Article VIII — Compliance Monitoring
Paso Robles Municipal Code · 2026-09 edition · updated 2026-09-27 · Paso Robles
14.10.460 - Right to inspect and monitor.¶
The director, through a program of inspection and sampling, shall ensure compliance with the provisions of this chapter, the IU's wastewater discharge permit, and all applicable federal and state laws and regulations. The city may inspect the facilities of any person to ascertain whether the purpose of this chapter is being met and all prohibitions, limitations, and requirements are being complied with. Upon presentation of proper identification, persons or occupants of premises where waste or wastewater is created or discharged shall allow the city ready access, at all reasonable times, to all parts of the premises for the purposes of inspection, sampling, records examination, evidence gathering, or in the performance of any of its other duties. In addition, the city may enter an IU's property at any hour under emergency circumstances involving the city's wastewater system.
During inspection and compliance monitoring activities, the city shall observe all reasonable security, safety, and sanitation measures. In addition, the city shall observe reasonable precautionary measures specified by the IU. Where an IU has security measures in force, which would require proper identification and clearance before entry onto the IU's premises, the IU shall make necessary arrangements with its security personnel so that upon presentation of
suitable identification, city personnel will be permitted to enter, without delay, for the purposes of performing their specific responsibilities.
The city may sample the wastewater from any IU or require the IU to sample the wastewater at the IU's own expense to ascertain whether the intent of this chapter is being met and that the IU is complying with all requirements.
The city shall have the right to set up on the IU's property such devices as are necessary to conduct sampling, inspection, compliance monitoring, and/or metering operations.
The director may require the IU to furnish and install, at the IU's own expense, a control manhole in the building sewer or monitoring equipment as necessary and of a design and location approved by the city to facilitate inspection, sampling, and flow measurements. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the IU at its own expense. All devices used to measure wastewater flow and quality shall be calibrated at the frequency described in the industrial wastewater discharge permit to ensure their accuracy. The IU shall provide the city with unrestricted access to the sampling station at all times.
If the city requires or the IU chooses to install monitoring equipment, the equipment shall be calibrated as recommended by the manufacturer and approved by the city. This must be done by qualified personnel. A photocopy of the calibration results and/or certificate shall be sent to the city.
Where pretreatment or monitoring facilities are required before wastewater may be discharged to the sewerage system, detailed plans showing the pretreatment facility and operating procedures shall be submitted to the city for review and shall be approved by the city before the facility is constructed. All such plans and construction shall be done at the IU's expense. The review and approval of such plans and operating procedures will in no way relieve the IU from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the city under the provisions of this chapter, and the IU shall remain responsible for compliance with all applicable ordinances, codes, regulations, and orders of any governmental authority. Any subsequent proposed changes in the pretreatment facilities or methods of operation shall be reported to, and be approved by, the city prior to the IU's implementation of the changes.
Any temporary or permanent obstruction to safe and easy access to the facility that is to be inspected and/or sampled shall be promptly removed by the IU at the written or verbal request of the director and shall not be replaced. The IU shall bear the costs of clearing such access.
Unreasonable delays in allowing the director access to the IU's premises shall be a violation of this section.
