705.3 Copper or Copper Alloy Pipe (DWV) and
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Joints. Joining methods for copper or copper alloy pipe and fittings shall be installed in accordance with the manufacturer’s installation instructions and shall comply with Section 705.3.1 through Section 705.3.4. 705.3.1 Brazed Joints. Brazed joints between copper or copper alloy pipe and fittings shall be made with brazing alloys having a liquid temperature above 1000°F (538°C). The joint surfaces to be brazed shall be cleaned bright by either manual or mechanical means. Piping shall be cut square and reamed to full inside diameter. Brazing flux shall be applied to the joint surfaces where required by manufacturer’s recommendation. Brazing filler metal shall conform to AWS A5.8 and shall be applied at the point where the pipe or tubing enters the socket of the fitting. 705.3.2 Mechanical Joints. Mechanical joints in copper or copper alloy piping shall be made with a mechanical coupling with grooved end piping or approved joint designed for the specific application. 705.3.3 Soldered Joints. Soldered joints between copper or copper alloy pipe and fittings shall be made in accordance with ASTM B828 with the following sequence of joint preparation and operation as follows: measuring and cutting, reaming, cleaning, fluxing, assembly and support, heating, applying the solder, cooling, and cleaning. Pipe shall be cut square and reamed to the full inside diameter including the removal of burrs on the outside of the pipe. Surfaces to be joined shall be
cleaned bright by manual or mechanical means. Flux shall be applied to pipe and fittings and shall conform to ASTM B813, and shall become noncorrosive and nontoxic after soldering. Insert pipe into the base of the fitting and remove excess flux. Pipe and fitting shall be supported to ensure a uniform capillary space around the joint. Heat shall be applied using air or fuel torch with the flame perpendicular to the pipe using acetylene or an LP gas. Preheating shall depend on the size of the joint. The flame shall be moved to the fitting cup and alternate between the pipe and fitting. Solder conforming to ASTM B32 shall be applied to the joint surfaces until capillary action draws the molten solder into the cup. Joint surfaces shall not be disturbed until cool, and any remaining flux residue shall be cleaned. 705.3.4 Threaded Joints. Threaded joints for copper or copper alloy pipe shall be made with pipe threads that comply with ASME B1.20.1. Thread sealant tape or compound shall be applied only to male threads, and such material shall be approved types, insoluble in water, and nontoxic.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
▸Chapter 7 — SANITARY DRAINAGE
Overview- 701.1 Applicability. This chapter shall govern the materials,
- 701.2 Drainage Piping. Materials for drainage piping shall
- 701.3 Drainage Fittings. Materials for drainage fittings
- 701.4 Continuous Wastes. Continuous wastes and fixture
- 701.5 Lead. (See Chapter 17) Sheet lead shall comply with
- 701.6 Caulking Ferrules. Caulking ferrules shall be manufactur…
- 701.7 Soldering Bushings. Soldering bushings shall be
- 702.1 Trap Size. The unit equivalent of plumbing fixtures
- 702.2 Intermittent Flow. Drainage fixture units for intermitte…
- 702.3 Continuous Flow. For a continuous flow into a
- 703.1 Minimum Size. The minimum sizes of vertical, horizontal,…
- 703.2 Maximum Number of Fixture Units. Table 703.2
- 703.3 Sizing per Appendix C. For alternate method of
- 704.1 Inlet Fittings. Drainage piping shall be provided with
- 704.2 Single Vertical Drainage Pipe. Two fixtures set
- 704.3 Commercial Sinks. Pot sinks, scullery sinks, dishwashing…
- 705.1 ABS and ABS Co-Extruded Plastic Pipe and
- 705.2 Cast-Iron Pipe and Joints. Joining methods for
- 705.3 Copper or Copper Alloy Pipe (DWV) and
- 705.4 Galvanized Steel Pipe and Joints. Joining methods for ga…
- 705.5 Polyethylene (PE) Sewer Pipe. Polyethylene (PE)
- 705.6 PVC and PVC Co-Extruded Plastic Pipe and
- 705.7 Stainless Steel Pipe and Joints. Joining methods for sta…
- 705.8 Vitrified Clay Pipe and Joints. Joining methods
- 705.9 Special Joints. Special joints shall comply with Section…
- 705.10 Joints Between Various Materials. Joints
- 706.1 Approved Fittings. Changes in the direction of
- 706.2 Horizontal to Vertical. Horizontal drainage lines,
- 706.3 Horizontal to Horizontal. Horizontal drainage lines
- 706.4 Vertical to Horizontal. Vertical drainage lines connecti…
- 707.1 Plug. Each cleanout fitting for cast-iron pipe shall con…
