R806.1 Ventilation required.¶
Enclosed attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain or snow. Ventilation openings shall have a least dimension of 1 /16 inch (1.6 mm) minimum and 1 /4 inch (6.4 mm) maximum. Ventilation openings having a least dimension larger than 1 /4 inch (6.4 mm) shall be provided with corrosion-resistant wire cloth screening, hardware cloth, perforated vinyl or similar material with openings having a least dimension of 1 /16 inch (1.6 mm) minimum and 1 /4 inch (6.4 mm) maximum. Openings in roof framing members shall conform to the requirements of Section R802.7. Required ventilation openings shall open directly to the outside air and shall be protected to prevent the entry of birds, rodents, snakes and other similar creatures.
Copyright © 2019 ICC. ALL RIGHTS RESERVED. Accessed by Kevin Day (kevin.day@dgs.ca.gov), (California Building Standards Commission) Order Number #100735044 on Jul 24, 2019 03:54 PM (PDT) pursuant to License Agreement with ICC. No further reproduction or distribution authorized. Single user only, copying and networking prohibited. ANY UNAUTHORIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT, AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
100735044
ROOF-CEILING CONSTRUCTION
R806.2 Minimum vent area.¶
The minimum net free ventilating area shall be 1 /150 of the area of the vented space.
Exception: The minimum net free ventilation area shall be 1/300 of the vented space provided both of the following conditions are met:
In Climate Zones 14 and 16, a Class I or II vapor retarder is installed on the warm-in-winter side of the ceiling.
Not less than 40 percent and not more than 50 percent of the required ventilating area is provided by ventilators located in the upper portion of the attic or rafter space. Upper ventilators shall be located not more than 3 feet (914 mm) below the ridge or highest point of the space, measured vertically. The balance of the required ventilation provided shall be located in the bottom one-third of the attic space. Where the location of wall or roof framing members conflicts with the installation of upper ventilators, installation more than 3 feet (914 mm) below the ridge or highest point of the space shall be permitted.
R806.3 Vent and insulation clearance.¶
Where eave or cornice vents are installed, blocking, bridging and insulation shall not block the free flow of air. Not less than a 1-inch (25 mm) space shall be provided between the insulation and the roof sheathing and at the location of the vent.
R806.4 Installation and weather protection.¶
Ventilators shall be installed in accordance with manufacturer’s instructions. Installation of ventilators in roof systems shall be in accordance with the requirements of Section R903. Installation of ventilators in wall systems shall be in accordance with the requirements of Section R703.1.
R806.5 Unvented attic and unvented enclosed rafter assemblies.¶
assemblies. Unvented attics and unvented enclosed roof framing assemblies created by ceilings that are applied directly to the underside of the roof framing members and structural roof sheathing applied directly to the top of the roof framing members/rafters, shall be permitted where all the following conditions are met:
The unvented attic space is completely within the building thermal envelope.
Interior Class I vapor retarders are not installed on the ceiling side (attic floor) of the unvented attic assembly or on the ceiling side of the unvented enclosed roof framing assembly.
Where wood shingles or shakes are used, a minimum 1 /4inch (6.4 mm) vented airspace separates the shingles or shakes and the roofing underlayment above the structural sheathing.
In California Climate Zones 14 and 16, any air-impermeable insulation shall be a Class II vapor retarder, or shall have a Class II vapor retarder coating or covering in direct contact with the underside of the insulation.
4.1. A Class I or Class II vapor retarder shall be installed on the indirectly conditioned space side of all insulation in an unvented attic with
air-permeable insulation, for condensation con- trol.
See the California Energy Code, Figure 100.1- A —California Climate Zones.
- Insulation shall comply with Item 5.3 and either Item 5.1 or 5.2:
5.1. Item 5.1.1, 5.1.2, 5.1.3 or 5.1.4 shall be met, depending on the air permeability of the insulation directly under the structural roof sheathing. No insulation shall be required when roof tiles, wood shingles or wood shakes, or any other roofing system using battens and no continuous underlayment is installed. A continuous under- layment shall be considered to exist if sheath- ing, roofing paper or any continuous layer having a perm rate of no more than one perm under the dry cup method is present.
5.1.1. Where only air-impermeable insulation is provided, it shall be applied in direct contact with the underside of the structural roof sheathing.
5.1.2. Where air-permeable insulation is installed directly below the structural sheathing, rigid board or sheet insulation shall be installed directly above the structural roof sheathing in accordance with the R-values in Table R806.5 for condensation control.
5.1.3. Where both air-impermeable and airpermeable insulation are provided, the air-impermeable insulation shall be applied in direct contact with the underside of the structural roof sheathing in accordance with Item 5.1.1 and shall be in accordance with the R-values in Table R806.5 for condensation control. The air-permeable insulation shall be installed directly under the air-impermeable insulation.
