Skip to content

Chapter 5.45 — ALARM SYSTEMS

Paso Robles Municipal Code · 2026-09 edition · updated 2026-09-27 · Paso Robles

5.45.010 - Purpose.

The city hereby finds and determines that the regulations of alarm systems and the control of false alarms is necessary to promote the health, welfare and safety of the people, in that some users have alarm systems which either mechanically malfunction or are not operated properly by their users, causing an increase in false alarm reports, thereby resulting in unnecessary costs and expense to the city, and constituting a hazard to the safety of police officers and the public in general.

(Ord. 523 N.S. (part), 1986)

5.45.020 - Definitions.

For the purpose of this chapter, the following definitions shall apply:

(a)

"Alarm system" means an assembly of equipment and devices arranged to signal the presence of a hazard requiring attention and to which police are "called upon" to respond.

(b)

"False alarm" means an alarm signal, either silent or audible, necessitating response by the police department where an emergency situation for which the alarm system was designed or used does not exist. The activation of an audible alarm system for one second or less shall not be deemed a false alarm.

(c)

"Permittee" means any person holding an alarm system permit issued pursuant to the provisions of this chapter.

(d)

"Person" means and includes any natural person, partnership, corporation, unincorporated association, or other business entity.

(e)

"Police chief" and "police department" mean the police chief and the police department, respectively, of the city.

(f)

"Premises" means any building or structure identified by a numerical or lettered address where an alarm system is installed, or group of units within one building or structure with one system.

(Ord. 523 N.S. (part), 1986)

5.45.030 - Registration of alarm company operators.

It shall be unlawful for any person required to be registered as an alarm company operator by the California Alarm Company Act to engage in the business of an alarm company operator within the city without first filing a copy of such state license with the police department.

(Ord. 523 N.S. (part), 1986)

5.45.040 - Registration of alarm agents.

It shall be unlawful for any person required to be registered as an alarm agent by the California Alarm Company Act to act as an alarm agent within the city without first registering his name and filing a copy of his state identification card with the police department.

(Ord. 523 N.S. (part), 1986)

5.45.050 - Permit required.

(a)

It shall be unlawful for any person to use, install or cause to be installed an alarm system on any premises within the city under his control without having an alarm system permit therefor.

(b)

When emergency messages, signals or notices are received by the police department that evidence a failure to obtain a permit or comply with any other requirement under this chapter, the police chief or his representative is authorized to demand that the owner or lessee of the alarm system initiating such message, signal or notice, disconnect the alarm system until it is made to comply with said requirements.

(Ord. 523 N.S. (part), 1986)

5.45.060 - Permit application forms.

Any person desiring an alarm system permit shall file an application with the police department setting forth the following information:

(a)

The name and address of the applicant;

(b)

The address at which the alarm system is to be installed and used:

(c)

If the applicant is a corporation, the names and addresses of its principal officers;

(d)

If the applicant is a partnership, association or other business entity, the names and addresses of the partners or persons comprising same;

(e)

A description of the alarm system or system proposed to be installed within the city, of El Paso de Robles, including the manufacturer's names and model number, if any; and

(f)

The names, addresses and telephone numbers of one or more persons who will be available to secure the premises during any hour of the day or night.

(Ord. 523 N.S. (part), 1986)

5.45.070 - Alarm system permit fee.

Each alarm system permit applicant is required to pay a one-time alarm system permit fee. The amount of the fee shall be specifically set forth and specified by resolution of the city council. The fee shall be paid at the time the permit application form is submitted. The fee is to cover the cost of the investigation of the facts stated in the application and processing thereof. Such administrative fees shall not be returned to the applicant because they are for service. The chief of police or his/her designee has full discretion to reduce or waive any alarm system permit fee for reasons of financial hardship.

(Ord. 808 N.S. § 1, 2001: Ord. 523 N.S. (part), 1986)

5.45.080 - Alarm system permit issuance denial.

(a)

ISSUANCE. Upon the filing of an application containing all the information required by this chapter, the police department shall issue an alarm system permit, unless the provisions of subsection (b) of this section apply.

(b)

DENIAL. The following reasons shall be sufficient for the denial of an alarm system permit:

(1)

That the application is not in the form and does not contain all the information required by the provisions of this chapter; or

(2)

That the required waiting period following the revocation of an alarm system permit previously issued for the same premises has not expired. See section 5.45.130.

(Ord. 523 N.S. (part), 1986)

5.45.090 - Permits—Separate permits required.

A separate alarm system permit shall be required for each of the premises on which an alarm system is used or installed.

(Ord. 523 N.S. (part), 1986)

5.45.100 - Permits—Correction of information.

Whenever any change occurs relating to the written information required by this chapter, the permittee shall give written notice of such change to the police department within five days.

(Ord. 523 N.S. (part), 1986)

5.45.110 - Alarm system regulations.

(a)

REPAIRS. After any false alarm caused by a malfunction of an alarm system; the permittee shall cause the alarm system to be repaired to eliminate the malfunction before the reactivation of the alarm system by the permittee.

(b)

NOTIFICATION. A permittee shall cause the police department to be notified prior to any service, test, repair, maintenance, alteration or installation of an alarm system which might produce a false alarm.

(c)

AUTOMATIC DEACTIVATION. Every audible alarm system shall be equipped with a device which will automatically deactivate the alarm system not more than thirty minutes after the alarm system is activated.

(d)

PROHIBITED SOUND. No alarm system shall be installed or used which emits a sound which is similar to that of an emergency vehicle siren or a civil defense warning system.

(e)

PERMIT DISPLAY. An alarm system permit shall be posted in a conspicuous place upon the premises for which the permit is issued.

(f)

POWER SUPPLY. Alarm systems shall be supplied with an uninterruptible power supply in such a manner that the failure or interruption of normal utility electricity will not activate the alarm system. The power supply must be capable of at least four hours of operation.

(g)

PROHIBITED SYSTEMS. No person shall have installed any system which when activated automatically dials the El Paso de Robles police department with a prerecorded message.

(Ord. 523 N.S. (part), 1986)

5.45.120 - Permit revocation.

(a)

GROUNDS FOR REVOCATION. An alarm system permit may be revoked by the police chief for any of the following reasons:

(1)

Failure to observe any of the regulations or other provisions of this chapter;

(2)

Alarm system for which the alarm system permit is issued emits more than six false alarms during any consecutive three hundred sixty-five day period; or

(3)

False representations were made upon any application or notice of change required by the provisions of this chapter.

(b)

NOTICES AND EFFECTIVE DATES. A written notice of revocation, stating the reason for such revocation, shall be personally served upon or mailed to the permittee by certified mail addressed to the permittee at the permittee's address shown on the application or the latest notice of change on file with the El Paso de Robles police department. In the event the notice of revocation is mailed, service shall be deemed complete upon deposit in the United States mail. The effective date of the revocation of an alarm system permit shall be fifteen days after the service of a notice of revocation.

(c)

SURRENDER OF LICENSES AND DEACTIVATION OF ALARM SYSTEMS. Whenever the revocation of an alarm system permit becomes effective, the permit shall be surrendered forthwith to the police department and the alarm system shall forthwith be removed or deactivated.

(Ord. 523 N.S. (part), 1986)

5.45.130 - Permit revocation—Appeals.

(a)

FIRST REVOCATION. No new alarm system permit may be issued for a premises within six months following the first revocation of an alarm system permit previously issued for the same premises, unless the premises owner changes or business owner changes, at which time a new permit may be applied for.

(b)

SECOND OR SUBSEQUENT REVOCATIONS. No new alarm system permit may be issued for a premises within one year following the second or subsequent revocation of an alarm system permit previously issued for the same premises unless the premises owner changes or business owner changes, at which time a new permit may be applied for.

