§ 18.74 PURPOSE.¶
The enforcement response plan establishes a framework for managing an enforcement protocol to achieve and maintain industrial user compliance for wastewater pretreatment violations.
(Ord. 920, passed 11-7-2000)
§ 18.75 INDUSTRIAL USER INVENTORY.¶
A compliance tracking and enforcement system requires a complete and accurate compilation of pertinent data on all IUs discharging to the city’s sewage system. An IU database is maintained and regularly updated by staff. The city procedures include review and approval of all proposed industrial/commercial construction and tenant improvement projects.
(Ord. 920, passed 11-7-2000)
§ 18.76 NONCOMPLIANCE ISSUES.¶
(A) Industrial users identified as meeting the definition of an SIU are sent an application for issuance of an industrial wastewater discharge permit. Upon completion of the permitting process, specific inspection, sampling, monitoring and enforcement requirements are assessed and assigned to the SIU. Collecting and distributing specific information on an industry is performed by city staff.
(B) After reviewing and entering the compliance data into the IU database, noncompliance issues are identified for appropriate enforcement action.
(C) File information is maintained for each permitted and non-permitted IU. These files generally include IU facility description, baseline monitoring reports, monitoring data, inspection reports, summary of violations, enforcement actions, phone log and other relevant information.
(Ord. 920, passed 11-7-2000)