SECTION 25.51 MEASUREMENTS
Fairfield Zoning Code · 2026-06 edition · updated 2026-07-25 · Fairfield
Sections:
25.51.1 Purpose 25.51.2 Rounding Fractions 25.51.3 Measuring Distances 25.51.4 Measuring Parcels
25.51.5 Measuring Height
25.51.6 Measuring Building Transparency
25.51.1 Purpose ¶
This Section explains how to calculate results and determine various measurements referenced in this Zoning Ordinance.
25.51.2 Rounding Fractions ¶
When calculations result in a fraction, the result shall be rounded to the next whole number according to this Section. Setback distances are stated as absolute values and will in no case be rounded to the next whole number.
A. Minimum requirements. When a regulation is expressed in terms of a minimum requirement, any fractional result will be rounded up to the next consecutive whole number. For example, if a minimum requirement for one street tree for every 40 feet is applied to a 100 foot strip, the resulting fraction of 2.5 is rounded up to three required trees.
B. Maximum requirements. When a regulation is expressed in terms of maximum limits, any fractional result lower than .49 will be down to the next lower whole number. For example, if a maximum height for a building is 35 feet and the building actually measures 35 ’-5", then the height is in compliance. If the height measured 35’-6", then the height limit is not in compliance.
C. Residential density. When calculating residential density, any fractional result shall be rounded up to the next consecutive whole number. For example, if a maximum limit of 15 dwelling units per acre (du/a) is applied to a 5.3-acre site, the resulting quantity of 79.5 is rounded up to 80 permitted dwelling units. Nothing in this section shall conflict with Planning Commission Resolution 93-7(b).
25.51.3 Measuring Distances ¶
A. Distances are measured horizontally. When determining distances for setbacks and structural dimensions, all distances are measured along a horizontal plane from the appropriate line, wall plane or edge of a structure, storage area, parking area, or other object. These distances are not measured by following the topography of the land (see Figure 25-9: Measuring Horizontal Distances). Measurements involving a structure are made at the closest wall of the structure. Other regulated by this ordinance are included in the measurement. See Section 25.30.6 (Exceptions to Height and Setback Requirements).
Figure 25- 10: Measuring Horizontal Distan
==> picture [396 x 122] intentionally omitted <==
ce
B. Measurements are shortest distance. When measuring a required distance, such as the minimum distance between a structure and a property line, the measurement is made at the closest or shortest distance between the two objects. An exception is stated in subsection (C). When the distance being is measured is between two land uses, the minimum distance measurement shall be from property line to property line, with the exception of measurements between adult businesses, as identified in Section.25.32.2 (D)(3).
C. Measurement of vehicle stacking or travel areas. Measurement of a minimum travel distance for vehicles stacking lane distances, are measured down the center of the vehicle travel area except where provided in the Zoning Ordinance. For example, travel lanes are measured along center line the arc of the driveway or traffic lane.
25.51.4 Measuring parcels ¶
A. Coverage. Lot coverage is composed by the total of all horizontal areas occupied by structures as regulated by the Zoning Ordinance. Any deck or platform structure over 30 inches in height is included in the measurement. See Section 25.30.6 (Exceptions to Height Limits and Setback Requirements) and Section 25.25.10.6 (Exemptions from Zoning Ordinance Requirements).
B. Depth. Lot depth is measured using the least restrictive of one the following methods (see Figure 25-10: Measuring Lot Depth below):
The distance from the midpoint of the front property line and the midpoint of the rear property line; or
When the rear property line is formed by two or more lines, the measurement shall be from the midpoint of a line formed by connecting the midpoints of the side-most rear property lines to the front property line.
Where no rear property line is apparent, the rear lot line shall be a line 10 feet in length within the lot, parallel to and at the maximum distance from the front property line.
When lot depth is unable to be determined using the prescribed methods, the Director shall determine the most reasonable determination.
==> picture [397 x 260] intentionally omitted <==
Figure 25-11: Depth
Measuring Lot
- C. Frontage. Frontage shall be measured according to the following applicable methods:
Frontage, Building. The lineal length of any portion of a building facing any street or common parking area.
Frontage, Residential Parcel. The horizontal measurement of, or tangent to, the midpoint of the front property line extending to the side property lines or except as follows:
a. Flag Parcel. For a parcel with a fee ownership extending from a street or right-of-way to the building area of the parcel, the measurement shall be taken from the adjacent side with the smaller dimension.
b. Corner Parcels. For corner lots, all sides abutting a street is considered frontage. The front of the parcel is the side with the smaller dimension.
D. Width. The horizontal measurement of a line formed at the front setback distance required by the applicable zoning district, extending to the side property lines. In residential districts, the measurement is taken 25 feet from the front property line or the front setback to a garage, whichever width is greater.
E. Maximum Coverage of Required Rear Yard. The coverage for additions and accessory buildings is calculated using the following method:
- Calculations. If the rear yard setback is 20 feet on a lot measuring 60 feet by 100 feet, then the lot requires a rear yard area of 1,200 square feet. Therefore, the maximum coverage of the rear yard area for additions is 20 percent of the required rear yard area which is (.20 x 1,200) = 240 square feet. See the example provided in Figure 25-11: Rear Yard Coverage.
==> picture [396 x 193] intentionally omitted <==
Figure 25-12: Rear Yard
Coverage
25.51.5 Measuring Height ¶
A. Buildings. Building height shall be measured plumb from the highest structural part of a building (not including a chimney) to the building’s finish grade. For buildings with basements, the measurement shall be measured plumb to the point where finish grade would have existed had the basement not been installed.
==> picture [396 x 123] intentionally omitted <==
Figure 25-13: Building Height
- B. Other Structures. Specific measurements provisions are provided below.
Retaining Walls and Fences. Walls and fences on top of retaining walls are measured from the ground level on the higher side of the retaining wall.
Decks. Deck height is determined by measuring at any point along the slope directly beneath the platform to the top of the walking surface of the deck. The height of a roof or similar overhead structure for a deck is measured according to paragraph (A).
25.51.6 Measuring Building Transparency ¶
A. Building Transparency. Building transparency shall be the percentage of the vertical surface area of ground floor and upper floor walls along the building frontage that is constructed with transparent materials, measured from finished floor to finished ceiling. This includes windows, transparent glazing, transoms, and doors.
==> picture [295 x 170] intentionally omitted <==
Figure 25-14: Building Transparency
(Ord. No. 2025-01, § 15.)
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
The Fairfield Municipal Code is current through Ordinance 2026-02, passed February 17, 2026.
Disclaimer: The City Clerk has the official version of the Fairfield Municipal Code. Users should contact the City Clerk for ordinances d b t t th di it d
Fairfield2529.html
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
Article III. Subdivision Rules and Regulations.
Editor's Note: This article consists of the subdivision rules and regulations ordinance (Ord. No. 75-8). It is carried in this article exactly as passed; except that a uniform system of capitalization has been used; and except, that section numbers have been changed to conform to the style of the remainder of the chapter
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
The Fairfield Municipal Code is current through Ordinance 2026-02, passed February 17, 2026.
Disclaimer: The City Clerk has the official version of the Fairfield Municipal Code. Users should contact the City Clerk for ordinances d b t t th di it d
Fairfield2530.html
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
==> picture [34 x 16] intentionally omitted <==
Division 1. General Provisions
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — Fairfield Zoning Code
- SECTION 25.10 ORDINANCE PURPOSE AND EFFECT
- § 25.12
- § 25.20
- SECTION 25.22 COMMERCIAL ZONING DISTRICTS
- § 25.23
- SECTION 25.24 INDUSTRIAL ZONING DISTRICTS
- SECTION 25.26 AGRICULTURE AND PUBLIC BENEFIT ZONING DISTRICTS
- SECTION 25.28 OVERLAY ZONING DISTRICTS
- § 25.30
- SECTION 25.32 SPECIFIC USE REGULATIONS
- SECTION 25.33 WIRELESS TELECOMMUNICATIONS FACILITIES
- SECTION 25.34 PARKING AND LOADING
- SECTION 25.36 TREE CONSERVATION
- § 25.38
- SECTION 25.40 PERMITS
- SECTION 25.41 APPLICATION FILING, PROCESSING, AND APPROVAL
- SECTION 25.42 PERMIT IMPLEMENTATION
- SECTION 25.43 PUBLIC HEARINGS
- SECTION 25.44 APPEALS AND CALLS FOR REVIEW
- SECTION 25.45 INTERPRETATIONS
- § 25.46
- SECTION 25.47 GENERAL PLAN AND ZONING AMENDMENTS
- SECTION 25.48 SPECIFIC PLANS
- SECTION 25.49 PLANNING AREAS
- § 25.50
- SECTION 25.51 MEASUREMENTS
- 25.116 Authority.
- 25.117 Purpose.
- 25.118 Considerations - General plan. specific plan. and zonin…
- 25.119 Environmental impact report process.
- 25.120 Existing conditions.
- 25.121 Community facilities.
- 25.122 General responsibilities.
- 25.123 Definitions.
- 25.124 Minor subdivision - Filing procedure tentative parcel m…
- 25.125 Relationship to the EIR process.
- 25.126 Filing fee.
- 25.127 Information required on tentative parcel map.
- 25.128 Distribution.
- 25.129 Authority of the director of planninq and development.
- 25.130 Action of the director of planninq and development.
- 25.131 Requirements which may be imposed.
- 25.132 Appeal to planning commission or city council.
- 25.133 Time for filinq parcel map.
- 25.134 Approval of tentative parcel map.
- 25.135 Form and title of parcel map.
- 25.136 Certificates.
- 25.137 Survey requirements.
- 25.138 Basis of bearings.
- 25.139 Dedications.
- 25.140 Recordinq of parcel map.
- 25.141 Waiver of requirement for recordinq of parcel map.
- 25.146 Relationship to EIR process.
- 25.147 Filinq procedure.
- 25.148 Filing fee.
- 25.149 Distribution
- 25.150 Design and Development Review.
- 25.151 Planning Commission action.
- 25.152 Approval period for tentative maps - Time extension.
- 25.153 Preparation of tentative map.
- 25.154 Scale.
- 25.155 Dimension.
- 25.156 Information required on tentative map.
- 25.157 Street names.
- 25.158 Exception from requirements of this article.
- 25.159 Final map - Filing procedure.
- 25.160 Checking fee.
- 25.161 Content and form of final maps.
- 25.162 Documents to be filed with final map.
- 25.163 Inspection costs.
- 25.164 Department approvals.
- 25.165 Improvement agreement.
- 25.166 Improvement security.
- 25.167 Findings and Intent.
- 25.168 Definitions.
- 25.169 Applicability and Effect.
- 25.170 Applications, Documents, Plans and Information to be Su…
- 25.171 Specific Requirements for the Approval of Tentative Maps.
- 25.172 Tenant Assistance Plan, Required Information at Time of…
- 25.173 Tenant Assistance Plan.
- 25.174 Agreement for Tenant Assistance.
- 25.175 Release of Security.
- 25.176 Special Agreements with Tenants.
- 25.177 Approval of Final Map: Declaration.
- 25.178 Approval of Final Map: Findings.
- 25.179 Tenant Identification.
- 25.180 Waivers - When Permitted.
- 25.181 Procedure.
- 25.182 Timing.
- 25.183 Declaration of Covenants, Conditions and Restrictions.
- 25.184 Rental Housing Shortage: Findings and Vacancy Factors.
- 25.185 Application Procedures - Preliminary and Final Applicat…
- 25.186 Discretionary Approval/Disapproval.
- 25.187 Conditions.
- 25.188 Filing of Final Tentative Map Applications and Waivers.
- 25.189 Relationship to Other Laws.
- 25.190 Severability.
- 25.191 - 25.217 Reserved for future legislation.
- 25.237 Purpose
- 25.238 Scope
- 25.239 Relationship to the EIR process.
- 25.240 Permits required.
- 25.241 Hazards.
- 25.242 Definitions.
- 25.243 Gradinq permit requirements.
- 25.244 Fees.
- 25.245 Bonds.
- 25.246 Grading.
- 25.247 Erosion control.
- 25.248 Grading inspection.
- 25.249 Completion of work.
- 25.250 Runoff Control.
- 25.251 Repeal.
- 25.301 Title.
- 25.302 Authority.
- 25.303 Purpose.
- 25.304 Regulations.
- 25.305 General plan.
- 25.401 Conditions of overcrowding.
- 25.402 Decision-making body.
- 25.403 Dwelling unit.
- 25.404 Reasonable methods for mitigating conditions of overcro…
- 25.405 Residential development.
- 25.501 Findings and notice.
- 25.502 Findings - Requirement.
- 25.503 Concurrence by city.
- 25.504 Findings for development approval.
- 25.601 Payment of fees, dedication of land.
- 25.602 Payment of fees in small residential developments.
- 25.603 Standards for fees or land.
- 25.604 Amount of fees or land.
- 25.701 Fee required.
- 25.702 Land dedication.
- 25.703 Refunds.
- 25.704 School district schedule.
- 25.801 Use of fees and lands.
- 25.802 Agreement for fee distribution.
- 25.803 Account.
- 25.804 Termination of dedication or fee requirements.
- 25.900 Purpose.
- 25.901 Applicability
- 25.902 Definitions
- 25.903 Creekside regulation.
- 25.1301 Purpose
- 25.1302 Applicability
- 25.1303 Sign Approvals
- 25.1304 Regulations for On-Site Signs
- 25.1305 Requirement for Sign to Disclose Public Facilities and…
- 25.1306 Exceptions
- 25.1307 Sign Polices Adopted By Resolution
- 25.1308 Special Sign Districts
- 25.1309 Prohibited Signs
- 25.1310 Measurement of Sign Area and Height
- 25.1311 Nonconforming Signs
- 25.1312 Inventory and Abatement
- 25.1313 Definitions.
- 25.1401 Purpose.
- 25.1402 Definitions.
- 25.1403 Noise Standards.
- 25.1404 Specific Prohibitions
- 25.1405 Exemptions.
- 25.1406 Noise Standards for New Development Projects.
- 25.1407 Non-transportation Noise.
- 25.1408 Ground Transportation.
- 25.1409 Special Standards for Residential Development Near the…
- 25.1410 Special Standards for New Mixed Use Projects
- 25.1411 Aircraft Noise
- 25.1412 Acoustical Analysis
- 25.1413 Enforcement
- 25.1501 Findings and intent.
- 25.1502 Purpose.
- 25.1503 Definitions.
- 25.1504 Establishment of City-wide development impact fees.
- 25.1505 Establishment of northeast area development impact fees.
- 25.1506 Payment of fees.
- 25.1507 Credits.
- 25.1508 Annual Findings.
- 25.1509 Review of Thirty Year Capital Construction Program.
- 25.1510 Administrative Review Procedure.
- 25.1511 Appeal to City Manager.
- 25.1901 Purpose.
- 25.1902 Definitions.
- 25.1903 Inventory of Historic Resources.
- 25.1904 Designation of Historic Landmarks.
- 25.1905 Benefits Available to Historic Landmarks.
- 25.1906 Historic Districts.
- 25.1907 Permits for Changes to Designated Historic Landmarks.
- 25.1908 Demolition or Removal of Structures Included on invent…