(Ord. 523 N.S. (part), 1986)

5.45.140 - Confidentiality.

The information contained in alarm system permit applications and notices of change shall be confidential and shall not be disclosed other than to city employees or other public officials who require such information in the performance of their official duties.

(Ord. 523 N.S. (part), 1986)

5.45.150 - False alarm service fee.

Any person who maintains or has an alarm which has caused any signal, message or alarm to be transmitted to the police department, either by direct telephone or other direct communication, or by communication from an alarm agent, or an alarm business, or by a person responding to an audible alarm, and which is a false alarm, shall pay a false alarm service fee to the city as established by resolution of the city council. Failure to pay a false alarm service fee within thirty days after issuance of invoice by the city shall cause immediate revocation of alarm service permit.

(Ord. 523 N.S. (part), 1986)

5.45.160 - Limitation on liability.

The city is under no obligation of duty to any permittee or any other person by reason of any provision of this chapter, or the exercise of any privilege by any permittee hereunder, including but not limited to any defects in the alarm board at the police department, any delay in transmission of an alarm message to any emergency unit, or damage caused by delay in responding to any alarm by any city officer, employee, or agent.

(Ord. 523 N.S. (part), 1986)

5.45.170 - Criminal penalties.

Any person who violates any provision of this chapter shall be guilty of a misdemeanor, and upon conviction thereof shall be punished by a fine not to exceed five hundred dollars, or imprisonment in the county jail not exceeding six months, or by both.

(Ord. 523 N.S. (part), 1986)

5.45.180 - Application of chapter.

Any person who has established, or uses an alarm system which requires a permit under this chapter shall apply for an alarm system permit as provided in this chapter, within six weeks after the effective date of the ordinance codified in this chapter.

