Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
Section 318
California Existing Building Code (Title 24, Part 10) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
318.1 In addition to the definitions given in Section 202, for¶
the purposes of Sections 317 through 323, certain terms are defined as follows:
ADDITION means any work that increases the floor or roof area or the volume of enclosed space of an existing building, and is structurally attached to the existing building by con- nections that are required for transmitting vertical or hori- zontal loads between the addition and the existing structure.
ALTERATION means any change within or to an existing building, which does not increase and may decrease the floor or roof area or the volume of enclosed space.
BSE-C RESPONSE ACCELERATION PARAMETERS
[BSC] are the parameters (SXS and SX1) taken from 5-percent/ 50-year maximum direction spectral response acceleration curves or by a Site Specific Response Spectrum developed in accordance with ASCE 41, Section 2.4.2.1.
BSE-R RESPONSE ACCELERATION PARAMETERS
[BSC] are the parameters (SXS and SX1) taken from 20-percent /50-year maximum direction spectral response acceleration curves or by a Site Specific Response Spectrum developed in accordance with ASCE 41, Section 2.4.2.1.
TABLE 317.5 SEISMIC PERFORMANCE REQUIREMENTS BY BUILDING REGULATORY AUTHORITY AND RISK CATEGORY.
| Building Regulatory Authority | Risk Category | PERFORMANCE CRITERIA | |
|---|---|---|---|
| Building Regulatory Authority | Risk Category | Level 1 | Level 2 |
| State-Owned [BSC] | I, II, III | BSE-R, S-3, N-C | BSE-C, S-5, N-D |
| State-Owned [BSC] | IV | BSE-R, S-2, N-B | BSE-C, S-4, N-D |
| Division of the State Architect - [DSA-SS] | I | BSE-1N, S-3, N-B | BSE-2N, S-5, N-D |
| Division of the State Architect - [DSA-SS] | II, III | BSE-1N, S-2, N-B | BSE-2N, S-4, N-D |
| Division of the State Architect - [DSA-SS] | IV | BSE-1N, S-2, N-A | BSE-2N, S-4, N-D |
| Division of the State Architect - [DSA-SS/CC] | I, II | BSE-1E, S-3, N-C | BSE-2N, S-5, N-D |
| Division of the State Architect - [DSA-SS/CC] | III | BSE-1E, S-3, N-B | BSE-2N, S-5, N-D |
| Division of the State Architect - [DSA-SS/CC] | IV | BSE-1E, S-2, N-B | BSE-2N, S-4, N-D |
1. ASCE 41 provides acceptance criteria (e.g., m, rotation) for Immediate Occupancy (S1), Life Safety (S3), and Collapse Prevention (S5), and specifies in Sections 2.3.1.2.1 and 2.3.1.4.1 the method to interpolate values for S-2 and S-4, respectively. For nonstructural components, N-A corresponds to the Operational level, N-B to the Position Retention, N-C to the Life Safety level, N-D to the Hazards Reduced, and N-E to the Not Considered. When evaluating for the Hazards Reduced Nonstructural Performance Level, the requirements need not be greater than what would be required by ASCE 7 nonstructural provisions for new construction. 2. Buildings evaluated and retrofitted to meet the requirements for a new building, Chapter 16 of the California Building Code, in accordance with the exception in Section 319.1, are deemed to meet the seismic performance requirements of this section.
Performance Level, the requirements need not be greater than what would be required by ASCE 7 nonstructural_ provisions for new construction. 2. Buildings evaluated and retrofitted to meet the requirements for a new building, Chapter 16 of the California Building Code, in accordance with the exception in Section 319.1, are deemed to meet the seismic performance requirements of this section.
Copyright © 2019 ICC. ALL RIGHTS RESERVED. Accessed by Kevin Day (kevin.day@dgs.ca.gov), (California Building Standards Commission) Order Number #100735044 on Jul 24, 2019 03:54 PM (PDT) pursuant to License Agreement with ICC. No further reproduction or distribution authorized. Single user only, copying and networking prohibited. ANY UNAUTHORIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT, AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
100735044
PROVISIONS FOR ALL COMPLIANCE METHODS
BUILDING OFFICIAL is that individual within the agency or organization charged with responsibility for compliance with the requirements of this code. For some agencies this person is termed the “enforcement agent.”
DESIGN is the procedure that includes both the evaluation and retrofit design of an existing component, element or structural system, and design of a new component, element or structural system.
ENFORCEMENT AGENCY (Authority Having Jurisdiction in ASCE 41) is the agency or organization charged with responsibility for agency or organization compliance with the requirements of this code.
METHOD A refers to the procedures prescribed in Section 320.
METHOD B refers to the procedures allowed in Section 321.
MODIFICATIONS. For this chapter, modification is taken to include repairs to structures that have been damaged.
N-A, N-B, N-C, N-D, N-E are seismic nonstructural compo- nent performance measures as defined in ASCE 41. N-A cor- responds to the highest performance level, and N-D the lowest, while N-E is not considered.
PEER REVIEW refers to the procedures contained in Sec- tion 322.
REPAIR as used in this chapter means the design and con- struction work undertaken to restore or enhance the structural and nonstructural load-resisting system participating in the lateral response and stability of a structure that has experi- enced damage from earthquakes or other destructive events.
S-1, S-2, S-3, S-4, S-5, S-6 are seismic structural perfor- mance measures as defined in ASCE 41. S-1 corresponds to the highest performance level, and S-5 the lowest, while S-6 is not considered.
SPECIFIC PROCEDURES are the procedures listed in Sec- tion 319.1.1.
STRUCTURAL REPAIRS are any changes affecting exist- ing or requiring new structural components primarily intended to correct the effects of damage, deterioration or impending or actual failure, regardless of cause.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Existing Building Code (Title 24, Part 10)
- Chapter 2 — DEFINITIONS
- Appendix A — GUIDELINES FOR
- Appendix B — SUPPLEMENTARY
- Appendix C — GUIDELINES FOR THE
- Chapter 1 — SCOPE AND ADMINISTRATION
▸Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS
Overview- Section 301
- Section 302
- Section 303
- Section 304
- Section 305
- Section 306
- Section 307 — [OSHPD 1R, 2, and 5]
- Section 308 — [OSHPD 1R, 2 and 5]
- Section 309 — [OSHPD 1R]
- Section 313
- Section 314
- Section 315
- Section 316
- Section 317
- Section 318
- Section 319
- Section 320
- Section 321
- Section 322
- Section 323
- Section 302A
- Section 301A
- Section 303A
- Section 304A
- Section 305A
- Section 306A
- Section 307A
- Section 308A
- Section 309A
- Section 310A
- Chapter 4 — REPAIRS
- Chapter 5 — PRESCRIPTIVE COMPLIANCE METHOD
- Chapter 6 — CLASSIFICATION OF WORK
- Chapter 7 — ALTERATIONS - LEVEL 1
- Chapter 8 — ALTERATIONS - LEVEL 2
- Chapter 9 — ALTERATIONS - LEVEL 3
- Chapter 10 — CHANGE OF OCCUPANCY
- Chapter 11 — ADDITIONS
- Chapter 12 — HISTORIC BUILDINGS
- Chapter 13 — PERFORMANCE COMPLIANCE METHODS
- Chapter 14 — RELOCATED OR MOVED BUILDINGS
- Chapter 15 — CONSTRUCTION SAFEGUARDS
- Chapter 16 — REFERENCED STANDARDS