Division 3 — Electrical Permit Procedures (Added 12-9-1997 by O-18451 N.S.)
§129.0303 Exemptions from an Electrical Permit
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
An Electrical Permit is not required for the following work:
(a) Minor work such as replacing fuses, replacing or repairing switches, circuit breakers, lampholders, luminaires, ballasts, or receptacles where the replacement is the same size and general type as the original equipment and the work is done in accordance with the provisions of this article;
(b) The replacement of lamps or the connection of portable appliances to suitable receptacles that have been permanently installed;
(c) Installation, alteration, or repair of wiring, devices, appliances, or equipment that operates at a voltage not exceeding 25 volts between conductors and not capable of supplying more than 50 watts of energy;
(d) Installation of remote-control switching devices on privately owned appliances when the devices are installed by the San Diego Gas and Electric Company or its authorized agents as part of the Peak-Shift energy conservation program, provided that specifications for the installations are approved in writing by the Building Official; or
Ch. Art. Div. 12 9 3 1
San Diego Municipal Code
Chapter 12: Land Development Reviews
(5-2020)
(e) Work done by employees of the City on City-owned or leased buildings.
(f) Repair or replacement of hardwired appliances such as dishwashers, garbage disposals, cooking appliances and similar fixed appliances located within dwelling units shall not impose additional electrical load to the existing circuit impacted by the work.
(g) Exemption from the permit requirements of the Electrical Regulations does not authorize any work to be done in any manner in violation of the provisions of the Electrical Regulations or any other applicable local or state regulations.
(Amended 9-24-2002 by O-19104 N.S.) (Amended 6-27-2005 by O-19392 N.S.) (Amended 4-8-2008 by O-19727 N.S; effective 5-8-2008.) (Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.) (Amended 4-6-2016 by O-20624 N.S.; effective 5-6-2016.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
- Division 2 — Rules for Calculation and Measurement
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
- Division 1 — General Construction Permit Authority and Procedu…
- Division 2 — Building Permit Procedures
-
▸ Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
Overview- §129.0301 Purpose of Electrical Permit Procedures
- §129.0302 When an Electrical Permit Is Required
- §129.0303 Exemptions from an Electrical Permit
- §129.0305 General Rules for Electrical Permits
- §129.0306 Qualifications for Obtaining an Electrical Permit
- §129.0307 How to Apply for an Electrical Permit
- §129.0308 Decision Process for an Electrical Permit
- §129.0309 Issuance of an Electrical Permit and Closing of an E…
- §129.0310 Electrical Permit Expiration
- §129.0314 Required Inspections for an Electrical Permit
- §129.0315 Electrical Permits for Temporary Installations
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone