1907.1 General.

The thickness of concrete floor slabs supported directly on the ground shall be not less than 3 1 /2 inches (89 mm). A 6-mil (0.006 inch; 0.15 mm) polyethylene vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab.

Exception: A vapor retarder is not required:

  1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings or other unheated facilities.

  2. For unheated storage rooms having an area of less than 70 square feet (6.5 m 2 ) and carports attached to occupancies in Group R-3.

  3. For buildings of other occupancies where migration of moisture through the slab from below will not be detrimental to the intended occupancy of the building.

Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.

CONCRETE

1909.2.2 Steel fiber reinforcement - Not permitted.

1909.2.3 Cementitious material. The concrete supplier shall furnish to the enforcement agency certification that the cement proposed for use on the project has been man- ufactured and tested in compliance with the requirements of ASTM C150 for portland cement and ASTM C595 or ASTM C1157 for blended hydraulic cement, whichever is applicable. When a mineral admixture or ground granu- lated blast-furnace slag is proposed for use, the concrete supplier shall furnish to the enforcement agency certifica- tion that they have been manufactured and tested in com- pliance with ASTM C618 or ASTM C989, whichever is applicable. The concrete producer shall provide copies of the cementitious material supplier's certificate of compli- ance that represents the materials used by date of ship- ment for concrete. Cementitious materials without certification of compliance shall not be used.

1909.2.4 Tests of reinforcing bars. Samples shall be taken from bundles as delivered from the mill, with the bundles identified as to heat number and the accompanying mill certificate. One tensile test and one bend test shall be made from a sample from each 10 tons (9080 kg) or frac- tion thereof of each size of reinforcing steel.

Where positive identification of the heat number cannot be made or where random samples are to be taken, one series of tests shall be made from each 2 1 /2 tons (2270 kg) or fraction thereof of each size of reinforcing steel.

Tests of reinforcing bars may be waived by the struc- tural engineer with the approval of the Building Official for one-story buildings or non-building structures pro- vided they are identified in the construction documents and certified mill test reports are provided to the inspector of record for each shipment of such reinforcement.

1909.2.5 Tests for prestressing steel and anchorage. All wires or bars of each size from each mill heat and all strands from each manufactured reel to be shipped to the site shall be assigned an individual lot number and shall be tagged in such a manner that each lot can be accu- rately identified at the job site. Each lot of tendon and anchorage assemblies and bar couplers to be installed shall be likewise identified.

The following samples of materials and tendons selected by the engineer or the designated testing labora- tory from the prestressing steel at the plant or job site shall be furnished by the contractor and tested by an approved independent testing agency:

1. For wire, strand or bars, 7-foot-long (2134 mm) samples shall be taken of the coil of wire or strand reel or rods. A minimum of one random sample per 5,000 pounds (2270 kg) of each heat or lot used on the job shall be selected.

2. For prefabricated prestressing tendons other than bars, one completely fabricated tendon 10 feet (3048 mm) in length between grips with anchorage assem- bly at one end shall be furnished for each size and type of tendon and anchorage assembly.

Variations of the bearing plate size need not be considered.

The anchorages of unbonded tendons shall develop at least 95 percent of the minimum specified ultimate strength of the prestressing steel. The total elongation of the tendon under ultimate load shall not be less than 2 percent measured in a minimum gage length of 10 feet (3048 mm).

Anchorages of bonded tendons shall develop at least 90 percent of the minimum specified strength of the prestressing steel tested in an unbonded state. All couplings shall develop at least 95 percent of the minimum specified strength of the prestressing steel and shall not reduce the elongation at rupture below the requirements of the tendon itself.

3. If the prestressing tendon is a bar, one 7-foot (2134 mm) length complete with one end anchorage shall be furnished and, in addition, if couplers are to be used with the bar, two 4-foot (1219 mm) lengths of bar fabricated to fit and equipped with one coupler shall be furnished.

4. Mill tests of materials used for end anchorages shall be furnished. In addition, at least one Brinnell hard- ness test shall be made of each thickness of bearing plate.

1909.2.6 Composite construction cores. Cores of the com- pleted composite concrete construction shall be taken to demonstrate the shear strength along the contact surfaces. The cores shall be tested when the cast-in-place concrete is approximately 28 days old and shall be tested by a shear loading parallel to the joint between the precast concrete and the cast-in-place concrete. The minimum unit shear strength of the contact surface area of the core shall not be less than 100 psi (689 kPa).

