Sec. 78-186. - Urban lot split lot requirements.

San Fernando Planning Code · 2026-07 edition · updated 2026-09-02 · San Fernando

(a)

The following requirements apply to all lots created using the urban lot split process pursuant to this division and Government Code § 66411.7, except to the extent that they would preclude the creation of no more than two new parcels that comply with the lot requirements of this section. Any modifications of these requirements shall be the minimum modification necessary to avoid physically precluding the creation of no more than two new parcels that comply with the lot requirements of this section.

(b)

Lot requirements:

(1)

Number: The parcel map subdividing an existing parcel pursuant to this division shall create no more than two parcels. Both parcels shall be considered new parcels.

(2)

Street frontage: Each lot shall have street frontage on or access to a public right-of-way as required by the public works department. The lot split line shall be parallel to the street property line. If the street property line curves, the lot split line may have the same or similar curve radius or may be straight.

(3)

Width: Lot width shall be per the R-1 zoning district. The width of any lot resulting from an urban lot split shall not be less than 75 percent of the original lot width. Flag lot width shall be measured across the large portion of the lot, not the narrow portion connected to the street.

(4)

Depth: Lots created per this division are not required to have a minimum depth, provided that the minimum lot size stated in subsection (b)(5) below is maintained.

(5)

Lot size:

a.

No lot resulting from an urban lot split shall be smaller than 1,200 square feet.

b.

The two resulting lots shall be of approximately equal lot area, and not smaller than 48 percent or larger than 52 percent of the lot area of the original parcel.

(6)

Parcel configuration: Flag lots are permitted, provided that the narrow portion of the lot connected to the public right-of-way has sufficient width for a driveway and for emergency pedestrian access. An access easement shall be recorded providing street access for the rear parcel.

(7)

Utilities:

a.

Each parcel created by an urban lot split shall have water, sewer, storm drain, gas and electric utility service that comply with city standards.

b.

The subdivider shall be responsible to install connections to city facilities in accordance with city standards.

c.

All required utility connections shall be placed on the same parcel as the unit or units the utilities are serving, or shall be located within a utility easement.

d.

Unused connections shall be abandoned per city standard.

