Skip to content

Earlier editions: 2026-09

APPENDIX›ORDINANCES›ORDINANCE NO. 50

Moraga Municipal Code § 6 UPC Sec. 318, inspection and testing

Moraga Municipal Code · 2026-10 edition · updated 2026-10-04 · Moraga

Cite as: Moraga Municipal Code Section 6 · Text as of 2026-10-04

UPC Section 318 is amended by changing subsections (b) and (c), and adding subsection (j), to read:

"(b) Advance notice - The person doing the work authorized by permit shall notify the Administrative Authority orally or in writing that said work is ready for inspection. Such notification shall be given at least one Department working day before the work is to be inspected."

"(c) Responsibility - The person doing the work shall make sure that the work will stand the test prescribed before giving the notification."

"(j) Bathtub shall be set, shower pan installed, floor flange for water closet installed, backing for fixtures installed, and all water piping strapped and backed before framing inspection."

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Moraga Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.