(Ord. 523 N.S. (part), 1986)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Paso Robles Municipal Code
Paso Robles Municipal Code
  1. Title 1 — GENERAL PROVISIONS
  2. Chapter 2.04 — COUNCIL MEETINGS
  3. Chapter 2.20 — PLANNING COMMISSION
  4. Chapter 2.24 — EMERGENCY ORGANIZATION AND FUNCTIONS
  5. Chapter 2.28 — CITY MANAGER
  6. Chapter 2.34 — CITY CLERK
  7. Chapter 2.40 — BONDS AND SALARIES OF OFFICERS
  8. Chapter 2.44 — PERSONNEL PLAN—RULES AND REGULATIONS
  9. Chapter 2.58 — POLICE RESERVES
  10. Chapter 2.60 — POLICE TRAINING
  11. Chapter 2.62 — TRAINING STANDARDS OF PUBLIC SAFETY DISPATCHERS
  12. Chapter 2.65 — ELECTIONS
  13. Title 3 — REVENUE AND FINANCE
  14. Chapter 3.01 — ASSESSMENT, LEVY AND COLLECTION OF TAXES BY COU…
  15. Chapter 3.08 — UNIFORM SALES AND USE TAX
  16. Chapter 3.10 — GENERAL TRANSACTIONS AND USE TAX
  17. Chapter 3.11 — SUPPLEMENTAL TRANSACTIONS AND USE TAX
  18. Chapter 3.12 — SPECIAL GAS TAX STREET IMPROVEMENT FUND
  19. Chapter 3.20 — REAL PROPERTY TRANSFER TAX
  20. Chapter 3.21 — VISUAL ART IN PUBLIC PLACES
  21. Chapter 3.22 — CANNABIS BUSINESS TAX
  22. Chapter 3.26 — TRANSIENT OCCUPANCY TAX
  23. Chapter 3.28 — BUSINESS LICENSE TAX
  24. Chapter 3.30 — DENIAL OR REVOCATION OF A BUSINESS LICENSE TAX …
  25. Title 5 — PERMITS AND REGULATIONS
  26. Chapter 5.02 — PARKING AND BUSINESS IMPROVEMENT AREA
  27. Chapter 5.08 — CARD AND BILLIARD ROOMS
  28. Chapter 5.12 — CLOSING OUT SALES
  29. Chapter 5.28 — PRIVATE PATROL
  30. Chapter 5.36 — SOLICITORS
  31. Chapter 5.38 — MASSAGE THERAPY AND MASSAGE ESTABLISHMENTS
  32. Chapter 5.40 — TAXICABS
  33. Chapter 5.45 — ALARM SYSTEMS
  34. Chapter 5.50 — STATE VIDEO FRANCHISES
  35. Chapter 6.04 — PURCHASING AND PAYMENT PROCEDURES
  36. Chapter 7.12 — FOOD AND DRINK ESTABLISHMENTS
  37. Chapter 7.16 — GARBAGE
  38. Chapter 7.30 — UNDERGROUND STORAGE OF HAZARDOUS SUBSTANCES
  39. Chapter 7.40 — RECYCLING AND ORGANIC WASTE COLLECTION
  40. Chapter 7.50 — CAMPING
  41. Title 8 — ANIMAL CONTROL
  42. Chapter 8.04 — GENERAL
  43. Chapter 9.02 — EMERGENCY REGULATIONS
  44. Chapter 9.03 — HAZARDOUS MATERIALS
  45. Chapter 9.04 — MISCELLANEOUS MISDEMEANORS
  46. Chapter 9.05 — SKATE PARK AND PUMP TRACK FACILITIES
  47. Chapter 9.06 — NUISANCE ABATEMENT
  48. Chapter 9.07 — PROHIBITED CONDUCT
  49. Chapter 9.12 — GAME RESTRICTIONS FOR MINORS—HOURS
  50. Chapter 9.16 — BINGO
  51. Chapter 9.32 — CURFEW
  52. Chapter 9.36 — PINBALL MACHINES
  53. Chapter 9.38 — UNCLAIMED PROPERTY
  54. Chapter 9.40 — ABANDONED VEHICLES
  55. Chapter 9.41 — SMOKING PROHIBITED IN PUBLIC PLACES
  56. Chapter 9.42 — SWIMMING AND WATER SPORTS PROHIBITED IN CERTAIN…
  57. Chapter 9.45 — FILMING ACTIVITIES
  58. Chapter 9.50 — PROHIBITION ON AGGRESSIVE SOLICITATION
  59. Chapter 9.51 — PSYCHOACTIVE HERBAL INCENSE, PSYCHOACTIVE BATH …
  60. Chapter 9.55 — PARKS AND RECREATION
  61. Title 10 — VEGETATION
  62. Chapter 10.01 — OAK TREE PRESERVATION
  63. Chapter 10.04 — STREET TREE PLANTING AND MAINTENANCE
  64. Title 11 — STREETS AND SIDEWALKS
  65. Chapter 11.02 — ALLEYS
  66. Chapter 11.04 — PRECISE STREETS AND HIGHWAY PLAN
  67. Chapter 11.08 — STREET ADDRESSES AND HOUSE NUMBERS
  68. Chapter 11.12 — CONSTRUCTION OF SIDEWALKS, CURBS AND GUTTERS
  69. Chapter 11.20 — STREET EXCAVATIONS
  70. Chapter 11.24 — DISCHARGE OF WASTE WATER INTO STREETS
  71. Article I — Purpose
  72. Article II — Definitions
  73. Article III — Approval of Location Permits
  74. Article IV — General Pushcart Regulations
  75. Article VI — Enforcement
  76. Chapter 11.30 — STREET FURNITURE
  77. Chapter 11.35 — NEWSRACKS
  78. Chapter 11.40 — MODIFICATIONS ON STREET IMPROVEMENT REQUIREMENTS
  79. Chapter 12.04 — DEFINITIONS
  80. Chapter 12.08 — ADMINISTRATION
  81. Chapter 12.12 — ENFORCEMENT
  82. Chapter 12.16 — TRAFFIC CONTROL DEVICES
  83. Chapter 12.18 — TRAFFIC FEES
  84. Chapter 12.19 — BRIDGE DEVELOPMENT FEE
  85. Chapter 12.20 — TURNING MOVEMENTS
  86. Chapter 12.24 — MISCELLANEOUS DRIVING RULES
  87. Chapter 12.28 — PEDESTRIANS
  88. Chapter 12.32 — STOPPING, STANDING AND PARKING
  89. Chapter 12.36 — LOADING AND UNLOADING
  90. Chapter 12.37 — VALET
  91. Chapter 12.38 — PARKING RESTRICTIONS
  92. Chapter 12.43 — RESIDENTIAL PARKING PERMITS
  93. Chapter 12.45 — PARKING BENEFIT DISTRICT
  94. Chapter 12.46 — TRUCK ROUTES
  95. Chapter 12.50 — ONE-WAY TRAFFIC
  96. Chapter 12.54 — SPEED LIMITS
  97. Chapter 12.58 — BICYCLES
  98. Chapter 12.90 — SCHEDULES
  99. Chapter 12.92 — OPERATION OF MOTOR VEHICLES ON PUBLIC PROPERTY
  100. Chapter 13.01 — MUNICIPAL AIRPORT OPERATIONS
  101. Chapter 13.02 — AIRPORT COMMISSION
  102. Title 14 — WATER AND SEWERS
  103. Chapter 14.02 — WATER CONSERVATION AND WATER SHORTAGE CONTINGE…
  104. Chapter 14.04 — WATER RATES AND REGULATIONS
  105. Chapter 14.06 — REGULATION OF WELL CONSTRUCTION, REPAIR, MODIF…
  106. Chapter 14.07 — NON-POTABLE WATER SERVICE
  107. Chapter 14.08 — SEWERAGE SYSTEM OPERATIONS
  108. Article I — General Provisions
  109. Article II — Sewer Connection
  110. Article III — Private Wastewater Systems
  111. Article IV — Violations and Penalties
  112. Chapter 14.10 — SEWER USE
  113. Article I — Purpose and Policy
  114. Article II — Prohibitions and Limits on Discharges
  115. Article III — Hauled Waste
  116. Article IV — Small Winery and Small Brewery Program
  117. Article V — Fats, Oils and Grease Control Program
  118. Article VI — Industrial Wastewater Discharge Permits
  119. Article VII — Pretreatment
  120. Article VIII — Compliance Monitoring
  121. Article IX — Reporting Requirements
  122. Article X — Public Participation
  123. Article XI — Fees, Rates, and Charges
  124. Article XII — Liability and Enforcement
  125. Article XIII — Affirmative Defense to Discharge Violations
