Chapter 19-20 — SUBDIVISION DESIGN
19-28 — FINAL MAP PROCEDURES
Santa Rosa Municipal Code · 2026-07 edition · updated 2026-09-27 · Santa Rosa
§ 19-28.010. Time limit.¶
§ 19-28.020. Number of copies.¶
§ 19-28.030. Extension of time.¶
§ 19-28.040. Extension of time for maps subject to significant public improvement…¶
§ 19-28.050. Stay of time.¶
§ 19-28.060. Failure to file.¶
§ 19-28.070. Size, material and scale of map.¶
§ 19-28.080. Subdivision boundary clearly designated.¶
§ 19-28.090. Title of sheets.¶
§ 19-28.100. Certificates, statements, acknowledgments and descriptions required.¶
§ 19-28.110. Survey data.¶
§ 19-28.120. Coordinate and/or record ties.¶
§ 19-28.130. Centerlines of streets and alleys to be shown.¶
§ 19-28.140. Existing monuments.¶
§ 19-28.150. Lots and parcels.¶
§ 19-28.160. Easements.¶
§ 19-28.165. Abandonment of dedications.¶
§ 19-28.170. Location map.¶
§ 19-28.180. Key map.¶
§ 19-28.190. Reference to additional information.¶
§ 19-28.200. Additional information.¶
§ 19-28.210. Documents to be submitted with final map.¶
§ 19-28.220. Improvement plans and design data.¶
§ 19-28.230. Final map certification by City Engineer.¶
§ 19-28.240. Final map approval by the City Engineer.¶
§ 19-28.250. Submission of additional copies.¶
§ 19-28.260. Filing of multiple final maps.¶
§ 19-28.270. First Tubbs/Nuns Fire tentative map extension.¶
§ 19-28.280. Second Tubbs/Nuns fire tentative map extension.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code