Maywood Zoning Code § 4025.50 Project Review Procedures for Density Bonus
Maywood Zoning Code · 2026-06 edition · updated 2026-09-09 · Maywood
Cite as: Maywood Zoning Code § 4025.50 · Text as of 2026-09-09
- A. All project applications for which a density bonus is being requested shall be subject to the following project review procedures.
A pre-application meeting shall be held between the project developer and the Building and Planning Director, or his designee. The purpose of the meeting will be to review any preliminary development plans prepared by the developer and to discuss the additional project incentives the City will offer the developer.
In the event the developer requests a waiver or modification of zoning standards required under Section 4010 [Residential (R-3)] of this
MAYWOOD ZONING ORDINANCE
87
APRIL 28, 2009
Ordinance, the developer shall be required to show that the waiver or modification is necessary to make the housing units economically feasible.
- Following the pre-application meeting, the developer shall submit the type of application ordinarily required for the type of project proposed (for
example, a site plan for a multi-family residential development), and the project shall be subject to those applicable review procedures.
- B. No special application for the density bonus shall be required. However, in the project record, the Building and Planning Department shall note that a density bonus has been granted, and the approved plans and application shall identify concessions granted and any special conditions imposed on the project to insure unit affordability.
Get a plain-English answer with a citation back to this text.
Ask AI about this code