Division 10 — SOIL AND WATER CONSERVATION›Chapter 2 — EROSION AND SEDIMENT CONTROL
810.0250 Variances.
Yucaipa Zoning Code · 2026-06 edition · updated 2026-09-10 · Yucaipa
A request for a variance from the provisions of this chapter, the permit conditions, or the plan specifications may be approved, conditionally approved, or denied by the City Engineer. The City Engineer may refer any variance request filed in accordance with the provisions of this section to the appeal authority as defined in Section 810.0570. A request for a variance must state in writing the provision from which it is to be varied, the proposed substitute provisions, when it would apply, and its advantages. In granting a variance, the City Engineer shall be guided by the following criteria.
(a) That there are special circumstances or conditions affecting the property
(b) That the variance is necessary for the proper design and/or function of a reasonable project for the property
(c) That adequate measures will be taken to ensure consistency with the purpose of this chapter
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Yucaipa Zoning Code
- Division 1 — GENERAL PROVISIONS
- Division 2 — REVIEWING AUTHORITIES
- Division 3 — PROCEDURES
- Division 1
- Division 2
- Division 3
- Division 4
- Division 5
- Division 6
- Division 7
- Division 4 — LAND USES
- Division 6 — PLANNING AREAS
- Division 7 — GENERAL DESIGN STANDARDS
- Division 8 — SPECIFIC USE DESIGN STANDARDS
- Division 9 — PLANT PROTECTION AND MANAGEMENT
▸Division 10 — SOIL AND WATER CONSERVATION
Overview- Chapter 1 — SURFACE MINING AND LAND RECLAMATION
▸Chapter 2 — EROSION AND SEDIMENT CONTROL
Overview- 810.0201 Purpose.
- 810.0205 Scope.
- 810.0210 General Provisions.
- 810.0215 Project Design Considerations.
- 810.0225 Runoff Control.
- 810.0230 Land Clearing.
- 810.0235 Winter Operations.
- 810.0240 Continued Responsibility.
- 810.0245 Exemptions.
- 810.0250 Variances.
- 810.0260 Inspection and Compliance.
- 810.0270 Appeals.
- 810.0275 Subject Areas.
- Chapter 3 — WIND-BORNE SOIL EROSION
- Chapter 4 — WATER CONSERVATION
- Chapter 5 — ONSITE WASTEWATER TREATMENT SYSTEMS
- Division 11 — PUBLIC FACILITIES FINANCING