(Ord. No. 1105 N.S., § 2 (Exh. A), 12-1-2020)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Paso Robles Municipal Code
- Title 1 — GENERAL PROVISIONS
- Chapter 2.04 — COUNCIL MEETINGS
- Chapter 2.20 — PLANNING COMMISSION
- Chapter 2.24 — EMERGENCY ORGANIZATION AND FUNCTIONS
- Chapter 2.28 — CITY MANAGER
- Chapter 2.34 — CITY CLERK
- Chapter 2.40 — BONDS AND SALARIES OF OFFICERS
- Chapter 2.44 — PERSONNEL PLAN—RULES AND REGULATIONS
- Chapter 2.58 — POLICE RESERVES
- Chapter 2.60 — POLICE TRAINING
- Chapter 2.62 — TRAINING STANDARDS OF PUBLIC SAFETY DISPATCHERS
- Chapter 2.65 — ELECTIONS
- Title 3 — REVENUE AND FINANCE
- Chapter 3.01 — ASSESSMENT, LEVY AND COLLECTION OF TAXES BY COU…
- Chapter 3.08 — UNIFORM SALES AND USE TAX
- Chapter 3.10 — GENERAL TRANSACTIONS AND USE TAX
- Chapter 3.11 — SUPPLEMENTAL TRANSACTIONS AND USE TAX
- Chapter 3.12 — SPECIAL GAS TAX STREET IMPROVEMENT FUND
- Chapter 3.20 — REAL PROPERTY TRANSFER TAX
- Chapter 3.21 — VISUAL ART IN PUBLIC PLACES
- Chapter 3.22 — CANNABIS BUSINESS TAX
- Chapter 3.26 — TRANSIENT OCCUPANCY TAX
- Chapter 3.28 — BUSINESS LICENSE TAX
- Chapter 3.30 — DENIAL OR REVOCATION OF A BUSINESS LICENSE TAX …
- Title 5 — PERMITS AND REGULATIONS
- Chapter 5.02 — PARKING AND BUSINESS IMPROVEMENT AREA
- Chapter 5.08 — CARD AND BILLIARD ROOMS
- Chapter 5.12 — CLOSING OUT SALES
- Chapter 5.28 — PRIVATE PATROL
- Chapter 5.36 — SOLICITORS
- Chapter 5.38 — MASSAGE THERAPY AND MASSAGE ESTABLISHMENTS
- Chapter 5.40 — TAXICABS
- Chapter 5.45 — ALARM SYSTEMS
- Chapter 5.50 — STATE VIDEO FRANCHISES
- Chapter 6.04 — PURCHASING AND PAYMENT PROCEDURES
- Chapter 7.12 — FOOD AND DRINK ESTABLISHMENTS
- Chapter 7.16 — GARBAGE
- Chapter 7.30 — UNDERGROUND STORAGE OF HAZARDOUS SUBSTANCES
- Chapter 7.40 — RECYCLING AND ORGANIC WASTE COLLECTION
- Chapter 7.50 — CAMPING
- Title 8 — ANIMAL CONTROL
- Chapter 8.04 — GENERAL
- Chapter 9.02 — EMERGENCY REGULATIONS
- Chapter 9.03 — HAZARDOUS MATERIALS
- Chapter 9.04 — MISCELLANEOUS MISDEMEANORS
- Chapter 9.05 — SKATE PARK AND PUMP TRACK FACILITIES
- Chapter 9.06 — NUISANCE ABATEMENT
- Chapter 9.07 — PROHIBITED CONDUCT
- Chapter 9.12 — GAME RESTRICTIONS FOR MINORS—HOURS
- Chapter 9.16 — BINGO
- Chapter 9.32 — CURFEW
- Chapter 9.36 — PINBALL MACHINES
- Chapter 9.38 — UNCLAIMED PROPERTY
- Chapter 9.40 — ABANDONED VEHICLES
- Chapter 9.41 — SMOKING PROHIBITED IN PUBLIC PLACES
- Chapter 9.42 — SWIMMING AND WATER SPORTS PROHIBITED IN CERTAIN…
- Chapter 9.45 — FILMING ACTIVITIES
- Chapter 9.50 — PROHIBITION ON AGGRESSIVE SOLICITATION
- Chapter 9.51 — PSYCHOACTIVE HERBAL INCENSE, PSYCHOACTIVE BATH …
- Chapter 9.55 — PARKS AND RECREATION
- Title 10 — VEGETATION
- Chapter 10.01 — OAK TREE PRESERVATION
- Chapter 10.04 — STREET TREE PLANTING AND MAINTENANCE
- Title 11 — STREETS AND SIDEWALKS
- Chapter 11.02 — ALLEYS
- Chapter 11.04 — PRECISE STREETS AND HIGHWAY PLAN
- Chapter 11.08 — STREET ADDRESSES AND HOUSE NUMBERS
- Chapter 11.12 — CONSTRUCTION OF SIDEWALKS, CURBS AND GUTTERS
- Chapter 11.20 — STREET EXCAVATIONS
- Chapter 11.24 — DISCHARGE OF WASTE WATER INTO STREETS
- Article I — Purpose
- Article II — Definitions
- Article III — Approval of Location Permits
- Article IV — General Pushcart Regulations
- Article VI — Enforcement
- Chapter 11.30 — STREET FURNITURE
- Chapter 11.35 — NEWSRACKS
- Chapter 11.40 — MODIFICATIONS ON STREET IMPROVEMENT REQUIREMENTS
- Chapter 12.04 — DEFINITIONS
- Chapter 12.08 — ADMINISTRATION
- Chapter 12.12 — ENFORCEMENT
- Chapter 12.16 — TRAFFIC CONTROL DEVICES
- Chapter 12.18 — TRAFFIC FEES
- Chapter 12.19 — BRIDGE DEVELOPMENT FEE
- Chapter 12.20 — TURNING MOVEMENTS
- Chapter 12.24 — MISCELLANEOUS DRIVING RULES
- Chapter 12.28 — PEDESTRIANS
- Chapter 12.32 — STOPPING, STANDING AND PARKING
- Chapter 12.36 — LOADING AND UNLOADING
- Chapter 12.37 — VALET
- Chapter 12.38 — PARKING RESTRICTIONS
- Chapter 12.43 — RESIDENTIAL PARKING PERMITS
- Chapter 12.45 — PARKING BENEFIT DISTRICT
- Chapter 12.46 — TRUCK ROUTES
- Chapter 12.50 — ONE-WAY TRAFFIC
- Chapter 12.54 — SPEED LIMITS
- Chapter 12.58 — BICYCLES
- Chapter 12.90 — SCHEDULES
- Chapter 12.92 — OPERATION OF MOTOR VEHICLES ON PUBLIC PROPERTY
- Chapter 13.01 — MUNICIPAL AIRPORT OPERATIONS
- Chapter 13.02 — AIRPORT COMMISSION
- Title 14 — WATER AND SEWERS
- Chapter 14.02 — WATER CONSERVATION AND WATER SHORTAGE CONTINGE…
- Chapter 14.04 — WATER RATES AND REGULATIONS
- Chapter 14.06 — REGULATION OF WELL CONSTRUCTION, REPAIR, MODIF…
- Chapter 14.07 — NON-POTABLE WATER SERVICE
- Chapter 14.08 — SEWERAGE SYSTEM OPERATIONS
- Article I — General Provisions
- Article II — Sewer Connection
- Article III — Private Wastewater Systems
- Article IV — Violations and Penalties
- Chapter 14.10 — SEWER USE
- Article I — Purpose and Policy
- Article II — Prohibitions and Limits on Discharges
- Article III — Hauled Waste
- Article IV — Small Winery and Small Brewery Program
- Article V — Fats, Oils and Grease Control Program
- Article VI — Industrial Wastewater Discharge Permits
- Article VII — Pretreatment
- Article VIII — Compliance Monitoring
- Article IX — Reporting Requirements
- Article X — Public Participation
- Article XI — Fees, Rates, and Charges
- Article XII — Liability and Enforcement