  126. Article XIV — Miscellaneous Provisions
  127. Chapter 14.12 — CONNECTIONS TO MAINS WHERE STREETS TO BE IMPRO…
  128. Chapter 14.16 — SEWER CHARGES
  129. Chapter 14.18 — CROSS-CONNECTIONS CONTROL AND INSPECTIONS
  130. Article I — General Provisions
  131. Article II — Prohibitions
  132. Article III — Reduction of Pollutants in Storm Water
  133. Article IV — Construction Activities
  134. Article V — Post-Construction
  135. Article VI — Inspection, Monitoring, and Data Collection
  136. Article VII — Enforcement
  137. Title 15 — PUBLIC UTILITIES
  138. Chapter 15.04 — UNDERGROUND UTILITIES DISTRICTS
  139. Title 16 — FIRE
  140. Chapter 16.04 — FIRE LIMITS
  141. Chapter 16.08 — FIRE DEPARTMENT
  142. Chapter 16.10 — ABATEMENT OF HAZARDOUS FUELS AND RUBBISH
  143. Title 17 — BUILDINGS AND CONSTRUCTION
  144. Chapter 17.04 — UNIFORM CODES
  145. Chapter 17.08 — MOVING BUILDINGS
  146. Chapter 17.12 — SECURITY OF BODIES OF WATER TO BE USED FOR THE…
  147. Chapter 17.16 — DEMOLITION OF BUILDINGS AND STRUCTURES
  148. Chapter 17.18 — AMENDMENTS TO THE CALIFORNIA EXISTING BUILDING…
  149. Chapter 17.20 — SMALL RESIDENTIAL ROOFTOP SOLAR SYSTEMS
  150. Chapter 17.25 — ELECTRIC VEHICLE CHARGING STATIONS
  151. Title 19 — BILLBOARD SIGNS
  152. Chapter 19.01 — PURPOSE AND APPLICABILITY
  153. Chapter 19.02 — REVIEW PROCESS
  154. Chapter 19.03 — ALLOWED LOCATIONS
  155. Chapter 19.04 — DEVELOPMENT STANDARDS FOR BILLBOARDS
  156. Chapter 19.05 — NONCONFORMING BILLBOARDS
  157. Chapter 20.04 — GENERAL PROVISIONS
  158. Chapter 20.08 — DEFINITIONS
  159. Chapter 20.12 — PERMIT REQUIREMENTS
  160. Chapter 20.16 — GRADING REQUIREMENTS
  161. Chapter 20.20 — CONTROL OF DRAINAGE, EROSION AND DUST CONTROL
  162. Chapter 20.24 — VIOLATIONS AND APPEALS
  163. Title 21 — ZONING
  164. Chapter 21.01 — PURPOSE AND APPLICABILITY OF THE ZONING CODE
  165. Chapter 21.02 — INTERPRETATION OF THE ZONING CODE
  166. Chapter 21.03 — ZONING DISTRICTS
  167. Chapter 21.04 — SPECIAL PLANNED DEVELOPMENTS ESTABLISHED
  168. Chapter 21.05 — SPECIFIC PLANS ESTABLISHED
  169. Chapter 21.06 — ZONING MAP
  170. Chapter 21.08 — PLANNING AUTHORITIES
  171. Chapter 21.09 — APPLICATION PROCESSING AND COMMON PROCEDURES
  172. Chapter 21.10 — AMENDMENTS TO THE GENERAL PLAN, ZONING CODE, A…
  173. Chapter 21.11 — SPECIAL PLANNED DEVELOPMENTS (SPD)
  174. Chapter 21.12 — DEVELOPMENT AGREEMENTS
  175. Chapter 21.13 — DEVELOPMENT AGREEMENTS ESTABLISHED
  176. Chapter 21.14 — SPECIFIC PLANS
  177. Chapter 21.15 — DEVELOPMENT REVIEW
  178. Chapter 2.16 — DEVELOPMENT PLANS
  179. Chapter 21.17 — SITE PLANS
  180. Chapter 21.18 — PLOT PLANS
  181. Chapter 21.19 — CONDITIONAL USE PERMITS AND ADMINISTRATIVE USE…
  182. Chapter 21.20 — TEMPORARY USE PERMITS
  183. Chapter 21.21 — HOME OCCUPATION PERMITS
  184. Chapter 21.22 — VARIANCES
  185. Chapter 21.24 — ENTITLEMENT IMPLEMENTATION, EXTENSIONS, AMENDM…