. Where both air-impermeable and airpermeable insulation are provided, the air-impermeable insulation shall be applied in direct contact with the underside of the structural roof sheathing in accordance with Item 5.1.1 and shall be in accordance with the R-values in Table R806.5 for condensation control. The air-permeable insulation shall be installed directly under the air-impermeable insulation.
5.1.4. Alternatively, sufficient rigid board or sheet insulation shall be installed directly above the structural roof sheathing to maintain the monthly average temperature of the underside of the structural roof sheathing above 45°F (7°C). For calculation purposes, an interior air temperature of 68°F (20°C) is assumed and the exterior air temperature is assumed to be the monthly average outside air temperature of the three coldest months.
5.2. In Climate Zones 3-15, air-permeable insulation installed in unvented attics shall meet the following requirements:
5.2.1. An approved vapor diffusion port shall be installed not more than 12 inches (305 mm) from the highest point of the
488 2019 CALIFORNIA RESIDENTIAL CODE
Copyright © 2019 ICC. ALL RIGHTS RESERVED. Accessed by Kevin Day (kevin.day@dgs.ca.gov), (California Building Standards Commission) Order Number #100735044 on Jul 24, 2019 03:54 PM (PDT) pursuant to License Agreement with ICC. No further reproduction or distribution authorized. Single user only, copying and networking prohibited. ANY UNAUTHORIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT, AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
100735044
roof, measured vertically from the highest point of the roof to the lower edge of the port.
5.2.2. The port area shall be greater than or equal to 1:600 of the ceiling area. Where there are multiple ports in the attic, the sum of the port areas shall be greater than or equal to the area requirement.
5.2.3. The vapor-permeable membrane in the vapor diffusion port shall have a vapor permeance rating of greater than or equal to 20 perms when tested in accordance with Procedure A of ASTM E96.
5.2.4. The vapor diffusion port shall serve as an air barrier between the attic and the exterior of the building.
5.2.5. The vapor diffusion port shall protect the attic against the entrance of rain and snow.
5.2.6. Framing members and blocking shall not block the free flow of water vapor to the port. Not less than a 2-inch (51 mm) space shall be provided between any blocking and the roof sheathing. Air-permeable insulation shall be permitted within that space.
5.2.7. The roof slope shall be greater than or equal to 3:12 (vertical/horizontal).
5.2.8. Where only air-permeable insulation is used, it shall be installed directly below the structural roof sheathing.
5.2.9. Air-impermeable insulation, if any, shall be directly above or below the structural roof sheathing and is not required to meet the R-value in Table 806.5. Where directly below the structural roof sheathing, there shall be no space between the air-impermeable insulation and air-permeable insulation.
5.2.10. The air shall be supplied at a flow rate greater than or equal to 50 CFM (23.6 L/s) per 1,000 square feet (93 m 2 ) of ceiling. The air shall be supplied from ductwork providing supply air to the occupiable space when the conditioning system is operating. Alternatively, the air shall be supplied by a supply
ROOF-CEILING CONSTRUCTION
fan when the conditioning system is operating.
5.3. Where preformed insulation board is used as the air-impermeable insulation layer, it shall be sealed at the perimeter of each individual sheet interior surface to form a continuous layer.
TABLE R806.5
| INSULATION FOR | CONDENSATION CONTROL |
|---|---|
| CLIMATE ZONE | MINIMUM RIGID BOARD OR AIR-IMPERMEABLE INSULATIONR-VALUE |
| 6-15 tile roof only | 0 (none required) |
| 3-15 | R-5 |
| 1 & 2 | R-10 |
| 16 | R-15 |
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Residential Code (Title 24, Part 2.5)
- Chapter 2 — DEFINITIONS AND ABBREVIATIONS
- Chapter 1 — SCOPE AND APPLICATION
- Chapter 3 — BUILDING PLANNING
- Chapter 4 — FOUNDATIONS
- Chapter 5 — FLOORS
- Chapter 6 — WALL CONSTRUCTION
- Chapter 7 — WALL COVERING
▸Chapter 8 — ROOF-CEILING CONSTRUCTION
- Chapter 9 — ROOF ASSEMBLIES
- Chapter 10 — CHIMNEYS AND FIREPLACES
- Chapter 44 — REFERENCED STANDARDS
- Appendix F — RADON CONTROL METHODS
- Appendix H — PATIO COVERS
- Appendix I — PRIVATE SEWAGE DISPOSAL
- Appendix J — EXISTING BUILDINGS AND STRUCTURES
- Appendix K — SOUND TRANSMISSION
- Appendix L — PERMIT FEES
- Appendix O — AUTOMATIC VEHICULAR GATES
- Appendix Q — TINY HOUSES
- Appendix R — LIGHT STRAW-CLAY CONSTRUCTION
- Appendix S — STRAWBALE CONSTRUCTION
- Appendix T — SOLAR-READY PROVISIONS—DETACHED ONE- AND
- Appendix V — SWIMMING POOL SAFETY ACT
- Appendix W — AREAS PROTECTED BY THE FACILITIES
- Appendix X — EMERGENCY HOUSING