Skip to content

Earlier editions: 2026-09

Title 9 — PUBLIC SERVICES AND PUBLIC PLACES›Chapter 9.20 — SEWER SYSTEM

Montclair Municipal Code Art. V Sewer Construction Permits

Montclair Municipal Code · 2026-10 edition · updated 2026-10-04 · Montclair

Cite as: Montclair Municipal Code Article V · Text as of 2026-10-04

9.20.230 - Construction permit required.

No person shall commence, do, construct, use or alter, or cause to be commenced, done, constructed, used or altered, any public sewer, main line sewer, building lateral, building sewer, or other appurtenance to the City sewer system without first obtaining a construction permit from the City to do so. All such work performed pursuant to such permit shall be constructed by a licensed contractor.

(Ord. 99-791 Exh. A (part); prior code § 6-6.601)

Exceptions & meaning →

9.20.240 - Permits not transferable.

Permits issued pursuant to the provisions of this article shall not be transferable from one person to another person or from one location to another location.

(Ord. 99-791 Exh. A (part); prior code § 6-6.602)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Montclair Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.