At least one core shall be taken from each building for each 5,000 square feet (465 m 2 ) of area of composite concrete construction and not less than three cores shall be taken from each project. The architect or structural engineer in responsible charge of the project or his or her representative shall designate the location for sam- pling.

1909.2.7 Tests for post-installed anchors in concrete. When post-installed anchors are used in lieu of cast-in- place bolts, the installation verification test loads fre- quency and acceptance criteria shall be in accordance with this section.

1909.2.7.1 General. Test loads or torques and accep- tance criteria shall be shown on the construction docu- ments.

If any anchor fails testing, all anchors of the same type shall be tested, which are installed by the same trade, not previously tested until twenty (20) consecu- tive anchors pass, then resume the initial test frequency.

1909.2.7.2 Testing procedure. The test procedure shall be as permitted by an approved evaluation report using

19-10 2022 CALIFORNIA BUILDING CODE

Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.

criteria adopted in this code. All post-installed anchors shall be tension tested.

Exception: Torque-controlled post-installed anchors and screw type anchors shall be permitted to be tested using torque based on an approved evaluation report using criteria adopted in this code.

Alternatively, the manufacturer’s recommendation for testing may be approved by the enforcement agency based on approved evaluation report using criteria adopted in this code.

1909.2.7.3 Test frequency. When post-installed anchors are used for sill plate bolting applications, 10 percent of the anchors shall be tested.

When post-installed anchors are used for other structural applications, all such anchors shall be tested.

When post-installed anchors are used for nonstruc- tural applications such as equipment anchorage, 50 percent or alternate bolts in a group, including at least one-half the anchors in each group, shall be tested.

The testing of the post-installed anchors shall be done in the presence of the special inspector and a report of the test results shall be submitted to the enforcement agency.

Exceptions:

1. Undercut anchors that allow visual confirma- tion of full set shall not require testing.

2. Where the design tension on anchors is less than 100 pounds and those anchors are clearly noted on the approved construction documents, only 10 percent of those anchors shall be tested.

3. Where adhesive anchor systems are used to install reinforcing dowel bars in hardened concrete, only 25 percent of the dowels shall be tested if all the following conditions are met:

a. The dowels are used exclusively to transmit

shear forces across joints between existing and new concrete.

b. The number of dowels in any one member

equals or exceeds 12.

c. The dowels are uniformly distributed across

seismic force resisting members (such as shear walls, collectors and diaphragms).

Anchors to be tested shall be selected at random by the special inspector/inspector of record (IOR).

4. Testing of shear dowels across cold joints in slabs on grade, where the slab is not part of the lateral force-resisting system shall not be required.

5. Testing is not required for power actuated fas- teners used to attach tracks of interior non-

CONCRETE

shear wall partitions for shear only where there are at least three fasteners per segment of track.

1909.2.7.4 Test loads. Required test loads shall be determined by one of the following methods:

1. Twice the maximum allowable tension load or one and a quarter (1 1 /4) times the maximum design strength of anchors as provided in an approved test report using criteria adopted in this code or determined in accordance with Chapter 17 of ACI 318.

Tension test load need not exceed 80 percent of the nominal yield strength of the anchor element (= 0.8 Ase fya).

2. The manufacturer's recommended installation torque based on an approved test report using criteria adopted in this code.

1909.2.7.5 Test acceptance criteria. Acceptance crite- ria for post-installed anchors shall be based on an approved test report using criteria adopted in this code. Field tests shall satisfy the following minimum requirements.

1. Hydraulic ram method:

Anchors tested with a hydraulic jack or spring loaded apparatus shall maintain the test load for a minimum of 15 seconds and shall exhibit no discern- ible movement during the tension test, e.g., as evi- denced by loosening of the washer under the nut.

The testing apparatus support locations shall not be within 1.5 times the anchor’s embedment depth to avoid restricting the concrete shear cone type fail- ure mechanism from occurring.

Exception: When denoted accordingly on the approved construction documents, adhesive anchors complying with ACI 318 Equation 17.8.2a and for which concrete breakout does not control the design tensile strength may be tested with apparatus support locations closer than 1.5 times the anchor embedment depth.

2. Torque wrench method:

Torque-controlled post-installed anchors tested with a calibrated torque wrench shall attain the specified torque within 1 /2 turn of the nut; or one- quarter ( 1 /4) turn of the nut for a 3 /8-inch sleeve anchor only.

Screw-type anchors tested with a calibrated torque wrench shall attain the specified torque within one-quarter ( 1 /4) turn of the screw after initial seating of the screw head.

1909.2.8 Flat wall insulating concrete form (ICF) systems. ICF systems shall be considered alternative systems. Concrete constructed using ICF systems and attachments to ICF shall be designed for loads in accor- dance with this code and shall comply with manufacturer’s instructions and industry standards deter-

Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.

CONCRETE

mined applicable by the enforcement agency. Calculations and drawings shall be submitted to the enforcement agency for review and approval prior to construction.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Building Code (Title 24, Part 2)
California Building Code (Title 24, Part 2)
  1. Chapter 2 — DEFINITIONS AND ABBREVIATIONS
  2. Appendix G — FLOOD-RESISTANT
  3. Appendix L — EARTHQUAKE RECORDING
  4. Appendix M — TSUNAMI-GENERATED
  5. Appendix N — REPLICABLE
  6. Appendix O — PERFORMANCE-BASED
  7. Chapter 1 — SCOPE AND ADMINISTRATION
  8. Chapter 3 — OCCUPANCY CLASSIFICATION AND USE
  9. Chapter 4 — SPECIAL DETAILED REQUIREMENTS BASED ON OCCUPANCY A…
  10. Chapter 5 — GENERAL BUILDING HEIGHTS AND AREAS
  11. Chapter 6 — TYPES OF CONSTRUCTION
  12. Chapter 7 — FIRE AND SMOKE PROTECTION FEATURES
  13. Chapter 7A — MATERIALS AND CONSTRUCTION
  14. Chapter 8 — INTERIOR FINISHES
  15. Chapter 9 — FIRE PROTECTION AND LIFE SAFETY SYSTEMS
  16. Chapter 10 — MEANS OF EGRESS
  17. Chapter 11A — HOUSING ACCESSIBILITY
  18. Chapter 11B — ACCESSIBILITY TO PUBLIC BUILDINGS, PUBLIC ACCOMM…
  19. Chapter 12 — INTERIOR ENVIRONMENT
  20. Chapter 14 — EXTERIOR WALLS
  21. Chapter 15 — ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
  22. Chapter 16 — STRUCTURAL DESIGN
  23. Chapter 16A — STRUCTURAL DESIGN
  24. Chapter 17 — SPECIAL INSPECTIONS AND TESTS
  25. Chapter 18 — SOILS AND FOUNDATIONS
  26. Chapter 19 — CONCRETE
  27. Chapter 20 — ALUMINUM
  28. Chapter 21 — MASONRY
  29. Chapter 22 — STEEL
  30. Chapter 23 — WOOD
  31. Chapter 24 — GLASS AND GLAZING
  32. Chapter 25 — GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER
  33. Chapter 26 — PLASTIC
  34. Chapter 27 — ELECTRICAL
  35. Chapter 28 — MECHANICAL SYSTEMS
  36. Chapter 30 — ELEVATORS AND CONVEYING SYSTEMS
  37. Chapter 31 — SPECIAL CONSTRUCTION
  38. Chapter 31B — PUBLIC POOLS
  39. Chapter 31C — RADIATION
  40. Chapter 31D — FOOD ESTABLISHMENTS
  41. Chapter 31F — MARINE OIL TERMINALS
  42. Chapter 32 — ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
  43. Chapter 33 — SAFEGUARDS DURING CONSTRUCTION
  44. Chapter 35 — REFERENCED STANDARDS
  45. Appendix A — EMPLOYEE QUALIFICATIONS
  46. Appendix B — BOARD OF APPEALS
  47. Appendix C — GROUP U – AGRICULTURAL BUILDINGS
  48. Appendix D — FIRE DISTRICTS
  49. Appendix F — RODENTPROOFING
  50. Appendix H — SIGNS
  51. Appendix I — PATIO COVERS
  52. Appendix J — GRADING
  53. Appendix K — GROUP R-3 AND GROUP R-3.1 OCCUPANCIES
  54. Appendix P — EMERGENCY HOUSING

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.