(Ord. No. 1714, § 4, 2-6-2023)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — San Fernando Planning Code
San Fernando Planning Code
  1. Chapter 34 — ENVIRONMENT
  2. Division 1 — GENERALLY
    Overview
    1. Sec. 34-26. - Declaration of policy.
    2. Sec. 34-27. - Definitions.
    3. Sec. 34-28. - Specific noises prohibited.
    4. Sec. 34-29. - Exterior noise standards.
    5. Sec. 34-30. - Interior noise standards.
    6. Sec. 34-31. - Exclusions.
    7. Sec. 34-32. - Noise level measurement.
    8. Sec. 34-33. - Manner of enforcement.
    9. Sec. 34-34. - Variance procedure.
    10. Sec. 34-35. - Appeals.
    11. Sec. 34-36. - Reserved.
    12. Sec. 34-66. - Required.
    13. Sec. 34-67. - Issuance; term.
    14. Sec. 34-68. - Application.
    15. Sec. 34-69. - Conditions of use.
    16. Sec. 34-70. - Notice of denial of amplified sound permit appli…
    17. Sec. 34-71. - Appeal of action on an amplified sound permit ap…
    18. Sec. 34-96. - Title.
    19. Sec. 34-97. - Purpose and intent.
    20. Sec. 34-98. - Definitions.
    21. Sec. 34-99. - Construction and application.
    22. Sec. 34-100. - Prohibited activities.
    23. Sec. 34-101. - Exempted discharges, conditionally exempted dis…
    24. Sec. 34-102. - Good housekeeping practices.
    25. Sec. 34-103. - Requirements for industrial/commercial and cons…
    26. Sec. 34-104. - Requirements for planning priority projects.
    27. 0.2 inches per hour; or
    28. Sec. 34-105. - Enforcement.
    29. Sec. 34-106. - Taking of property.
    30. Sec. 34-107. - Article controls over other provisions.
    31. Sec. 62-26. - Established.
    32. Sec. 62-27. - Composition and appointment of members.
    33. Sec. 62-28. - Compensation.
    34. Sec. 62-29. - Officers.
    35. Sec. 62-30. - Meetings generally.
    36. Sec. 62-31. - Absence from meetings.
    37. Sec. 62-32. - Quorum.
    38. Sec. 62-33. - Rules and regulations.
    39. Sec. 62-34. - Records and reports.
    40. Sec. 62-35. - Powers and duties generally.
    41. Sec. 62-36. - Powers and duties, trees and city's urban forest.
    42. Sec. 62-86. - Authority for proceedings.
    43. Sec. 62-87. - Resolution of intention.
    44. Sec. 62-88. - Notice and hearing.
    45. Sec. 62-89. - Protests and action thereon.
    46. Sec. 62-90. - Protests deemed less than majority.
    47. Sec. 62-91. - Definitions and classifications of businesses.
    48. Sec. 62-92. - Name of area.
    49. Sec. 62-93. - Established.
    50. Sec. 62-94. - Description.
    51. Sec. 62-95. - Businesses subject to additional license fee.
    52. Sec. 62-96. - Additional license fee schedule.
    53. Sec. 62-97. - Use of proceeds of additional license fee.
    54. Sec. 62-98. - Credit against additional license fee.
    55. Sec. 62-99. - Collection of additional license fee.
    56. Sec. 62-100. - New business.
    57. Sec. 62-101. - Businesses exempt from license fee.
    58. Sec. 62-131. - Authority for proceedings.
    59. Sec. 62-132. - Resolution of intention.
    60. Sec. 62-133. - Notice and hearing.
    61. Sec. 62-134. - Protests and action thereon.
    62. Sec. 62-135. - Protests deemed less than majority.
    63. Sec. 62-136. - Name of area.
    64. Sec. 62-137. - Description.
    65. Sec. 62-138. - Benefit zones.
    66. Sec. 62-139. - Uses of proceeds in respective zones; purposes.
    67. Sec. 62-140. - Classification of businesses and appeals.
    68. Sec. 62-141. - Businesses subject to additional fee.
    69. Sec. 62-142. - Rate of increase or additional charge of licens…
    70. Sec. 62-143. - Area constituted and established.
    71. Sec. 62-144. - Definitions and classifications.
    72. Sec. 62-145. - Due date and penalty for nonpayment of addition…
    73. Sec. 62-146. - Collection of additional fee.
    74. Sec. 62-147. - New business.
    75. Sec. 62-148. - Exemption; voluntary contribution.
    76. Article I — IN GENERAL
      Overview
      1. Sec. 78-1. - Short title.
      2. Sec. 78-2. - Compliance of title transfers with Subdivision Ma…
      3. Sec. 78-3. - Purpose; supplement to Subdivision Map Act.
      4. Sec. 78-4. - Processing fee.
      5. Sec. 78-5. - Conformity of proposed subdivision with general p…
      6. Sec. 78-6. - Merger of parcels.
      7. Sec. 78-7. - Owner-initiated merger of parcels.
      8. Sec. 78-36. - Approval.
      9. Sec. 78-37. - Additional requirements.
      10. Sec. 78-38. - Grading and erosion control.
      11. Sec. 78-66. - Supplemental information and materials to accomp…
      12. Sec. 78-67. - Tentative map filing, review and report.
      13. Sec. 78-68. - Planning commission review of tentative map.
      14. Sec. 78-69. - City council review of tentative map.
      15. Sec. 78-70. - Required content and form.
      16. Sec. 78-71. - Expiration dates of tentative map.
      17. Sec. 78-72. - Final parcel maps.
      18. Sec. 78-73. - Final tract map filing and review.
      19. Sec. 78-101. - Filing of map prerequisite to request for waiver.
      20. Sec. 78-102. - Form, contents of request.
      21. Sec. 78-103. - Subdivider's compliance with conditions of appr…
      22. Sec. 78-104. - Approval procedure.
      23. Sec. 78-105. - Time limit for decision.
      24. Sec. 78-106. - Certificate of waiver.
      25. Sec. 78-136. - Purpose.
      26. Sec. 78-137. - Consistency.
      27. Sec. 78-138. - Definitions.
      28. Sec. 78-139. - Application of division.
      29. Sec. 78-140. - Filing and processing.
      30. Sec. 78-141. - Processing information.
      31. Sec. 78-142. - Fees.
      32. Sec. 78-143. - Expiration.
      33. Sec. 78-144. - Vesting on approval.
      34. Sec. 78-145. - Development inconsistent with zoning; condition…
      35. Sec. 78-146. - Application inconsistent with current policies.
      36. Sec. 78-176. - Soils report.
      37. Sec. 78-177. - Monuments.
      38. Sec. 78-180. - Purpose.
      39. Sec. 78-181. - Term of effect.
      40. Sec. 78-182. - Definitions.
      41. Sec. 78-183. - Ministerial approval and findings.
      42. Sec. 78-184. - Covenant and affidavits required.
      43. Sec. 78-185. - Criteria for approval.
      44. Sec. 78-186. - Urban lot split lot requirements.
      45. Sec. 78-187. - Additional requirements for urban lot split.
      46. Sec. 78-188. - Required contents for recorded title.
      47. Sec. 78-189. - Pre-existing nonconforming zoning conditions.
      48. Sec. 78-190. - Expiration of urban lot split subdivisions.
      49. Sec. 78-191. - Application requirements.
      50. Sec. 78-206. - Applicability.
      51. Sec. 78-207. - Public streets, highways, alleys and easements.
      52. Sec. 78-208. - Private streets, alleys or ways.
      53. Sec. 78-209. - Utility easements.
      54. Sec. 78-210. - Drainage easements.
      55. Sec. 78-211. - School sites.
      56. Sec. 78-212. - Public facilities.
      57. Sec. 78-213. - Supplemental size of improvements.
      58. Sec. 78-214. - Off-site improvements.
      59. Sec. 78-215. - Park and recreation dedications and fees.
      60. Sec. 78-216. - Improvement standards.
      61. Sec. 78-246. - Improvement agreement.
      62. Sec. 78-247. - Improvement bonds.
      63. Sec. 78-248. - Faithful performance bond for monuments.
      64. Sec. 78-249. - Surety company requirements.
      65. Sec. 78-250. - Cash deposits and negotiable bonds.
      66. Sec. 78-251. - Release of improvement security.

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.