Skip to content

Chapter 3 — PROVISIONS FOR ALL COMPLIANCE METHODS

Section 308A

California Existing Building Code (Title 24, Part 10) · 2019 edition · updated 2026-09-10 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

COMPLIANCE ALTERNATIVES

FOR MEANS OF EGRESS

308A.1 General. Means of egress through existing buildings

shall be in accordance with the California Building Code, except as modified in this section.

308A.1.1 Means of egress. Means of egress shall comply with the requirements of Sections 308A.1.1.1 and 308A.1.1.2.

Exception: The enforcing agency shall be permitted to exempt minor additions, minor alterations and minor remodel projects from these requirements.

308A.1.1.1 Means of egress for hospital buildings. Means of egress for hospital buildings shall comply with the requirements of Sections 308A.1.1.1.1 through 308A.1.1.1.6.

308A.1.1.1.1 New and existing conforming hospi- tal buildings. Means of egress for new hospital buildings and additions to existing conforming hos- pital buildings shall only pass through buildings that are conforming or comply with the require- ments of SPC-3 or higher, and NPC-4/NPC-4D or higher.

Exception: Existing means of egress that pass through hospital buildings that have approved nonstructural performance categories NPC-3, or NPC-2, if the building has an approved extension to the NPC-3 deadline, shall be permitted to remain for the duration of extension. The non- structural components in the path of egress shall be braced in accordance with the new building provisions of this code.

308A.1.1.1.2 Existing SPC-2 hospital buildings. Means of egress for additions to existing SPC-2 hos- pital buildings shall only pass through hospital buildings that have approved performance catego- ries of SPC-2 or higher and NPC-4/NPC-4D or higher.

Exception: The means of egress shall be permit- ted to pass through hospital buildings that have approved nonstructural performance categories of NPC-3, or NPC-2 if the building has an approved extension to the NPC-3 deadline. Non- structural components in the path of egress shall be braced in accordance with the new building provisions of this code.

Copyright © 2019 ICC. ALL RIGHTS RESERVED. Accessed by Kevin Day (kevin.day@dgs.ca.gov), (California Building Standards Commission) Order Number #100735044 on Jul 24, 2019 03:54 PM (PDT) pursuant to License Agreement with ICC. No further reproduction or distribution authorized. Single user only, copying and networking prohibited. ANY UNAUTHORIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT, AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.

100735044

Office of Statewide Health Planning and Development (OSHPD).

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Existing Building Code (Title 24, Part 10)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.