Division 2 — Rules for Calculation and Measurement
§113.0261 Determining a Story
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
A story is that portion of a building between finish- floor elevations, between finish- floor and roof elevations, and between grade and finish- floor elevations.
- (a) First Story
The first story is the lowest story or ground story of any building, the floor of which is not more than 2 feet, 6 inches above existing grade or proposed grade , whichever is lower, measured to the finish- floor elevation.
- (b) Attic
An attic is a story if it meets one of the following criteria:
(1) It has a mansard or similar roof;
(2) It has a height that exceeds 7 feet, 6 inches from the finish- floor elevation to the peak of the roof immediately above;
(3) It has dormers projecting from a sloping roof where the attic can be used as a habitable area, unless the dormer is designed exclusively for ventilation and is not accessible from a habitable area; or
(4) The proposed floor area of the attic exceeds one-half of the floor area of the story immediately below.
(c) Penthouse
A penthouse is a story if it meets one of the following criteria:
(1) Its height above the roof line is more than 13 feet for an elevator shaft or more than 9 feet for a stairwell; or
(2) Its total plan area is more than 10 percent of the roof plan area of the building.
(d) Underground Parking Structures and Basements
Underground parking structures and basements are stories if there is a vertical distance, at any point, of 6 feet or more between existing grade or proposed grade , whichever is lower, and the finish- floor elevation immediately above. See Diagram 113-02FF.
Ch. Art. Div. 11 3 2 33
San Diego Municipal Code
Chapter 11: Land Development Procedures
(10-2024)
Diagram 113-02FF
Underground Parking Structures and Basements
==> picture [364 x 162] intentionally omitted <==
----- Start of picture text -----
Building Outline
VehicularVehicular Access
Building
Openings
Grade
Finish-floor
6' Max
V ehicular
Access
25' CL
Max
STREET
CL
Section view Plan view
STREET
----- End of picture text -----
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 11-13-2008 by O-19801 N.S.; effective 12-13-2008.) (Amended 8-4-2011 by O-20081 N.S.; effective 10-6-2011.)
Ch. Art. Div. 11 3 2 34
San Diego Municipal Code
Chapter 11: Land Development Procedures
(10-2024)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
-
▸ Division 2 — Rules for Calculation and Measurement
Overview- §113.0201 Purpose of Rules for Calculation and Measurement
- §113.0202 When Rules for Calculation and Measurement Apply
- §113.0213 Determining Building Envelope
- §113.0216 Determining Building Facade
- §113.0219 Determining Coastal Bluff Edge
- §113.0222 Calculating Maximum Permitted Density
- §113.0225 Measuring Distance Between Uses
- §113.0228 Determining Existing Grade
- §113.0234 Calculating Gross Floor Area
- §113.0237 Determining a Lot
- §113.0240 Calculating Lot Coverage
- §113.0243 Measuring Lot Depth and Lot Width
- §113.0246 Determining Property Lines
- §113.0249 Determining Setback Line
- §113.0252 Measuring Setbacks
- §113.0255 Calculating Sign Copy Area
- §113.0258 Calculating Sign Face
- §113.0261 Determining a Story
- §113.0264 Determining Street Wall
- §113.0267 Determining Street Wall Line
- §113.0270 Measuring Structure Height
- §113.0273 Measuring Visibility Area
- §113.0276 Determining Yards
- Chapter 12 — Land Development Reviews
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone