Division 10 — SOIL AND WATER CONSERVATION›Chapter 2 — EROSION AND SEDIMENT CONTROL
810.0260 Inspection and Compliance.
Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa
The City Engineer shall conduct inspections to ensure compliance with this Chapter.
- (a) Inspection
The following inspections may be performed by the City Engineer.
- (1) Pre-Site Inspection
To determine the potential for erosion resulting from the proposed project
(2) Operation Progress Inspections
To determine ongoing compliance
- (3) Final Inspection
To determine compliance with approved plans and specifications
(b) Notification
The permittee shall notify the City Engineer at least 24 hours prior to the start of the authorized work, and also nine business hours prior to any inspection requested by the permittee or the permittee’s authorized agent.
(c) Right of Entry
The filing of an application for a development permit constitutes a grant of permission for the City to enter the permit area for the purpose of administering this chapter from the date of the application to the termination of the erosion control maintenance period.
810.0265 Applicable Laws and Regulations.
Any person doing work in conformance with this chapter must also abide by all other applicable local, State and Federal laws and regulations. Where there is a conflict with other pre-existing City regulations, that conflict shall be resolved before the project is allowed to proceed.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Yucaipa Zoning Code
- Division 1 — GENERAL PROVISIONS
- Division 2 — REVIEWING AUTHORITIES
- Division 3 — PROCEDURES
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 4 — LAND USES
- Division 6 — PLANNING AREAS
- Division 7 — GENERAL DESIGN STANDARDS
- Division 8 — SPECIFIC USE DESIGN STANDARDS
- Division 9 — PLANT PROTECTION AND MANAGEMENT
▸Division 10 — SOIL AND WATER CONSERVATION
Overview- Chapter 1 — SURFACE MINING AND LAND RECLAMATION
▸Chapter 2 — EROSION AND SEDIMENT CONTROL
Overview- 810.0201 Purpose.
- 810.0205 Scope.
- 810.0210 General Provisions.
- 810.0215 Project Design Considerations.
- 810.0225 Runoff Control.
- 810.0230 Land Clearing.
- 810.0235 Winter Operations.
- 810.0240 Continued Responsibility.
- 810.0245 Exemptions.
- 810.0250 Variances.
- 810.0260 Inspection and Compliance.
- 810.0270 Appeals.
- 810.0275 Subject Areas.
- Chapter 3 — WIND-BORNE SOIL EROSION
- Chapter 4 — WATER CONSERVATION
- Chapter 5 — ONSITE WASTEWATER TREATMENT SYSTEMS
- Division 11 — PUBLIC FACILITIES FINANCING