Division 2 — Rules for Calculation and Measurement
§113.0246 Determining Property Lines
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
The property lines define the perimeter of a lot or premises and separate one lot or premises from any other lot or premises or from the public right-of-way . These rules for determining property lines are for purposes of applying and interpreting development regulations only and are not intended to affect ownership rights or responsibilities. These rules apply regardless of ownership of property extending into the public right-of-way . Where dedications for streets or alleys are required in accordance with Section 142.0610, the property lines used to calculate lot area for the purpose of calculating the maximum permitted density and maximum permitted gross floor area shall be based on the property lines prior to the dedication. Where dedications for streets or alleys are required in accordance with Section 142.0610, the property lines used to calculate front of street side setbacks shall be based on the property lines prior to the dedication.
- (a) Front Property Line . The front property line separates a lot from the public right-of-way or private street. On corner lots , the front property line lies along the narrowest street frontage , as shown in Diagram 113-02Z.
Diagram 113-02Z
Front Property Line for Corner Lots
==> picture [179 x 122] intentionally omitted <==
----- Start of picture text -----
Front Property Line Street
(Narrower frontage) C L
50' Street Side
Property Line
25' CL
Rear
Property
Line
----- End of picture text -----
- (b) Front Property Line for Double-Fronted Lots . When a lot extends from one street to another street , the front property line lies along both frontages, as shown in Diagram 113-02AA, unless the right of vehicular access has been waived to one of the streets as required by a governmental agency. In this case, the line separating the lot from the street where access is waived becomes the rear property line .
Ch. Art. Div. 11 3 2 26
San Diego Municipal Code
Chapter 11: Land Development Procedures
(10-2024)
Diagram 113-02AA
Front Property Line for Double-Fronted Lots
==> picture [96 x 140] intentionally omitted <==
----- Start of picture text -----
STREET
Front
property
lines
STREET
----- End of picture text -----
- (c) Rear Property Line . The rear property line is the property line opposite and most distant from the front property line , as shown in Diagram 113-02Z. For a triangular lot , the rear property line is a line 10 feet in length within the lot that connects the two side property lines and is parallel to the front property line , or parallel to the chord of a curved front property line , and at the maximum distance from it, as shown in Diagram 113-02BB.
Diagram 113-02BB
Rear Property Line on Triangular Lot
==> picture [48 x 67] intentionally omitted <==
==> picture [109 x 117] intentionally omitted <==
----- Start of picture text -----
Rear
property line
1 0'
STREET
----- End of picture text -----
Ch. Art. Div. 11 3 2 27
San Diego Municipal Code
Chapter 11: Land Development Procedures
(10-2024)
(d) Side and Street Side Property Lines . The side property lines connect the front property lines to the rear property lines at the corners of the lot . The side property line that abuts the public right-of-way is the street side property line .
(e) Property Lines that Abut an Alley . A property line that abuts an alley shall be determined in accordance with Section 113.0246(a) through (d). However, the property line that abuts an alley shall not be considered a street property line for the purpose of determining setbacks or street yards as indicated below and as shown in Diagram 113-02CC.
(1) Alley adjacent to front property line. A setback equivalent to a rear yard shall be applied when a lot abuts an alley as a front property line .
(2) Alley adjacent to side property line. A setback equivalent to an interior side yard shall be applied when a lot abuts an alley as a street side property line .
(3) Alley adjacent to rear property line . A setback equivalent to a rear yard shall be applied when a lot abuts an alley as a rear property line .
Diagram 113-02CC
Alley Setbacks
==> picture [479 x 194] intentionally omitted <==
----- Start of picture text -----
Street Apply Front
Yard Setback
Street
Front Property line
Front
Property Line Street Side Yard
Building Apply Front Yard Setback Property Line
Building
Rear Apply Interior
Side Yard
Property Line
Apply Rear
Yard Setback
Alley
Front
Property Line Building Apply Rear
Yard Setback
Alley
----- End of picture text -----
Ch. Art. Div. 11 3 2 28
San Diego Municipal Code (10-2024)
Chapter 11: Land Development Procedures
- (f) Resubdivided Corner Lots in Residential Zones.
In residential zones, property lines for resubdivided corner lots shall be determined in accordance with Section 113.0246 (a) through (d); however, the setbacks along the front property line and street side property line shall observe the setback requirements placed on the original lot configuration and the remaining property lines shall observe the required interior side setback requirements of the zone, as shown in Diagram 113-02DD.
Diagram 113-02DD
Setbacks for Resubdivided Corner Lots
==> picture [349 x 347] intentionally omitted <==
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 11-13-2008 by O-19801 N.S.; effective 12-13-2008.)
Ch. Art. Div. 11 3 2 29
San Diego Municipal Code (10-2024)
Chapter 11: Land Development Procedures
(Amended 8-4-2011 by O-20081 N.S.; effective 10-6-2011.) (Amended 7-22-2024 by O-21836 N.S.; effective 10-5-2024.)
[Editors Note: Amendments as adopted by O-21836 N.S. will not apply within the Coastal Overlay Zone until the California Coastal Commission certifies it as a Local Coastal Program Amendment.
Click the link to view the Strikeout Ordinance highlighting changes to prior language http://docs.sandiego.gov/municode_strikeout_ord/O-21836-SO.pdf
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
-
▸ Division 2 — Rules for Calculation and Measurement
Overview- §113.0201 Purpose of Rules for Calculation and Measurement
- §113.0202 When Rules for Calculation and Measurement Apply
- §113.0213 Determining Building Envelope
- §113.0216 Determining Building Facade
- §113.0219 Determining Coastal Bluff Edge
- §113.0222 Calculating Maximum Permitted Density
- §113.0225 Measuring Distance Between Uses
- §113.0228 Determining Existing Grade
- §113.0234 Calculating Gross Floor Area
- §113.0237 Determining a Lot
- §113.0240 Calculating Lot Coverage
- §113.0243 Measuring Lot Depth and Lot Width
- §113.0246 Determining Property Lines
- §113.0249 Determining Setback Line
- §113.0252 Measuring Setbacks
- §113.0255 Calculating Sign Copy Area
- §113.0258 Calculating Sign Face
- §113.0261 Determining a Story
- §113.0264 Determining Street Wall
- §113.0267 Determining Street Wall Line
- §113.0270 Measuring Structure Height
- §113.0273 Measuring Visibility Area
- §113.0276 Determining Yards
- Chapter 12 — Land Development Reviews
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone