Art. Div. 13 1 5 44
San Diego Municipal Code
Chapter 13: Zones
(3-2026)
(c) Commercial Development Abutting Residentially Zoned Properties
- (1) Commercial development abutting residentially zoned properties with a permitted density of less than 15 dwelling units per acre shall provide a 10-foot minimum setback for any side or rear yard that abuts low density residential zoned property. The structure shall comply with additional step back requirements in accordance with Section 131.0543(c)(3).
(2) Commercial development abutting residentially zoned properties with a permitted density of 15 dwelling units or more per acre that provide no side or rear setback and locate the structure at the property line as provided for by Section 131.0543(b) shall comply with the following:
- (A) Minimum step back for _structures_ placed at the side _property line_ . - (i) Any portion of the _structure_ exceeding 15 feet in height shall be stepped back from the side _property line_ 10 feet, or 10 percent of the _lot_ width but not less than 5 feet, whichever is less. - (ii) Each 15 feet in height above 30 feet shall be stepped back at least 3 feet from the minimum _setback_ of that portion of the _structure_ immediately below. - (B) Minimum step back for _structures_ placed at the rear _property line_ . - (i) Any portion of the _structure_ exceeding 15 feet in height shall be stepped back from the rear _property line_ 10 feet, or 10 percent of the _lot_ depth but not less than 5 feet, whichever is less. - (ii) Each 15 feet in height above 30 feet shall be stepped back at least 3 feet from the minimum _setback_ of that portion of the _structure_ immediately below.
Ch. Art. Div. 13 1 5 45
San Diego Municipal Code
Chapter 13: Zones
(3-2026)
- (3) For side and rear yards , if the structure is set back 10 feet or more from the property line , each 15 feet in height above 30 feet shall be stepped back at least 3 feet from the minimum setback of that portion of the structure immediately below.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 8-4-2011 by O-20081 N.S.; effective 10-6-2011.) (Amended 6-18-2013 by O-20261 N.S.; effective 7-19-2013.) (Amended 2-1-2021 by O-21288 N.S.; effective 3-3-2021.) (Amended 7-22-2024 by O-21836 N.S.; effective 10-5-2024.)
[Editors Note: Amendments as adopted by O-21836 N.S. will not apply within the Coastal Overlay Zone until the California Coastal Commission certifies it as a Local Coastal Program Amendment.
Click the link to view the Strikeout Ordinance highlighting changes to prior language http://docs.sandiego.gov/municode_strikeout_ord/O-21836-SO.pdf ]
(Amended 9-17-2024 by O-21866 N.S.; effective 12-1-2024.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
- Division 2 — Rules for Calculation and Measurement
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
-
▸ Division 5 — Commercial Base Zones
Overview- §131.0501 Purpose of Commercial Zones
- §131.0502 Purpose of the CN (Commercial--Neighborhood) Zones
- §131.0503 Purpose of the CR (Commercial--Regional) Zones
- §131.0504 Purpose of the CO (Commercial--Office) Zones
- §131.0505 Purpose of the CV (Commercial--Visitor) Zones
- §131.0506 Purpose of the CP (Commercial--Parking) Zone
- §131.0507 Purpose of the CC (Commercial--Community) Zones
- §131.0515 Where Commercial Zones Apply
- §131.0520 Use Regulations of Commercial Zones
- §131.0522 Use Regulations Table for Commercial Zones
- §131.0530 Development Regulations of Commercial Zones
- §131.0531 Development Regulations Tables for Commercial Zones
- §131.0540 Maximum Permitted Residential Density and Other Resi…
- §131.0541 Supplemental Commercial Regulations for CO Zones
- §131.0543 Setback Requirements for Commercial Zones
- §131.0546 Maximum Floor Area Ratio
- §131.0548 Ground-floor Height
- §131.0550 Pedestrian Paths
- §131.0552 Transparency
- §131.0554 Building Articulation
- §131.0555 Parking Restriction
- §131.0556 Parking Lot Orientation
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone