Skip to content

Chapter 27 — SEMICONDUCTOR FABRICATION FACILITIES

Section 2704 — STORAGE

2025 California Fire Code (Title 24, Part 9) · 2025 edition · updated 2026-07-29 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

2704.1 General.

Storage of hazardous materials shall comply with Section 2703 and this section and other applicable provisions of this code.

2704.2 Fabrication areas.

Hazardous materials storage and the maximum quantities of hazardous materials in use and storage allowed in fabrication areas shall be in accordance with Sections 2704.2.1 through 2704.2.2.1.

2704.2.1 Location of HPM storage in fabrication areas. Storage of HPM in fabrication areas shall be within approved or listed storage cabinets, gas cabinets, exhausted enclosures or within a workstation as follows:

  1. Flammable and combustible liquid storage cabinets shall comply with Section 5704.3.2.

  2. Hazardous materials storage cabinets shall comply with Section 5003.8.7.

  3. Gas cabinets shall comply with Section 5003.8.6. Gas cabinets for highly toxic or toxic gases shall also comply with Section 6004.1.2.

  4. Exhausted enclosures shall comply with Section 5003.8.5. Exhausted enclosures for highly toxic or toxic gases shall also comply with Section 6004.1.3.

  5. Workstations shall comply with Section 2705.2.3.

2704.2.2 Maximum aggregate quantities in fabrication areas. The aggregate quantities of hazardous materials stored or used in a single fabrication area shall be limited as specified in this section.

Exception: Fabrication areas containing quantities of hazardous materials not exceeding the maximum allowable quantities per control area established by Sections 5003.1.1, 5704.3.4 and 5704.3.5.

2704.2.2.1 Storage and use in fabrication areas. The maximum quantities of hazardous materials stored or used in a single fabrication area shall not exceed the quantities set forth in Table 2704.2.2.1.

TABLE 2704.2.2.1—QUANTITY LIMITS FOR HAZARDOUS MATERIALS IN A SINGLE FABRICATION AREA IN GROUP H-5a

HAZARD CATEGORY SOLIDS
(pounds per square foot)
LIQUIDS
(gallons per square foot)
GAS
(cubic feet @ NTP per square foot)
Physical-Hazard Materials Physical-Hazard Materials Physical-Hazard Materials Physical-Hazard Materials
Combustible dust Note b Not Applicable Not Applicable
Combustible fiber
Loose
Baled
Note b
Notes b and c
Not Applicable Not Applicable
Combustible liquid
Class II
Class IIIA
Class IIIB
Combination Class I, II and IIIA
Not Applicable 0.02
0.04
Not Limited
0.08
Not Applicable
Cryogenic gas
Flammable
Oxidizing
Not Applicable Not Applicable Note d
2.5
Explosives Note b Note b Note b
Flammable gas
Gaseous
Liquefied
Not Applicable Not Applicable Note d
Note d
Flammable liquid
Class IA
Class IB
Class IC
Combination Class IA, IB and IC
Combination Class I, II and IIIA
Not Applicable 0.005
0.05
0.05
0.05
0.08
Not Applicable
Flammable solid 0.002 Not Applicable Not Applicable
Organic peroxide
Unclassified detonable
Class I
Class II
Class III
Class IV
Class V
Note b
Note b
0.05
0.2
Not Limited
Not Limited
Note b
Note b
0.0025
0.02
Not Limited
Not Limited
Not Applicable

27-8 2025 CALIFORNIA FIRE CODE

on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.

SEMICONDUCTOR FABRICATION FACILITIES

TABLE 2704.2.2.1—QUANTITY LIMITS FOR HAZARDOUS MATERIALS IN A SINGLE FABRICATION AREA IN GROUP H-5a—continued

HAZARD CATEGORY SOLIDS
(pounds per square foot)
LIQUIDS
(gallons per square foot)
GAS
(cubic feet @ NTP per square foot)
Oxidizing gas
Gaseous
Liquefied
Combination of gaseous and
liquefied
Not Applicable Not Applicable 2.5
2.5
2.5
Oxidizer
Class 4
Class 3
Class 2
Class 1
Combination Class 1, 2, 3
Note b
0.006
0.006
0.006
0.006
Note b
0.06
0.06
0.06
0.06
Not Applicable
Pyrophoric materials Note b 0.0025 Notes d and e
Unstable (reactive)
Class 4
Class 3
Class 2
Class 1
Note b
0.05
0.2
Not Limited
Note b
0.005
0.02
Not Limited
Note b
Note b
Note b
Not Limited
Water reactive
Class 3
Class 2
Class 1
0.02f
0.5
Not Limited
0.0025
0.05
Not Limited
Not Applicable
Health-Hazard Materials Health-Hazard Materials Health-Hazard Materials Health-Hazard Materials
Corrosives Not Limited Not Limited Not Limited
Highly toxic Not Limited Not Limited Note d
Toxics Not Limited Not Limited Note d
For SI: 1 pound = 0.454 kg, 1 pound per square foot = 4.882 kg/m2, 1 gallon per square foot = 40.7 L/m2, 1 cubic foot @ NTP/square foot = 0.305 m3 @
NTP/m2, 1 cubic foot = 0.02832 m3.
a. Hazardous materials within piping shall not be included in the calculated quantities.
b. Quantity of hazardous materials in a single fabrication area shall not exceed the maximum allowable quantities per control area in Tables 5003.1.1(1)
and 5003.1.1(2).
c. Densely packed baled cotton that complies with the packing requirements of ISO 8115 shall not be included in this material class.
d. The aggregate quantity of flammable, pyrophoric, toxic and highly toxic gases shall not exceed the greater of 0.2 cubic feet at NTP/square foot or 9,000
cubic feet at NTP.
e. The aggregate quantity of pyrophoric gases in the building shall not exceed the amounts set forth in Table 5003.8.2.
f. Quantity of Class 3 water-reactive solids in a single tool shall not exceed 1 pound.

2704.3 Indoor storage outside of fabrication areas.

The indoor storage of hazardous materials outside of fabrication areas shall be in accordance with Sections 2704.3.1 through 2704.3.3.

2704.3.1 HPM storage. The indoor storage of HPM in quantities greater than those listed in Sections 5003.1.1 and 5704.3.4 shall be in a room complying with the requirements of the California Building Code and this code for a liquid storage room, HPM room or gas room as appropriate for the materials stored.

2704.3.2 Other hazardous materials storage. The indoor storage of other hazardous materials shall comply with Sections 5001, 5003 and 5004 and other applicable provisions of this code.

2704.3.3 Separation of incompatible hazardous materials. Incompatible hazardous materials in storage shall be separated from each other in accordance with Section 5003.9.8.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — 2025 California Fire Code (Title 24, Part 9)
2025 California Fire Code (Title 24, Part 9)
  1. Chapter 1 — ADMINISTRATION
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REQUIREMENTS
  4. Chapter 4 — EMERGENCY PLANNING AND PREPAREDNESS
  5. Chapter 5 — FIRE SERVICE FEATURES
  6. Chapter 6 — BUILDING SERVICES AND SYSTEMS
  7. Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
  8. Chapter 8 — INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHI…
  9. Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
  10. Chapter 10 — MEANS OF EGRESS
  11. Chapter 11 — CONSTRUCTION REQUIREMENTS FOR EXISTING BUILDINGS
  12. Chapter 12 — ENERGY SYSTEMS
  13. Chapter 20 — AVIATION FACILITIES
  14. Chapter 21 — DRY CLEANING
  15. Chapter 22 — COMBUSTIBLE DUST-PRODUCING OPERATIONS
  16. Chapter 23 — MOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES
  17. Chapter 24 — FLAMMABLE FINISHES
  18. Chapter 25 — FRUIT AND CROP RIPENING
  19. Chapter 26 — FUMIGATION AND INSECTICIDAL FOGGING
  20. Chapter 27 — SEMICONDUCTOR FABRICATION FACILITIES
  21. Chapter 28 — LUMBER YARDS AND AGRO-INDUSTRIAL, SOLID BIOMASS A…
  22. Chapter 29 — MANUFACTURE OF ORGANIC COATINGS
  23. Chapter 30 — INDUSTRIAL OVENS
  24. Chapter 31 — TENTS, TEMPORARY SPECIAL EVENT STRUCTURES AND OTH…
  25. Chapter 32 — HIGH-PILED COMBUSTIBLE STORAGE
  26. Chapter 33 — FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION
  27. Chapter 34 — TIRE REBUILDING AND TIRE STORAGE
  28. Chapter 35 — WELDING AND OTHER HOT WORK
  29. Chapter 36 — MARINAS
  30. Chapter 37 — COMBUSTIBLE FIBERS
  31. Chapter 38 — RESERVED
  32. Chapter 39 — PROCESSING AND EXTRACTION FACILITIES
  33. Chapter 40 — STORAGE OF DISTILLED SPIRITS AND WINES
  34. Chapter 41 — TEMPORARY HEATING AND COOKING OPERATIONS
  35. Chapter 48 — MOTION PICTURE AND TELEVISION PRODUCTION STUDIO S…
  36. Chapter 49 — REQUIREMENTS FOR WILDLAND-URBAN INTERFACE FIRE AR…
  37. Chapter 50 — HAZARDOUS MATERIALS—GENERAL PROVISIONS
  38. Chapter 51 — AEROSOLS
  39. Chapter 52 — RESERVED
  40. Chapter 53 — COMPRESSED GASES
  41. Chapter 54 — CORROSIVE MATERIALS
  42. Chapter 55 — CRYOGENIC FLUIDS
  43. Chapter 56 — EXPLOSIVES AND FIREWORKS
  44. Chapter 57 — FLAMMABLE AND COMBUSTIBLE LIQUIDS
  45. Chapter 58 — FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS
  46. Chapter 59 — FLAMMABLE SOLIDS
  47. Chapter 60 — HIGHLY TOXIC AND TOXIC MATERIALS
  48. Chapter 61 — LIQUEFIED PETROLEUM GASES
  49. Chapter 62 — ORGANIC PEROXIDES
  50. Chapter 63 — OXIDIZERS, OXIDIZING GASES AND OXIDIZING CRYOGENI…
  51. Chapter 64 — PYROPHORIC MATERIALS
  52. Chapter 65 — PYROXYLIN (CELLULOSE NITRATE) PLASTICS
  53. Chapter 66 — UNSTABLE (REACTIVE) MATERIALS
  54. Chapter 67 — WATER-REACTIVE SOLIDS AND LIQUIDS
  55. Chapter 80 — REFERENCED STANDARDS
  56. Appendix Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON US…
  57. Appendix A — BOARD OF APPEALS
  58. Appendix B — FIRE-FLOW REQUIREMENTS FOR BUILDINGS
  59. Appendix BB — FIRE-FLOW REQUIREMENTS FOR BUILDINGS
  60. Appendix C — FIRE HYDRANT LOCATIONS AND DISTRIBUTION
  61. Appendix CC — FIRE HYDRANT LOCATIONS AND DISTRIBUTION
  62. Appendix D — FIRE APPARATUS ACCESS ROADS
  63. Appendix E — HAZARD CATEGORIES
  64. Appendix F — HAZARD RANKING
  65. Appendix G — CRYOGENIC FLUIDS—WEIGHT AND VOLUME EQUIVALENTS
  66. Appendix H — HAZARDOUS MATERIALS MANAGEMENT PLANS AND HAZARDOU…
  67. Appendix I — FIRE PROTECTION SYSTEMS—NONCOMPLIANT CONDITIONS
  68. Appendix J — BUILDING INFORMATION SIGN
  69. Appendix K — CONSTRUCTION REQUIREMENTS FOR EXISTING AMBULATORY…
  70. Appendix L — REQUIREMENTS FOR FIREFIGHTER AIR REPLENISHMENT SY…
  71. Appendix M — HIGH-RISE BUILDINGS—RETROACTIVE AUTOMATIC SPRINKL…
  72. Appendix N — INDOOR TRADE SHOWS AND EXHIBITIONS
  73. Appendix O — VALET TRASH AND RECYCLING COLLECTION IN GROUP R-2…
  74. Appendix P — TEMPORARY HAUNTED HOUSES, GHOST WALKS AND SIMILAR…
  75. Appendix Q — COMMUNITY WILDLAND-URBAN INTERFACE (WUI) FIRE HAZ…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.