810.0235 Winter Operations.
Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa
(a) The City Engineer shall only authorize the following between October 15 and April 15 when it is found that such projects comply with the provisions and are consistent with the purposes of this chapter.
(1) Contiguous land clearing operations involving greater than one acre in a one-year period of time
(2) Major grading operations (greater than 100 cubic yards)
When construction will be delayed due to the limitation on winter operations, the date for expiration of the permit shall be extended by that amount of time that work is delayed by the requirements of this chapter.
(b) The City Engineer and the City Planner shall stamp or attach the following statement to all development permits and plans issued within areas subject to the provisions of this chapter.
NOTICE: IF THE CONSTRUCTION ACTIVITY WILL EXTEND INTO THE WINTER OPERATIONS PERIOD (OCTOBER 15 THROUGH APRIL 15), ADDITIONAL SOIL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED.
ANY DEVELOPMENT PROJECT WHICH IS REQUIRED TO IMPLEMENT AN APPROVED SOIL EROSION CONTROL PLAN SHALL HAVE SUCH APPROVED PLAN AMENDED IF IT DOES NOT COMPLY WITH THE PROVISIONS ESTABLISHED FOR WINTER OPERATION BY SECTION 810.0535 OF THE YUCAIPA CODE.
ALL REQUIRED WINTER OPERATION EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO OCTOBER 15 FOR ONGOING CONSTRUCTION PROJECTS AND PRIOR TO ANY CONSTRUCTION ACTIVITY FOR THOSE DEVELOPMENT PROJECTS COMMENCING BETWEEN OCTOBER 15 AND APRIL 15.
(c) The following winter operation measures shall be taken to prevent accelerated erosion. Additional measures may be required by the City Engineer when determined to be necessary by field inspection.
(1) Between October 15 and April 15, disturbed surfaces not involved in the immediate operation shall be protected by mulching or other effective means of soil protection.
(2) All roads and driveways shall have drainage facilities sufficient to prevent erosion on or adjacent to the roadway or on downhill properties. Erosion-resistant surfacing may include, but is not limited to, slag, crushed rock, or natural soil when compacted to 90% of maximum density as determined by Test D1557-58T of the American Society for Testing and Materials for the top 12 inches.
(3) Runoff from a site shall be detained or filtered by berms, vegetated filter strips, or catch basins to prevent the escape of sediment from the site. These drainage controls shall be maintained by the permittee or property owner as necessary to achieve their purpose throughout the life of the project.
(4) Erosion control measures shall be in place at the end of each day’s work.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Yucaipa Zoning Code
- Division 1 — GENERAL PROVISIONS
- Division 2 — REVIEWING AUTHORITIES
- Division 3 — PROCEDURES
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 4 — LAND USES
- Division 6 — PLANNING AREAS
- Division 7 — GENERAL DESIGN STANDARDS
- Division 8 — SPECIFIC USE DESIGN STANDARDS
- Division 9 — PLANT PROTECTION AND MANAGEMENT
▸Division 10 — SOIL AND WATER CONSERVATION
Overview- Chapter 1 — SURFACE MINING AND LAND RECLAMATION
▸Chapter 2 — EROSION AND SEDIMENT CONTROL
Overview- 810.0201 Purpose.
- 810.0205 Scope.
- 810.0210 General Provisions.
- 810.0215 Project Design Considerations.
- 810.0225 Runoff Control.
- 810.0230 Land Clearing.
- 810.0235 Winter Operations.
- 810.0240 Continued Responsibility.
- 810.0245 Exemptions.
- 810.0250 Variances.
- 810.0260 Inspection and Compliance.
- 810.0270 Appeals.
- 810.0275 Subject Areas.
- Chapter 3 — WIND-BORNE SOIL EROSION
- Chapter 4 — WATER CONSERVATION
- Chapter 5 — ONSITE WASTEWATER TREATMENT SYSTEMS
- Division 11 — PUBLIC FACILITIES FINANCING