Section 508 — MOVED STRUCTURES
508.2 Removal of Debris.
San Francisco Building Inspection Commission Codes · edición 2022 · actualizado 2026-07-08 · San Francisco
Esta sección aún no está traducida y se muestra en inglés.
508.2 Removal of Debris. Immediately after the building is moved and before it is occupied at the new site, the permittee must remove all debris and all walls and footings above grade at the site from which it has been moved, except where such walls provide support to adjacent buildings, structures or property. All excavated areas must be filled in or protected by substantial fences not less than 5 feet (1524 mm) in height.
Add the following Chapters:
Chapter 5B EARTHQUAKE HAZARD REDUCTION IN UNREINFORCED MASONRY BEARING WALL BUILDINGS
( NOTE: The time limits for compliance with the provisions of Chapters 5B and 5C have passed, but the ordinance and the time limits therein are still in effect.)