105.0 Inspections and Testing.105.1 General. Plumbing systems for which a permit is
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
required by this code shall be inspected by the Authority Having Jurisdiction.
24 2019 CALIFORNIA PLUMBING CODE
DIVISION II ADMINISTRATION
105.2.3 Inspection Requests. It shall be the duty of the person doing the work authorized by a permit to notify the Authority Having Jurisdiction that such work is ready for inspection. The Authority Having Jurisdiction shall be permitted to require that a request for inspection be filed not less than 1 working day before such inspection is desired. Such request shall be permitted to be made in writing or by telephone, at the option of the Authority Having Jurisdiction.
It shall be the duty of the person requesting inspections in accordance with this code to provide access to and means for inspection of such work. 105.2.4 Advance Notice. It shall be the duty of the person doing the work authorized by the permit to notify the Authority Having Jurisdiction, orally or in writing that said work is ready for inspection. Such notification shall be given not less than 24 hours before the work is to be inspected. 105.2.5 Responsibility. It shall be the duty of the holder of a permit to make sure that the work will stand the test prescribed before giving the notification.
The equipment, material, and labor necessary for inspection or tests shall be furnished by the person to whom the permit is issued or by whom inspection is requested. 105.2.6 Reinspections. A reinspection fee shall be permitted to be assessed for each inspection or reinspection where such portion of work for which inspection is called is not complete or where required corrections have not been made.
This provision shall not be interpreted as requiring reinspection fees the first time a job is rejected for failure to be in accordance with the requirements of this code, but as controlling the practice of calling for inspections before the job is ready for inspection or reinspection.
Reinspection fees shall be permitted to be assessed where the approved plans are not readily available to the inspector, for failure to provide access on the date for which the inspection is requested, or for deviating from plans requiring the approval of the Authority Having Jurisdiction.
To obtain reinspection, the applicant shall file an application therefore in writing upon a form furnished for that purpose and pay the reinspection fee in accordance with Table 104.5.
cases where it would be impractical to provide the required water or air tests, or for minor installations and repairs, the Authority Having Jurisdiction shall be permitted to make such inspection as deemed advisable in order to be assured that the work has been performed in accordance with the intent of this code. Joints and connections in the plumbing system shall be gastight and watertight for the pressures required by the test.
to provide the required water or air tests, or for minor installations and repairs, the Authority Having Jurisdiction shall be permitted to make such inspection as deemed advisable in order to be assured that the work has been performed in accordance with the intent of this code. Joints and connections in the plumbing system shall be gastight and watertight for the pressures required by the test.
105.3.1 Defective Systems. An air test shall be used in testing the sanitary condition of the drainage or plumbing system of building premises where there is reason to believe that it has become defective. In buildings or premises condemned by the Authority Having Jurisdiction because of an insanitary condition of the plumbing system, or part thereof, the alterations in such system shall be in accordance with the requirements of this code. 105.3.2 Retesting. Where the Authority Having Jurisdiction finds that the work will not pass the test, necessary corrections shall be made, and the work shall be resubmitted for test or inspection. 105.3.3 Approval. Where prescribed tests and inspections indicate that the work is in accordance with this code, a certificate of approval shall be issued by the Authority Having Jurisdiction to the permittee on demand.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
▸Chapter 1 — GENERAL CODE PROVISIONS
Overview- 101.2 Scope. The provisions of this code shall apply to the
- 101.3 Purpose. This code is an ordinance providing minimum req…
- 101.4 Unconstitutional. Where a section, subsection, sentence,…
- 101.5 Validity. Where a provision of this code, or the applica…
- 102.2 Existing Installations. Plumbing systems lawfully
- 102.3 Maintenance. The plumbing and drainage system,
- 102.4 Additions, Alterations, Renovations, or
- 102.5 Health and Safety. Where compliance with the provisions …
- 102.6 Changes in Building Occupancy. Plumbing systems that are…
- 102.7 Moved Structures. Parts of the plumbing system of
- 102.8 Appendices. The provisions in the appendices are
- 103.0 Duties and Powers of the Authority Having
- 103.2 Liability. The Authority Having Jurisdiction charged
- 103.3 Applications and Permits. The Authority Having
- 104.2 Exempt Work. A permit shall not be required for the
- 103.4 Right of Entry. Where it is necessary to make an
- 104.3 Application for Permit. To obtain a permit, the
- 104.4 Permit Issuance. The application, construction documents…
- 105.2 Required Inspections. New plumbing work and
- 104.5 Fees. Fees shall be assessed in accordance with the
- 105.0 Inspections and Testing.105.1 General. Plumbing systems …
- 105.4 Connection to Service Utilities. No person shall
- 106.2 Notices of Correction or Violation. Notices of
- 106.3 Penalties. A person, firm, or corporation violating a
- 105.3 Testing of Systems. Plumbing systems shall be
- 106.4 Stop Orders. Where work is being done contrary to
- 106.5 Authority to Disconnect Utilities in Emergen-
- 106.6 Authority to Condemn. Where the Authority Having Jurisdi…
- 107.0 Board of Appeals.107.1 General. In order to hear and dec…
- 107.2 Limitations of Authority. The Board of Appeals
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR