Skip to content

25.243 Gradinq permit requirements.

Fairfield Zoning Code · 2026-06 edition · updated 2026-07-25 · Fairfield

(a) Permits required. Except as exempted in sec. 4 [sec. 25.240] of this article, no person shall do any grading without first obtaining a grading permit from the city engineer. A separate permit shall be required for each site and may cover both excavations and fills.

(b) Application. To obtain a permit, the applicant shall first file an application therefor in writing on a form furnished for that purpose. Every such application shall:

(1) Identify and describe the work to be covered by the permit for which application is made;

(2) Describe the land on which the proposed work is to be done, by lot, block, tract, and house and street address, or similar description that will readily identify and definitely locate the proposed building or work;

  • (3) Indicate the quantities of work involved;

  • (4) State the valuation of the proposed work;

  • (5) Be signed by the permittee, or his authorized agent, who may be required to submit evidence to indicate such authority;

  • (6) Give such other information as reasonably may be required by the city engineer.

(c) Plans and specifications. When required by the city engineer, each application for a grading permit shall be accompanied by two sets of plans and specifications, and supporting data consisting of a soil engineering report and engineering geology report. The plans and specifications shall be prepared and signed by a civil engineer when required by the city engineer.

(d) Information on plans and in specifications. Plans shall be drawn to scale upon substantial paper or cloth and shall be of sufficient clarity to indicate the nature and extent of the work proposed and show in detail that they will conform to the provisions of this section and all relevant laws, ordinances, rules and regulations. The first sheet of each set of plans shall give the location of the work and the name and address of the owner and the person by whom they were prepared. The plans shall include the following information:

  • (1) General vicinity of the proposed site;

  • (2) Property limits and accurate contours of existing ground and details of terrain and area drainage;

(3) Limiting dimensions, elevations or finish contours to be achieved by the grading, and proposed drainage channels and related construction.

(4) Detailed plans of all surface and subsurface drainage devices, walls, cribbing, dams and other protective devices to be constructed with, or as a part of, the proposed work together with a map showing the drainage area and the estimated runoff of the area served by any drains.

(5) Location of any buildings or structures on the property where the work is to be performed and the location of any buildings or structures on land of adjacent owners which are within 15 feet of the property which may be affected by the proposed grading operations.

(6) An erosion, sediment, and runoff control plan which indicates necessary land treatment, structural measures and timing requirements which will effectively minimize soil erosion, sedimentation, and rate of water runoff.

Specifications shall contain information covering construction and material requirements.

(e) Soil engineering report. The soil engineering report required by subsection (c) shall include the following:

  • (1) Description of the site topography, drainage, and vegetation patterns.

  • (2) Classification of the site soils and rocks, including subsurface cross-sections when appropriate.

(3) Sufficient borings, test pits, exploratory trenches, soil sampling and field and laboratory testing to determine geotechnical properties affecting structures and grading including:

  • a. in-situ dry density and moisture content

  • b. soil strength characteristics

  • c. expansion potential for soils within 5 feet of finish grade

  • d. compaction of existing fills

  • e. permeability, when applicable

  • f. R-values for areas to be paved

  • g. resistivity and ph levels where buried metal pipes or piles are anticipated

  • h. consolidation of:

  • clay and compressible soils

  • fills and receiving areas

  • landslide deposits to be left in place

  • (4) Findings, recommendations, mitigation measures and design criteria for:

  • a. suitability of earth materials:

  • replacement, reworking and blending requirements of existing materials

  • specifications for imported fill

  • b. slope stability

  • c. bearing values and foundation design

  • d. short/long term settlement potential including hydrocompression potential

  • e. lateral loading factors and retaining wall design criteria

  • f. landslide repair details

  • g. surface and subsurface drainage details (subdrain design details)

  • h. clearing and grubbing and grading specifications

  • i. erosion control measures

  • j. pavement section design criteria (rigid and flexible pavements)

  • k. other design considerations identified by the geotechnical engineer

  • l. items to be observed during construction

(5) Description of the seismic site response to a level of sophistication commensurate with the importance of the structure and criteria needed for structural analysis and design.

(6) A statement of suitability of the site from a geotechnical perspective for the intended use.

  • (7) Recommendation of supplemental geologic/geotechnical studies if warranted.

  • (8) A reference bibliography

  • (9) A plan of the project area showing:

  • a. existing topography

  • b. delineation of:

  • important geologic features

  • fault traces

  • landslides and areas of instability

  • creeks, canals or drainage channels

  • springs and subsurface water

  • existing and proposed improvements

  • boring, test pit and trench locations

  • (10) Logs of subsurface explorations

(11) Tables, figures and details necessary to present field information, test data, findings and design recommendations in a clear and understandable format.

Recommendations included in the report and approved by the city engineer shall be incorporated in the grading plans and specifications.

(f) Engineering geology report. The engineering geology report required by subsection (c) shall include the following:

  • (1) Description of the site geology and geologic structure (including geologic map and cross-sections).

  • (2) Identification of the locations and limits of active and dormant landslides.

  • (3) Discussion of the geomorphology, as applicable.

(4) Identification of the faults, seismicity, ground shaking, liquefaction, lateral spreading, lurch cracking, and settlement hazards.

  • (5) Identification of any other geologic hazards.

(6) Conclusions and recommendations about the effect of geologic conditions on the project, including an assessment of the suitability of the site for the project.

Recommendations included in the report and approved by the city engineer shall be incorporated in the grading plans and specifications.

(g) Geotechnical peer review criteria. The following criteria will be used by the City of Fairfield to establish whether or not a geotechnical peer review will be required for a project:

(1) Landslides: Development areas where active or dormant landslides have been identified, or are likely to be present.

(2) Fault Zones: Development areas located within Alquist-Priolo Earthquake Fault Zones or where geotechnical review indicates a probability of faulting or surface rupture.

(3) Hillside Developments: Development areas where slopes steeper than 7h:lv exist or are proposed within or directly adjacent to the project area.

(4) Substantial Grading: Development areas where substantial grading for access roads, utilities or building pads is proposed. Cuts or fills in excess of 5 feet shall constitute substantial grading.

(5) Creekside Development: Development areas with proposed building setbacks less than 200 feet from existing or proposed creeks, canals or drainage channels.

(6) Natural Springs: Development areas where natural springs, water seepage, or vegetation patterns suggest a high groundwater table that could affect ground stability, structures, or construction.

(7) Geologic Hazards: Development areas where potentially adverse geologic conditions exist such as old fill, liquefaction, lateral spreading or lurch cracking.

(8) Essential Facilities: Public buildings and improvements, as determined by the Public Works Director, to be essential facilities. Essential facilities include, but are not necessarily limited to, the following:

  • Hospitals and health care facilities

  • Fire stations and police stations

  • Communication Centers

  • Emergency Operation Centers

  • Jails and Detention Centers

  • Water and Wastewater Treatment Facilities

  • Dams and reservoirs

  • Pump stations

  • Storm water detention/retention basins

(9) Isolated Developments: Residential developments serving more than 100 units with only one vehicular access or only one point of connection to the public water system.

(h) Issuance. The city engineer may require that grading operations and project designs be modified if delays occur which incur weather generated problems not considered at the time permit was issued.

(Ord. No. 95-20 § 1.)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Fairfield Zoning Code
Fairfield Zoning Code
  1. SECTION 25.10 ORDINANCE PURPOSE AND EFFECT
  2. § 25.12
  3. § 25.20
  4. SECTION 25.22 COMMERCIAL ZONING DISTRICTS
  5. § 25.23
  6. SECTION 25.24 INDUSTRIAL ZONING DISTRICTS
  7. SECTION 25.26 AGRICULTURE AND PUBLIC BENEFIT ZONING DISTRICTS
  8. SECTION 25.28 OVERLAY ZONING DISTRICTS
  9. § 25.30
  10. SECTION 25.32 SPECIFIC USE REGULATIONS
  11. SECTION 25.33 WIRELESS TELECOMMUNICATIONS FACILITIES
  12. SECTION 25.34 PARKING AND LOADING
  13. SECTION 25.36 TREE CONSERVATION
  14. § 25.38
  15. SECTION 25.40 PERMITS
  16. SECTION 25.41 APPLICATION FILING, PROCESSING, AND APPROVAL
  17. SECTION 25.42 PERMIT IMPLEMENTATION
  18. SECTION 25.43 PUBLIC HEARINGS
  19. SECTION 25.44 APPEALS AND CALLS FOR REVIEW
  20. SECTION 25.45 INTERPRETATIONS
  21. § 25.46
  22. SECTION 25.47 GENERAL PLAN AND ZONING AMENDMENTS
  23. SECTION 25.48 SPECIFIC PLANS
  24. SECTION 25.49 PLANNING AREAS
  25. § 25.50
  26. SECTION 25.51 MEASUREMENTS
  27. 25.116 Authority.
  28. 25.117 Purpose.
  29. 25.118 Considerations - General plan. specific plan. and zonin…
  30. 25.119 Environmental impact report process.
  31. 25.120 Existing conditions.
  32. 25.121 Community facilities.
  33. 25.122 General responsibilities.
  34. 25.123 Definitions.
  35. 25.124 Minor subdivision - Filing procedure tentative parcel m…
  36. 25.125 Relationship to the EIR process.
  37. 25.126 Filing fee.
  38. 25.127 Information required on tentative parcel map.
  39. 25.128 Distribution.
  40. 25.129 Authority of the director of planninq and development.
  41. 25.130 Action of the director of planninq and development.
  42. 25.131 Requirements which may be imposed.
  43. 25.132 Appeal to planning commission or city council.
  44. 25.133 Time for filinq parcel map.
  45. 25.134 Approval of tentative parcel map.
  46. 25.135 Form and title of parcel map.
  47. 25.136 Certificates.
  48. 25.137 Survey requirements.
  49. 25.138 Basis of bearings.
  50. 25.139 Dedications.
  51. 25.140 Recordinq of parcel map.
  52. 25.141 Waiver of requirement for recordinq of parcel map.
  53. 25.146 Relationship to EIR process.
  54. 25.147 Filinq procedure.
  55. 25.148 Filing fee.
  56. 25.149 Distribution
  57. 25.150 Design and Development Review.
  58. 25.151 Planning Commission action.
  59. 25.152 Approval period for tentative maps - Time extension.
  60. 25.153 Preparation of tentative map.
  61. 25.154 Scale.
  62. 25.155 Dimension.
  63. 25.156 Information required on tentative map.
  64. 25.157 Street names.
  65. 25.158 Exception from requirements of this article.
  66. 25.159 Final map - Filing procedure.
  67. 25.160 Checking fee.
  68. 25.161 Content and form of final maps.
  69. 25.162 Documents to be filed with final map.
  70. 25.163 Inspection costs.
  71. 25.164 Department approvals.
  72. 25.165 Improvement agreement.
  73. 25.166 Improvement security.
  74. 25.167 Findings and Intent.
  75. 25.168 Definitions.
  76. 25.169 Applicability and Effect.
  77. 25.170 Applications, Documents, Plans and Information to be Su…
  78. 25.171 Specific Requirements for the Approval of Tentative Maps.
  79. 25.172 Tenant Assistance Plan, Required Information at Time of…
  80. 25.173 Tenant Assistance Plan.
  81. 25.174 Agreement for Tenant Assistance.
  82. 25.175 Release of Security.
  83. 25.176 Special Agreements with Tenants.
  84. 25.177 Approval of Final Map: Declaration.
  85. 25.178 Approval of Final Map: Findings.
  86. 25.179 Tenant Identification.
  87. 25.180 Waivers - When Permitted.
  88. 25.181 Procedure.
  89. 25.182 Timing.
  90. 25.183 Declaration of Covenants, Conditions and Restrictions.
  91. 25.184 Rental Housing Shortage: Findings and Vacancy Factors.
  92. 25.185 Application Procedures - Preliminary and Final Applicat…
  93. 25.186 Discretionary Approval/Disapproval.
  94. 25.187 Conditions.
  95. 25.188 Filing of Final Tentative Map Applications and Waivers.
  96. 25.189 Relationship to Other Laws.
  97. 25.190 Severability.
  98. 25.191 - 25.217 Reserved for future legislation.
  99. 25.237 Purpose
  100. 25.238 Scope
  101. 25.239 Relationship to the EIR process.
  102. 25.240 Permits required.
  103. 25.241 Hazards.
  104. 25.242 Definitions.
  105. 25.243 Gradinq permit requirements.
  106. 25.244 Fees.
  107. 25.245 Bonds.
  108. 25.246 Grading.
  109. 25.247 Erosion control.
  110. 25.248 Grading inspection.
  111. 25.249 Completion of work.
  112. 25.250 Runoff Control.
  113. 25.251 Repeal.
  114. 25.301 Title.
  115. 25.302 Authority.
  116. 25.303 Purpose.
  117. 25.304 Regulations.
  118. 25.305 General plan.
  119. 25.401 Conditions of overcrowding.
  120. 25.402 Decision-making body.
  121. 25.403 Dwelling unit.
  122. 25.404 Reasonable methods for mitigating conditions of overcro…
  123. 25.405 Residential development.
  124. 25.501 Findings and notice.
  125. 25.502 Findings - Requirement.
  126. 25.503 Concurrence by city.
  127. 25.504 Findings for development approval.
  128. 25.601 Payment of fees, dedication of land.
  129. 25.602 Payment of fees in small residential developments.
  130. 25.603 Standards for fees or land.
  131. 25.604 Amount of fees or land.
  132. 25.701 Fee required.
  133. 25.702 Land dedication.
  134. 25.703 Refunds.
  135. 25.704 School district schedule.
  136. 25.801 Use of fees and lands.
  137. 25.802 Agreement for fee distribution.
  138. 25.803 Account.
  139. 25.804 Termination of dedication or fee requirements.
  140. 25.900 Purpose.
  141. 25.901 Applicability
  142. 25.902 Definitions
  143. 25.903 Creekside regulation.
  144. 25.1301 Purpose
  145. 25.1302 Applicability
  146. 25.1303 Sign Approvals
  147. 25.1304 Regulations for On-Site Signs
  148. 25.1305 Requirement for Sign to Disclose Public Facilities and…
  149. 25.1306 Exceptions
  150. 25.1307 Sign Polices Adopted By Resolution
  151. 25.1308 Special Sign Districts
  152. 25.1309 Prohibited Signs
  153. 25.1310 Measurement of Sign Area and Height
  154. 25.1311 Nonconforming Signs
  155. 25.1312 Inventory and Abatement
  156. 25.1313 Definitions.
  157. 25.1401 Purpose.
  158. 25.1402 Definitions.
  159. 25.1403 Noise Standards.
  160. 25.1404 Specific Prohibitions
  161. 25.1405 Exemptions.
  162. 25.1406 Noise Standards for New Development Projects.
  163. 25.1407 Non-transportation Noise.
  164. 25.1408 Ground Transportation.
  165. 25.1409 Special Standards for Residential Development Near the…
  166. 25.1410 Special Standards for New Mixed Use Projects
  167. 25.1411 Aircraft Noise
  168. 25.1412 Acoustical Analysis
  169. 25.1413 Enforcement
  170. 25.1501 Findings and intent.
  171. 25.1502 Purpose.
  172. 25.1503 Definitions.
  173. 25.1504 Establishment of City-wide development impact fees.
  174. 25.1505 Establishment of northeast area development impact fees.
  175. 25.1506 Payment of fees.
  176. 25.1507 Credits.
  177. 25.1508 Annual Findings.
  178. 25.1509 Review of Thirty Year Capital Construction Program.
  179. 25.1510 Administrative Review Procedure.
  180. 25.1511 Appeal to City Manager.
  181. 25.1901 Purpose.
  182. 25.1902 Definitions.
  183. 25.1903 Inventory of Historic Resources.
  184. 25.1904 Designation of Historic Landmarks.
  185. 25.1905 Benefits Available to Historic Landmarks.
  186. 25.1906 Historic Districts.
  187. 25.1907 Permits for Changes to Designated Historic Landmarks.
  188. 25.1908 Demolition or Removal of Structures Included on invent…

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.