- Article XIII — Affirmative Defense to Discharge Violations
- Article XIV — Miscellaneous Provisions
- Chapter 14.12 — CONNECTIONS TO MAINS WHERE STREETS TO BE IMPRO…
- Chapter 14.16 — SEWER CHARGES
- Chapter 14.18 — CROSS-CONNECTIONS CONTROL AND INSPECTIONS
- Article I — General Provisions
- Article II — Prohibitions
- Article III — Reduction of Pollutants in Storm Water
- Article IV — Construction Activities
- Article V — Post-Construction
- Article VI — Inspection, Monitoring, and Data Collection
- Article VII — Enforcement
- Title 15 — PUBLIC UTILITIES
- Chapter 15.04 — UNDERGROUND UTILITIES DISTRICTS
- Title 16 — FIRE
- Chapter 16.04 — FIRE LIMITS
- Chapter 16.08 — FIRE DEPARTMENT
- Chapter 16.10 — ABATEMENT OF HAZARDOUS FUELS AND RUBBISH
- Title 17 — BUILDINGS AND CONSTRUCTION
- Chapter 17.04 — UNIFORM CODES
- Chapter 17.08 — MOVING BUILDINGS
- Chapter 17.12 — SECURITY OF BODIES OF WATER TO BE USED FOR THE…
- Chapter 17.16 — DEMOLITION OF BUILDINGS AND STRUCTURES
- Chapter 17.18 — AMENDMENTS TO THE CALIFORNIA EXISTING BUILDING…
- Chapter 17.20 — SMALL RESIDENTIAL ROOFTOP SOLAR SYSTEMS
- Chapter 17.25 — ELECTRIC VEHICLE CHARGING STATIONS
- Title 19 — BILLBOARD SIGNS
- Chapter 19.01 — PURPOSE AND APPLICABILITY
- Chapter 19.02 — REVIEW PROCESS
- Chapter 19.03 — ALLOWED LOCATIONS
- Chapter 19.04 — DEVELOPMENT STANDARDS FOR BILLBOARDS
- Chapter 19.05 — NONCONFORMING BILLBOARDS
- Chapter 20.04 — GENERAL PROVISIONS
- Chapter 20.08 — DEFINITIONS
- Chapter 20.12 — PERMIT REQUIREMENTS
- Chapter 20.16 — GRADING REQUIREMENTS
- Chapter 20.20 — CONTROL OF DRAINAGE, EROSION AND DUST CONTROL
- Chapter 20.24 — VIOLATIONS AND APPEALS
- Title 21 — ZONING
- Chapter 21.01 — PURPOSE AND APPLICABILITY OF THE ZONING CODE
- Chapter 21.02 — INTERPRETATION OF THE ZONING CODE
- Chapter 21.03 — ZONING DISTRICTS
- Chapter 21.04 — SPECIAL PLANNED DEVELOPMENTS ESTABLISHED
- Chapter 21.05 — SPECIFIC PLANS ESTABLISHED
- Chapter 21.06 — ZONING MAP
- Chapter 21.08 — PLANNING AUTHORITIES
- Chapter 21.09 — APPLICATION PROCESSING AND COMMON PROCEDURES
- Chapter 21.10 — AMENDMENTS TO THE GENERAL PLAN, ZONING CODE, A…
- Chapter 21.11 — SPECIAL PLANNED DEVELOPMENTS (SPD)
- Chapter 21.12 — DEVELOPMENT AGREEMENTS
- Chapter 21.13 — DEVELOPMENT AGREEMENTS ESTABLISHED
- Chapter 21.14 — SPECIFIC PLANS
- Chapter 21.15 — DEVELOPMENT REVIEW
- Chapter 2.16 — DEVELOPMENT PLANS
- Chapter 21.17 — SITE PLANS
- Chapter 21.18 — PLOT PLANS
- Chapter 21.19 — CONDITIONAL USE PERMITS AND ADMINISTRATIVE USE…
- Chapter 21.20 — TEMPORARY USE PERMITS
- Chapter 21.21 — HOME OCCUPATION PERMITS
