Skip to content

Division 2 — Rules for Calculation and Measurement

§113.0243 Measuring Lot Depth and Lot Width

San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego

  • (a) Lot depth is measured along an imaginary straight line drawn from the midpoint of the front property line of the lot to the midpoint of the rear property line .

  • (b) Lot width is measured along an imaginary straight line drawn at right angles to the lot depth line, between the side lot lines at the point midway between the front and rear property lines . Diagram 113-02Y illustrates how to measure lot depth and width.

Diagram 113-02Y

==> picture [282 x 144] intentionally omitted <==

----- Start of picture text -----
Lot Depth and Width
(Midpoint of
lot depth line)
60'
Lot width line 25'
50' Lotdepth (Midpoint of
line front property line)
120'
STREET
----- End of picture text -----

  • (c) Lot Width for Residential Lots

    • (1) For irregularly shaped lots , such as pie shaped lots , the lot width is determined by calculating the average lot width for the first 50 feet of lot depth.

    • (2) For consolidated lots , the lot width is equivalent to the total width of the premises after the consolidation.

(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 11-13-2008 by O-19801 N.S.; effective 12-13-2008.)

Ch. Art. Div. 11 3 2 25

San Diego Municipal Code (10-2024)

Chapter 11: Land Development Procedures

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — San Diego Zoning Code
San Diego Zoning Code
  1. Chapter 9
  2. Division 2 — House Numbers
  3. Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
  4. Division 1 — General Provisions and Definitions
  5. Division 2 — Financing Facilities
  6. Division 3 — Bonds
  7. Division 1 — Housing Code
  8. Division 2 — Mobilehome Parks and Special Occupancy Parks
  9. Division 3 — San Diego Housing Commission
  10. Division 4 — Interim School Facilities Financing Ordinance
  11. Division 6 — Housing Impact Fees On Commercial Development
  12. Division 7 — Residential Tenant Protections
  13. Division 8 — Prohibition of Discrimination Based on a Tenant’s…
  14. Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
  15. Division 10 — Affordable Housing Preservation
  16. Division 11 — Prohibition of Anti-Competitive Automated Rent P…
  17. Division 12 — Residential Tenant Utility Fees
  18. Division 1 — In General
  19. Division 2 — Responsibilities of City Council
  20. Division 3 — Administration of Program
  21. Division 5 — Designation of Residential Rehabilitation Areas a…
  22. Division 6 — Limitations on Amount of Loan
  23. Division 7 — Terms of Conventional RAP Loans
  24. Division 9 — Miscellaneous Provisions
  25. Division 19.7 — The Centre City Planned District
  26. Division 19.8 — The Centre City Planned District
  27. Division 2 — Land Development Authorities and Advisory Boards
  28. Division 2 — Fees and Deposits
  29. Division 3 — Notice
  30. Division 4 — Public Hearings
  31. Division 5 — Decision Process
  32. Division 1 — Definitions
  33. Division 2 — Rules for Calculation and Measurement
  34. Division 2 — Enforcement Authorities For the Land Development …
  35. Division 4 — Procedures For Abatement of Unsafe, Dangerous,
  36. Division 1 — Adoption And Amendment Procedures for Land Use Pl…
  37. Division 1 — Zoning and Rezoning Procedures
  38. Division 3 — Zoning Use Certificate Procedures
  39. Division 5 — Residential High Occupancy Permit
  40. Division 6 — Mobile Food Truck Permit
  41. Division 1 — General Subdivision Procedures
  42. Division 2 — Certificate of Compliance
  43. Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
  44. Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
  45. Division 6 — Final Maps
  46. Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
  47. Division 8 — Reversion to Acreage
  48. Division 9 — Public Right-of-Way Vacations
  49. Division 10 — Easement Vacations
  50. Division 3 — Conditional Use Permit Procedures
  51. Division 4 — Neighborhood Development Permit Procedures (Added…
  52. Division 5 — Site Development Permit Procedures
  53. Division 6 — Planned Development Permit Procedures (Added 12-9…
  54. Division 8 — Variance Procedures
  55. Division 1 — General Review Procedures for Previously Conformi…
  56. Division 2 — Review Procedures for Previously Conforming Signs
  57. Division 1 — General Procedures and Authorities for Implementa…
  58. Division 2 — Procedures for Determination of
  59. Division 3 — Procedures for Preparation and Review of Environm…
  60. Division 1 — General Construction Permit Authority and Procedu…
  61. Division 2 — Building Permit Procedures
  62. Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
  63. Division 4 — Plumbing/Mechanical Permit Procedures
  64. Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
  65. Division 7 — Public Right-of-Way Permits
  66. Division 9 — Fire Permit Procedures
  67. Division 4 — Residential Base Zones
  68. Division 5 — Commercial Base Zones
  69. Division 6 — Industrial Base Zones
  70. Division 7 — Mixed-Use Base Zones
  71. Division 2 — Airport Approach Overlay Zone
  72. Division 3 — Airport Environs Overlay Zone
  73. Division 6 — Sensitive Coastal Overlay Zone
  74. Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
  75. Division 8 — Parking Impact Overlay Zone
  76. Division 9 — Residential Tandem Parking Overlay Zone
  77. Division 10 — Transit Area Overlay Zone
  78. Division 11 — Urban Village Overlay Zone
  79. Division 12 — Mission Trails Design District
  80. Division 13 — Clairemont Height Limit Overlay Zone
  81. Division 15 — Airport Land Use Compatibility Overlay Zone
  82. Division 16 — Community Enhancement Overlay Zone

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.