1405.2 Required Inspections. The Authority Having
California Mechanical Code (Title 24, Part 4) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Jurisdiction shall make the following inspections and shall either approve that portion of the work as completed or shall notify the permit holder wherein the same fails to be in accordance with this code.
1405.2.1 Rough Piping Inspection. This inspection shall be made after process piping authorized by the permit has been installed and before piping has been cov
ered or concealed. This inspection shall include a determination that the piping size, material, and installation are in accordance with the requirements of this code. 1405.2.2 Final Piping Inspection. This inspection shall be made after piping authorized by the permit has been installed and after portions thereof that are to be covered or concealed are so concealed. This inspection shall include a pressure test, at which time the piping shall stand a pressure of not less than one-and-one-half times the maximum designed operating pressure where hydraulic testing is conducted or 110 percent where testing is conducted pneumatically. Test pressures shall be held for a length of time satisfactory to the Authority Having Jurisdiction, but in no case for less than 30 minutes with no perceptible drop in pressure. HPM drain, waste, and vent piping shall be tested in accordance with the plumbing code. Tests shall be made in the presence of the Authority Having Jurisdiction. Necessary apparatus for conducting tests shall be furnished by the permit holder.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Mechanical Code (Title 24, Part 4)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — VENTILATION AIR
- Chapter 5 — EXHAUST SYSTEMS
- Chapter 6 — DUCT SYSTEMS
- Chapter 7 — COMBUSTION AIR
- Chapter 8 — CHIMNEYS AND VENTS
- Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
- Chapter 10 — BOILERS AND PRESSURE VESSELS
- Chapter 11 — REFRIGERATION
- Chapter 12 — HYDRONICS
- Chapter 13 — FUEL GAS PIPING
▸Chapter 14 — PROCESS PIPING
Overview- 1401.1 Applicability. Except as otherwise addressed in this
- 1402.1 General. It shall be unlawful to install, alter, or
- 1403.1 General. Plans, engineering calculations, diagrams,
- 1404.1 General. Process piping shall not be strained or bent,
- 1405.1 General. Upon completion of the installation, alteratio…
- 1405.2 Required Inspections. The Authority Having
- 1405.3 Other Inspections. In addition to the inspections
- 1406.1 General. Process pipe, tubing, and fittings shall
- 1406.2 Hazardous Process Piping (HPP). HPP supply
- 1406.3 Special Requirements for HPP Gases. In addition to othe…
- Chapter 15 — SOLAR ENERGY SYSTEMS
- Chapter 16 — STATIONARY POWER PLANTS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
- Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
- Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
- Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
- Appendix E — SUSTAINABLE PRACTICES
- Appendix F — GEOTHERMAL ENERGY SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
- Appendix H — EXAMPLE CALCULATION OF OUTDOOR AIR RATE