- 707.2 Approved. Each cleanout fitting and each cleanout
- 707.3 Watertight and Gastight. Cleanouts shall be
- 707.4 Location. Each horizontal drainage pipe shall be provide…
- 707.5 Cleaning. Each cleanout shall be installed so that it
- 707.6 Extension. Each cleanout extension shall be considered a…
- 707.7 Interceptor. Each cleanout for an interceptor shall be
- 707.8 Access. Each cleanout, unless installed under an
- 707.9 Clearance. Each cleanout in piping 2 inches (50 mm)
- 707.10 Fittings. Cleanout fittings shall be not less in size
- 707.11 Pressure Drainage Systems. Cleanouts shall be
- 707.12 Countersunk Cleanout Plugs. Countersunk
- 707.13 Hubless Blind Plugs. Where a hubless blind plug
- 707.14 Trap Arms. Cleanouts for trap arms shall be installed
- 708.1 General. Horizontal drainage piping shall be run in
- 709.1 General. Where practicable, plumbing fixtures shall
- 710.1 Backflow Protection. Fixtures installed on a floor
- 710.2 Sewage Discharge. Drainage piping serving fixtures that …
- 710.3 Sewage Ejector and Pumps. A sewage ejector or
- 710.4 Discharge Line. The discharge line from such ejector, pu…
- 710.5 Size of Building Drains and Sewers. Building
- 710.6 Backwater Valves. Backwater valves, gate valves,
- 710.7 Drainage and Venting Systems. The drainage and
- 710.8 Sump and Receiving Tank Construction. Sumps
- 710.9 Alarm. Such sumps and receiving tanks shall be automatic…
- 710.10 Sump and Receiving Tank Covers and Vents.
- 710.11 Air Tanks. Air tanks shall be so proportioned as to be
- 710.12 Grinder Pump Ejector. Grinder pumps shall be
- 710.13 Macerating Toilet Systems and Pumped
- 711.1 General. Drainage connections shall not be made into
- 712.1 Media. The piping of the plumbing, drainage, and
- 712.2 Water Test. The water test shall be applied to the
- 712.3 Air Test. The air test shall be made by attaching an
- 713.1 Where Required. A building in which plumbing fixtures ar…
- 713.2 Private Sewage Disposal System. Where no public sewer in…
- 713.3 Public Sewer. Within the limits prescribed by Section 71…
- 713.4 Public Sewer Availability. The public sewer shall
- 713.5 Permit. No permit shall be issued for the installation,
- 713.6 Lot. On every lot or premises hereafter connected to
- 713.7 Installation. In cities, counties, or both where the
- 714.1 Unlawful Practices. It shall be unlawful for a person to…
- 714.2 Prohibited Water Discharge. No rain, surface, or
- 714.3 Prohibited Sewer Connection. No cesspool, septic tank, s…
- 714.4 Commercial Food Waste Disposer. The Authority Having Jur…
- 714.5 Tanks. An approved type, watertight sewage or wastewater…
- 715.1 Materials. The building sewer, beginning 2 feet (610
- 715.2 Joining Methods and Materials. Joining methods
- 715.3 Existing Sewers. Replacement of existing building
- 716.1 General. Pipe, brick, block, prefabricated septic tanks,
- 717.1 General. The minimum size of a building sewer shall
- 717.2 [AGR] Meat and Poultry Processing Plants. The
- 718.1 Slope. Building sewers shall be run in practical alignme…
- 718.2 Support. Building sewer piping shall be laid on a firm
- 718.3 Protection from Damage. No building sewer or
- 719.1 Locations. Cleanouts shall be placed inside the building…
- 719.2 No Additional Cleanouts. Where a building sewer
- 719.3 Building Sewer Cleanouts. Required building
- 719.4 Cleaning. Each cleanout shall be installed so that it
- 719.5 Access. Cleanouts installed under concrete or asphalt
- 719.6 Manholes. Approved manholes shall be permitted to
- 720.1 General. Building sewers or drainage piping of clay
- 721.1 Building Sewer. Except as provided in Section 721.2,
- 721.2 Abutting Lot. Nothing contained in this code shall be
- 722.1 Building (House) Sewer. An abandoned building
- 722.2 Cesspools, Septic Tanks, and Seepage Pits. A
- 722.3 Filling. The top cover or arch over the cesspool, septic…
- 722.4 Ownership. No person owning or controlling a
- 722.5 Disposal Facilities. Where disposal facilities are
- 723.1 General. Building sewers shall be tested by plugging
- 724.1 The drainage and plumbing systems must permit the
- 724.2 Toilet soil lines shall be separated from house drainage
- 726.1 The outer premises of every official establishment,
- 726.2 Toilet soil lines shall be separated from house drainage
- 727.1 For new acute care hospital buildings submitted after
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARDS
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR
- Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …