505B.8 Phased Strengthening.

San Francisco Building Inspection Commission Codes · edición 2022 · actualizado 2026-07-08 · San Francisco

Esta sección aún no está traducida y se muestra en inglés.

505B.8 Phased Strengthening. Other provisions of this code notwithstanding, an unreinforced masonry bearing wall building may be strengthened in phases under multiple alteration permits, provided:

  1. A complete structural analysis accompanied by plans, specifications and calculations for the proposed mitigation solution is submitted to the Department with the first alteration permit application; and

  2. A phasing program is submitted to and approved by the Department as part of the review of the first alteration permit application; and

  3. Each subsequent alteration permit application clearly indicates the further work proposed and the work completed to date; and

  4. The engineer or architect responsible for the structural design for the strengthening program provides structural requirements observation in accordance with San Francisco Building Code Section 1704.6; and

5 . All of the required strengthening work is completed within the time limits set forth in Table 5B-A.