Division 1 — General Construction Permit Authority and Procedures
§129.0109 Use of Alternate Materials, Design, or Construction Methods
San Diego Zoning Code · 2026-06 edition · updated 2026-07-25 · San Diego
(a) The provisions of the San Diego Fire Code and the Building, Electrical, Plumbing, Mechanical, Residential Building, Green Building, and Existing Building Regulations of the San Diego Municipal Code are not intended to prevent the use or installation of any alternate material, or to prohibit any design or construction method not specifically prescribed by the San Diego Fire Code or the Building, Electrical, Plumbing, Mechanical, Residential Building, Green Building, and Existing Building Regulations, provided the Building Official approves of their use.
(b) The Building Official may approve the use of any alternate material, design, or construction method if the Building Official determines the following:
(1) That the proposed alternate material, design, or construction method is satisfactory and would comply with the intent of the regulations in the San Diego Fire Code and the Building, Electrical, Plumbing, Mechanical, Residential Building, Green Building, and Existing Building Regulations of the San Diego Municipal Code;
(2) That the proposed alternate material, design, or construction method is at least equivalent to the standards prescribed in the applicable regulation in terms of suitability, quality, strength, effectiveness, fire resistance, durability, safety, and sanitation; and
(3) That sufficient evidence has been submitted to substantiate any claims that may be made regarding the use of any proposed alternate material, design, or construction method.
(c) The details of any action granting approval of an alternate material, design, or construction method shall be entered into the file for that individual permit and a record of the action shall be maintained in accordance with the procedures established by the City Manager.
(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 7-31-2012 by O-20187 N.S.; effective 8-30-2012.) (Amended 1-18-2018 by O-20897 N.S.; effective 2-17-2018.) (Amended 7-20-2018 by O-20958 N.S.; effective 8-19-2018.)
Ch. Art. Div. 12 9 1 8
San Diego Municipal Code (10-2024)
Chapter 12: Land Development Reviews
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — San Diego Zoning Code
- Chapter 9
- Division 2 — House Numbers
- Division 3 — Advertising Displays Adjacent to Scenic Freeways,…
- Division 1 — General Provisions and Definitions
- Division 2 — Financing Facilities
- Division 3 — Bonds
- Division 1 — Housing Code
- Division 2 — Mobilehome Parks and Special Occupancy Parks
- Division 3 — San Diego Housing Commission
- Division 4 — Interim School Facilities Financing Ordinance
- Division 6 — Housing Impact Fees On Commercial Development
- Division 7 — Residential Tenant Protections
- Division 8 — Prohibition of Discrimination Based on a Tenant’s…
- Division 9 — Notice of Tenant’s Right to Operate a Daycare Home
- Division 10 — Affordable Housing Preservation
- Division 11 — Prohibition of Anti-Competitive Automated Rent P…
- Division 12 — Residential Tenant Utility Fees
- Division 1 — In General
- Division 2 — Responsibilities of City Council
- Division 3 — Administration of Program
- Division 5 — Designation of Residential Rehabilitation Areas a…
- Division 6 — Limitations on Amount of Loan
- Division 7 — Terms of Conventional RAP Loans
- Division 9 — Miscellaneous Provisions
- Division 19.7 — The Centre City Planned District
- Division 19.8 — The Centre City Planned District
- Division 2 — Land Development Authorities and Advisory Boards
- Division 2 — Fees and Deposits
- Division 3 — Notice
- Division 4 — Public Hearings
- Division 5 — Decision Process
- Division 1 — Definitions
- Division 2 — Rules for Calculation and Measurement
- Division 2 — Enforcement Authorities For the Land Development …
- Division 4 — Procedures For Abatement of Unsafe, Dangerous,
- Division 1 — Adoption And Amendment Procedures for Land Use Pl…
- Division 1 — Zoning and Rezoning Procedures
- Division 3 — Zoning Use Certificate Procedures
- Division 5 — Residential High Occupancy Permit
- Division 6 — Mobile Food Truck Permit
- Division 1 — General Subdivision Procedures
- Division 2 — Certificate of Compliance
- Division 4 — Tentative Maps (Added 12-9-1997 by O-18451 N.S.)
- Division 5 — Parcel Maps (Added 12-9-1997 by O-18451 N.S.; eff…
- Division 6 — Final Maps
- Division 7 — Merger of Parcels (Added 12-9-1997 by O-18451 N.S…
- Division 8 — Reversion to Acreage
- Division 9 — Public Right-of-Way Vacations
- Division 10 — Easement Vacations
- Division 3 — Conditional Use Permit Procedures
- Division 4 — Neighborhood Development Permit Procedures (Added…
- Division 5 — Site Development Permit Procedures
- Division 6 — Planned Development Permit Procedures (Added 12-9…
- Division 8 — Variance Procedures
- Division 1 — General Review Procedures for Previously Conformi…
- Division 2 — Review Procedures for Previously Conforming Signs
- Division 1 — General Procedures and Authorities for Implementa…
- Division 2 — Procedures for Determination of
- Division 3 — Procedures for Preparation and Review of Environm…
-
▸ Division 1 — General Construction Permit Authority and Procedu…
Overview- §129.0101 Purpose of Construction Review Procedures
- §129.0102 When Construction Permit Procedures Apply
- §129.0103 Interpretation of Differing Regulations
- §129.0104 Construction Permit Authorities
- §129.0105 How to Apply for Construction Permit Review
- §129.0107 Decision Process for Construction Permits
- §129.0108 Issuance of a Construction Permit
- §129.0109 Use of Alternate Materials, Design, or Construction …
- §129.0110 Testing of Materials, Designs, or Construction Methods
- §129.0111 General Rules for Construction Permit Inspections
- §129.0112 Responsibilities of Permit Holder Regarding Inspecti…
- §129.0113 When a Certificate of Occupancy Is Required
- §129.0114 Issuance of a Certificate of Occupancy
- § 129.0115 Issuance of a Temporary Certificate of Occupancy
- §129.0116 Posting of Certificate of Occupancy
- §129.0117 Temporary Construction Permit
- §129.0118 Suspension or Revocation of a Certificate of Occupancy
- §129.0119 Bond Required for Construction Permit for Grading or…
- §129.0120 Lot Tie Agreements
- §129.0121 License and Insurance Requirements for Contractors a…
- §129.0122 Indemnification for Construction Permits
- Division 2 — Building Permit Procedures
- Division 3 — Electrical Permit Procedures (Added 12-9-1997 by …
- Division 4 — Plumbing/Mechanical Permit Procedures
- Division 6 — Grading Permit Procedures (Added 12-9-1997 by O-1…
- Division 7 — Public Right-of-Way Permits
- Division 9 — Fire Permit Procedures
- Division 4 — Residential Base Zones
- Division 5 — Commercial Base Zones
- Division 6 — Industrial Base Zones
- Division 7 — Mixed-Use Base Zones
- Division 2 — Airport Approach Overlay Zone
- Division 3 — Airport Environs Overlay Zone
- Division 6 — Sensitive Coastal Overlay Zone
- Division 7 — Mobilehome Park Overlay Zone (Added 12-9-1997 by …
- Division 8 — Parking Impact Overlay Zone
- Division 9 — Residential Tandem Parking Overlay Zone
- Division 10 — Transit Area Overlay Zone
- Division 11 — Urban Village Overlay Zone
- Division 12 — Mission Trails Design District
- Division 13 — Clairemont Height Limit Overlay Zone
- Division 15 — Airport Land Use Compatibility Overlay Zone
- Division 16 — Community Enhancement Overlay Zone