- Chapter 21.22 — VARIANCES
- Chapter 21.24 — ENTITLEMENT IMPLEMENTATION, EXTENSIONS, AMENDM…
- Chapter 21.25 — APPEALS AND CALLS FOR REVIEW
- Chapter 21.26 — PUBLIC HEARINGS AND NOTICE
- Chapter 21.27 — REASONABLE ACCOMMODATIONS
- Chapter 21.32 — LAND USE REGULATIONS IN ZONING DISTRICTS
- Chapter 21.33 — RESIDENTIAL ZONING DISTRICTS (R-A, R-1, R-2, R…
- Chapter 21.34 — COMMERCIAL, INDUSTRIAL, AND AIRPORT ZONING DIS…
- Chapter 21.35 — PUBLIC FACILITIES, PARKS AND OPEN SPACE, OPEN …
- Chapter 21.36 — OVERLAY ZONING DISTRICTS (HOS, HP, MU, PD, L, …
- Chapter 21.41 — RULES OF MEASUREMENT
- Chapter 21.42 — ACCESSORY STRUCTURES
- Chapter 21.43 — AWNINGS, CANOPIES, AND PATIO COVERS
- Chapter 21.44 — FENCES, WALLS, AND HEDGES
- Chapter 21.45 — LANDSCAPING AND OPEN SPACE
- Chapter 21.47 — MECHANICAL EQUIPMENT AND SCREENING
- Chapter 21.48 — PARKING AND LOADING REGULATIONS
- Chapter 21.50 — OBJECTIVE DESIGN STANDARDS FOR MIXED-USE AND M…
- Chapter 21.51 — REFUSE AND RECYCLING AREAS
- Chapter 21.52 — SIGNS
- Chapter 21.53 — SWIMMING POOLS
- Chapter 21.54 — UNDERGROUND UTILITIES
- Chapter 21.55 — VISIBILITY AT INTERSECTIONS
- Chapter 21.56 — WATER EFFICIENT LANDSCAPING
- Chapter 21.58 — ACCESSORY DWELLING UNITS
- Chapter 21.59 — ADULT BUSINESS USES
- Chapter 21.60 — CANNABIS
- Chapter 21.61 — DENSITY BONUS
- Chapter 21.62 — HISTORIC PRESERVATION
- Chapter 21.63 — MURALS
- Chapter 21.64 — SHORT-TERM RENTALS
- Chapter 21.65 — URBAN DWELLING UNITS
- Chapter 21.66 — WIRELESS COMMUNICATIONS FACILITIES
- Chapter 21.69 — STANDARDS FOR SPECIFIC LAND USES AND ACTIVITIES
- Chapter 21.74 — GENERAL NONCONFORMING PROVISIONS
- Chapter 21.75 — NONCONFORMING LOTS
- Chapter 21.76 — NONCONFORMING STRUCTURES
- Chapter 21.77 — NONCONFORMING USES
- Chapter 21.78 — OTHER NONCONFORMING PROVISIONS
- Chapter 21.80 — FLOODPLAIN MANAGEMENT
- Chapter 21.81 — HILLSIDE DEVELOPMENT
- Chapter 21.82 — LIGHTING AND ILLUMINATION
- Chapter 21.83 — NOISE
- Chapter 21.84 — OAK TREE PRESERVATION
- Chapter 21.85 — PERFORMANCE STANDARDS—GENERAL
- Chapter 21.86 — SURFACE MINING AND RECLAMATION
- Chapter 21.90 — PURPOSE
- Chapter 21.91 — LAND USE DEFINITIONS
- Chapter 21.92 — GENERAL DEFINITIONS
- Title 22 — SUBDIVISIONS
- Chapter 22.04 — GENERAL PROVISIONS
- Chapter 22.08 — DEFINITIONS
- Chapter 22.12 — TENTATIVE MAP
- Chapter 22.14 — VESTING TENTATIVE MAP PROCEDURES
- Chapter 22.16 — FINAL MAP
- Chapter 22.18 — LOT LINE ADJUSTMENT PROCESS
- Chapter 22.20 — DESIGN OF IMPROVEMENTS
- Chapter 22.24 — CONSTRUCTION OF IMPROVEMENTS
- Chapter 22.28 — EXCEPTIONS
- Chapter 22.32 — APPEAL
- Chapter 22.34 — URBAN LOT SPLITS