  186. Chapter 21.25 — APPEALS AND CALLS FOR REVIEW
  187. Chapter 21.26 — PUBLIC HEARINGS AND NOTICE
  188. Chapter 21.27 — REASONABLE ACCOMMODATIONS
  189. Chapter 21.32 — LAND USE REGULATIONS IN ZONING DISTRICTS
  190. Chapter 21.33 — RESIDENTIAL ZONING DISTRICTS (R-A, R-1, R-2, R…
  191. Chapter 21.34 — COMMERCIAL, INDUSTRIAL, AND AIRPORT ZONING DIS…
  192. Chapter 21.35 — PUBLIC FACILITIES, PARKS AND OPEN SPACE, OPEN …
  193. Chapter 21.36 — OVERLAY ZONING DISTRICTS (HOS, HP, MU, PD, L, …
  194. Chapter 21.41 — RULES OF MEASUREMENT
  195. Chapter 21.42 — ACCESSORY STRUCTURES
  196. Chapter 21.43 — AWNINGS, CANOPIES, AND PATIO COVERS
  197. Chapter 21.44 — FENCES, WALLS, AND HEDGES
  198. Chapter 21.45 — LANDSCAPING AND OPEN SPACE
  199. Chapter 21.47 — MECHANICAL EQUIPMENT AND SCREENING
  200. Chapter 21.48 — PARKING AND LOADING REGULATIONS
  201. Chapter 21.50 — OBJECTIVE DESIGN STANDARDS FOR MIXED-USE AND M…
  202. Chapter 21.51 — REFUSE AND RECYCLING AREAS
  203. Chapter 21.52 — SIGNS
  204. Chapter 21.53 — SWIMMING POOLS
  205. Chapter 21.54 — UNDERGROUND UTILITIES
  206. Chapter 21.55 — VISIBILITY AT INTERSECTIONS
  207. Chapter 21.56 — WATER EFFICIENT LANDSCAPING
  208. Chapter 21.58 — ACCESSORY DWELLING UNITS
  209. Chapter 21.59 — ADULT BUSINESS USES
  210. Chapter 21.60 — CANNABIS
  211. Chapter 21.61 — DENSITY BONUS
  212. Chapter 21.62 — HISTORIC PRESERVATION
  213. Chapter 21.63 — MURALS
  214. Chapter 21.64 — SHORT-TERM RENTALS
  215. Chapter 21.65 — URBAN DWELLING UNITS
  216. Chapter 21.66 — WIRELESS COMMUNICATIONS FACILITIES
  217. Chapter 21.69 — STANDARDS FOR SPECIFIC LAND USES AND ACTIVITIES
  218. Chapter 21.74 — GENERAL NONCONFORMING PROVISIONS
  219. Chapter 21.75 — NONCONFORMING LOTS
  220. Chapter 21.76 — NONCONFORMING STRUCTURES
  221. Chapter 21.77 — NONCONFORMING USES
  222. Chapter 21.78 — OTHER NONCONFORMING PROVISIONS
  223. Chapter 21.80 — FLOODPLAIN MANAGEMENT
  224. Chapter 21.81 — HILLSIDE DEVELOPMENT
  225. Chapter 21.82 — LIGHTING AND ILLUMINATION
  226. Chapter 21.83 — NOISE
  227. Chapter 21.84 — OAK TREE PRESERVATION
  228. Chapter 21.85 — PERFORMANCE STANDARDS—GENERAL
  229. Chapter 21.86 — SURFACE MINING AND RECLAMATION
  230. Chapter 21.90 — PURPOSE
  231. Chapter 21.91 — LAND USE DEFINITIONS
  232. Chapter 21.92 — GENERAL DEFINITIONS
  233. Title 22 — SUBDIVISIONS
  234. Chapter 22.04 — GENERAL PROVISIONS
  235. Chapter 22.08 — DEFINITIONS
  236. Chapter 22.12 — TENTATIVE MAP
  237. Chapter 22.14 — VESTING TENTATIVE MAP PROCEDURES
  238. Chapter 22.16 — FINAL MAP
  239. Chapter 22.18 — LOT LINE ADJUSTMENT PROCESS
  240. Chapter 22.20 — DESIGN OF IMPROVEMENTS
  241. Chapter 22.24 — CONSTRUCTION OF IMPROVEMENTS
  242. Chapter 22.28 — EXCEPTIONS
  243. Chapter 22.32 — APPEAL
  244. Chapter 22.34 — URBAN LOT SPLITS

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.