Earlier editions: 2026-09
Riverside County Municipal Code Ch. 4.44 Consolidated Fees for Land Use and Related Functions
Riverside County Municipal Code · 2026-10 edition · updated 2026-10-04 · Riverside County
Cite as: Riverside County Municipal Code Chapter 4.44 · Text as of 2026-10-04
4.44.010 - Purpose.¶
The purpose of this chapter is to provide for the consolidation of certain schedules of fees related to the land use matters as provided for in the separate ordinances, resolutions and rules of the County of Riverside mentioned herein. The meaning of any particular word or phrase appearing herein shall be determined by reference to the ordinance, resolution, or rule to which it relates. Should any fee provided herein be ruled invalid or unenforceable, such determination shall not affect the validity of all remaining fee provisions.
(Ord. No. 671.23, § 1, 12-17-2024)
4.44.020 - Fees.¶
A. Deposit-based, actual cost fees.
Certain application functions within this chapter are designated as requiring deposit-based fees and are identified as such with the legend "Deposit-based Fee:" following the function title.
For deposit-based fee functions only, fees collected in excess of the actual cost of providing the specific service shall be refunded. Applications whose work require a cost beyond the initial deposit shall require a supplemental deposit. Work on any application will cease when the deposit is depleted and will resume when supplemental deposits are received, and the account is in good standing.
The county will draw against deposited funds on regular payroll accounting cycles and at the fully burdened hourly rates for each job classification required to provide a specified service. Hourly rates for services shall be established through the yearly budget process and adopted by the board of supervisors as part of the county budget public hearings. subject to all county procedures and all legal requirements applicable to such contracts, the county may contract with consultants to provide any specified service whenever it is determined necessary to provide such service, and the county may thereafter draw against deposited funds in the amount of the actual costs of such contract services.
Deposits for applications will be collected upon submittal of the application. Deposits will be monitored and, when eighty (80) percent depleted, an analysis of the project will be done to determine if the remaining portion of the deposit will cover expected project completion costs. If costs are expected to exceed the remaining deposit in an amount of one hundred dollars ($100.00) or more, supplemental deposits will be required to be submitted to recover the estimated full cost for completion. Supplemental deposits will be determined on a case-by-case basis based on the estimated cost to complete the application.
A full accounting of each application will be made within ninety (90) days of application's decision - and provided to the applicant. Remaining deposits of one hundred dollars ($100.00) or more will be refunded to the applicant.
The property owner acknowledges that the applicant is authorized to submit this agreement and related application(s) for land use review or permit on this property. The property owner also acknowledges that should the applicant not reimburse the County of Riverside for all costs related to this application or permit; the property owner shall become immediately liable for these costs which shall be paid within fifteen (15) days of the service by mail of notice to said property owner by the county.
When it is mutually agreed to by the applicant and the department or agency to which a fee applies, any fee not designated as a "Deposit-based Fee:" may be treated and accounted for as a deposit-based fee in the manner established in paragraphs 1. through 6. of these subsections.
B. Appeal procedure.
Within ten (10) calendar days of receipt of the full accounting of the application costs or request for supplemental deposits, the applicant may request a review of the matter by the appropriate department head, or his/her designee, who shall along with the responsible staff representative, review the cost of processing the application. The department head may, in his or her sole discretion, determine that the costs were or were not appropriate and may then reduce the costs charged. The department head shall, in writing, notify the appealing person of his or her decision within five working days from the date of when the appeal was submitted or from the conclusion of his or her review.
Any responsible party aggrieved by the decision of the department head may, within ten (10) calendar days after the date of mailing of the department head's decision, file a written appeal of the decision with TLMA Administration.
The TLMA Director/Assistant County Executive Officer (Asst. CEO) will review the cost of processing the application and shall consider all information relevant to the issue of costs that is provided, either orally or in written form, by the applicant and staff. The TLMA Director/Asst. CEO may determine that the costs were or were not appropriate and may then reduce the costs charged. The TLMA Director/Asst. CEO shall, in writing, notify the appealing person of its decision within five working days from the conclusion of his or her review.
Any responsible party aggrieved by the decision of the TLMA Director/Asst. CEO may, within ten (10) calendar days after the date of mailing of the TLMA Director/Asst. CEO's decision, file a written appeal of the decision with the board of supervisors. The appeal shall be on the form(s) provided by the clerk of the board of supervisors and shall be accompanied by a filing fee of fifty dollars ($50.00). Upon receipt of the completed appeal, with filing fees, the Clerk of the board shall set the matter for hearing before the board of supervisors not less than ten (10) nor more than thirty (30) calendar days thereafter and shall give written notice of the hearing to the applicant and the TLMA Director/Asst CEO or other department head. The board of supervisors shall render its decision within thirty (30) calendar days following the close of the hearing of the appeal.
Unless appealed, the decision of the department head or TLMA Director/Asst. CEO is final. If the decision of the department head is appealed, then the decision of the TLMA Director/Asst. CEO is final unless appealed. If the decision of the TLMA Director/Asst. CEO is appealed, then the decision of the board of supervisors is final.
Unless appealed, the decision of the department head or TLMA Director/Asst. CEO is final. If the decision of the department head is appealed, then the decision of the TLMA Director/Asst. CEO is final unless appealed. If the decision of the TLMA Director/Asst. CEO is appealed, then the decision of the board of supervisors is final.
(Ord. No. 671.23, § 1.2, 12-17-2024)
4.44.025 - Procedures.¶
Except as otherwise expressly provided below, the provisions of this section shall apply to fees or charges subject to either Government Code Sections 66016 and 66017 (as now adopted or hereafter amended), or to Government Code Section 54985 et seq. (as now adopted or hereafter amended).
A. Notice and public meetings. Prior to either adopting a new fee or charge or approving an increase in an existing fee or charge, the board of supervisors shall hold at least one public meeting, at which oral or written presentations may be made, as part of a regularly scheduled meeting. Notice of the time and place of the meeting, including a general explanation of the matter to be considered, and a statement that the data required by this section is available, shall be mailed at least fourteen (14) calendar days prior to the meeting to any interested party who files a written request with the clerk of the board of supervisors for mailed notice of meetings on new or increased fees or charges. Any written request for such mailed notices shall be valid for one year from the date on which it is filed unless a renewal request is filed. Renewal requests for such mailed notices shall be filed on or before April 1 of each year. The annual fee for sending such notices shall be determined by and shall be paid to the clerk of the board. At least ten (10) calendar days prior to the meeting, the clerk of the board shall post and make available to the public data indicating the amount of cost, or estimated cost, required to provide the service for which the fee or charge is levied, and the revenue sources anticipated to provide the service, including general fund revenues. Any costs incurred by the county in conducting the meeting or meetings required pursuant to this subsection may be recovered from the fees charged for the services which were the subject of the meeting.
B. Action by ordinance or resolution. Any action to adopt a new fee or charge or to approve an increase in an existing fee or charge shall be taken only by ordinance or resolution; provided, however, that any such action shall be taken only by ordinance for any fees subject to Government Code Section 54985 et seq. (as now adopted or hereafter amended). The board of supervisors shall not delegate the authority to adopt a new fee or charge or to increase a fee or service charge.
C. Effective date. Any action adopting a new fee or charge, or increasing a fee or charge adopted, upon a development project, as defined in Government Code Section 66000, which applies to the filing, accepting, approving, or issuing of an application, permit, or entitlement to use shall be enacted in accordance with Government Code Section 54986 (as now adopted or hereafter amended) or Section 66016 (as now adopted or hereafter amended) and shall be effective sixty (60) days following the final action on the adoption of the fee or charge or the increase in the fee or charge.
D. Urgency measures. Notwithstanding any provision of this chapter, the board of supervisors may adopt an interim authorization for a new fee or charge, or increase in a fee or charge, as an urgency measure in accordance with the procedures set forth in subdivision (b) of Government Code Section 66017, as now adopted or hereafter amended.
E. Flat fees. Flat fees are subject to change based on board approved hourly rate.
F. Refund of fees of Ordinance No. 671 for non-deposit-based fees.
- Whenever any application, fee or permit is voided or withdrawn for any reason, the planning department or other applicable department may, in accordance with the refund policy statement adopted by the board of supervisors, refund fees paid, upon the written request of the applicant. If any portion of the application fees has been paid by the department to another jurisdiction, agency, or department for the performance of services related to the application, the department will not refund any such portion of fees until the other jurisdiction, agency, or department authorizes the department to do so. In the absence of such authorization, it will be the applicant's responsibility to contact the other jurisdiction, agency, or department for a refund of the fees paid to it, in accordance with the refund policy statement.
G. One-time fees and surcharges.
At the time of an initial deposit on any application, certain cases may require a one-time fee that shall be deducted from the initial deposit and shall be dedicated to the funds as indicated.
The following surcharges will be placed on all initial deposits on a project, as well as any supplemental deposits that may be made on a project:
a. Administration fee (BOS 12.1 dated 9/4/1998): 1.5%.
b. Land Management System (LMS) (now PLUS) fee (BOS 9.4 dated 4/26/2004): 2.0%.
c. Geographical Information System (GIS) fee (Administrative Action) dated 6/15/1989: 4.0%.
- All surcharges shall be deducted from the total of any deposit on the project.
(Ord. No. 671.23, § 1.3, 12-17-2024)
4.44.030 - Ordinance No. 348 fees.¶
| A. The fees for Ordinance No. 348, relating to land use shall be paid as follows: | |
|---|---|
| 1. Appeal to Planning Commission or board of supervisors Flat-Fee: | $1,200 |
| 2. Change of Zone - Map Deposit-based Fee: | $5,000 |
| 3. Change of Zone - Text Deposit-based Fee: | $10,000 |
| 4. Conditional Use Permit - General (includes Hazardous Waste Facility Siting Permit & Class IV Kennel) Deposit-based Fee: | $10,000 |
| 5. Conditional Use Permit - Cannabis Deposit-based Fee: | $25,000 |
| 6. Conditional Use Permit - Alcohol License, Free-Standing Deposit-based Fee: | $7,500 |
| 7. Extension of Time Flat Fee: | $1,923 |
| 8. General Plan Amendment Deposit-based Fee: | $7,500 |
| 9. Revised Permit (CUP, PUP, PPT, PPW) Deposit-based Fee: | $10,000 |
| 10. Outdoor Advertisement Display (Billboard) Deposit-based Fee: | $7,500 |
| 11. Plot Plan, Transmitted Deposit-based Fee: | $15,000 |
| 12. Plot Plan, Administrative (Including Landscape LSP/ |
$1,500 |
| 13. Public Use Permit Deposit-based Fee: | $10,000 |
| 14. Setback Adjustment Deposit-based Fee: | $270 |
| 15. Specific Plan of Land Use Deposit-based Fee: | $30,000 |
| 16. Specific Plan Amendment Deposit-based Fee: | $15,000 |
| 17. Substantial Conformance, Administrative (No Hearing) Deposit-based Fee: | $1,500 |
| 18. Substantial Conformance, Public Hearing Deposit-based Fee: | $5,000 |
| 19. Temporary Use Permit Deposit-based Fee: | $3,500 |
| 20. Variance Deposit-based Fee: | $1,500 |
| 21. WECS, Accessory Permit Deposit-based Fee: | $5,000 |
| 22. WECS, Commercial Permit Deposit-based Fee: | $20,000 |
| 23. Large Family Day Care Permit Deposit-based Fee: | $255 |
| 24. Minor Temporary Event, less than 500 people Deposit-based Fee: | $500 |
| 25. Minor Temporary Event, equal to or greater than 500 people Deposit-based Fee: | $5,000 |
| 26. Pre-Existing Nonconforming Use Deposit-based Fee: | $1,000 |
| 27. Transportation Department Plan Check for any application under Ordinance No. 348 which requires road work design or improvements not otherwise provided for under Ordinance No. 460. | |
| Greater of $500 or 6.5% of estimated cost of construction Deposit-based Fee: | $500 |
| 28. Flood Control Plan Check for any application under Ordinance No. 348 which requires flood control design or improvements. | |
| Lot or site fee Deposit-based Fee: | $50 |
| Plus 3% of the estimated cost of flood control and drainage facilities using the latest Plan Check Deposit Based Fee worksheet (as approved by the Chief Engineer) but not less than $15,000, payable at the Flood Control District. (Maximum deposit not to exceed total estimated plan check fees) | $15,000 |
| 29. Planning Intake Fee Deposit-based Fee: | $250 |
(Ord. No. 671.23, § 2, 12-17-2024)
4.44.040 - Ordinance No. 431 fees.¶
| A. The fees for Ordinance No. 431, regulating and controlling the location and operation of hog ranches, shall be paid as follows: | |
|---|---|
| 1. New Permit Application Fee Deposit-based Fee: | $1,874 |
| 2. Annual Inspection Fee ($17 per 100 hogs with minimum fee required regardless of the number of hogs allowable) | $18 |
| 3. Late fee 25% of the required inspection fee | 25% |
| 4. Amendment of Permit (Change in the number of hogs at Permittee's Option Under Section 10(a)) of Ordinance No. 431 Deposit-based Fee: | $34 |
| 5. Amendment of Permit (Increase in Maximum Allowable Number of Hogs Under Section 10(b)) of Ordinance No. 431 Deposit-based Fee: | $187 |
(Ord. No. 671.23, § 3, 12-17-2024)
4.44.050 - Ordinance No. 458 fees.¶
| A. The fees for Ordinance No. 458, relating to the regulation of flood hazard areas and implementing the National Flood Insurance Program, shall be as follows: | |
|---|---|
| 1. Application Involving Land Which Lies Within the Boundaries of the Maps Described in Section 5 of Ordinance No. 458 (Excluding Paragraph E thereof) Deposit-based Fee: | $1,100 |
| plus a fee for each building shown on application | $200 |
| 2. Application Involving Land Which Lies Within the Boundaries of the Maps Described in Section 5, Paragraph E of Ordinance No. 458 Deposit-based Fee: | $570 |
| Plus a fee for each building shown on the application | $200 |
| 3. Application involving Land previously conditioned, proposing an attached deck or enclosed patio cover or other criteria specified in Ordinance No. 458 eligible for reduced application fee Deposit-based Fee: | $358 |
| 4. Application for Appeal or Variance | |
| a. Clerk of the board of supervisors | $63 |
(Ord. No. 671.23, § 4, 12-17-2024)
4.44.060 - Ordinance No. 460 fees.¶
| A. | The fees for Ordinance No. 460, relating to the division of land shall be paid as follows: | The fees for Ordinance No. 460, relating to the division of land shall be paid as follows: | The fees for Ordinance No. 460, relating to the division of land shall be paid as follows: | The fees for Ordinance No. 460, relating to the division of land shall be paid as follows: | |
|---|---|---|---|---|---|
| 1. | Appeal to Planning Commission or board of supervisors | Appeal to Planning Commission or board of supervisors | Appeal to Planning Commission or board of supervisors | Flat Fee: | $1,200 |
| 2. | Residential Tentative Tract Map | Residential Tentative Tract Map | Residential Tentative Tract Map | Deposit-based Fee: | $15,000 |
| Plus per lot fee | Plus per lot fee | Plus per lot fee | Plus per lot fee | $100 | |
| 3. | Revised Residential Tentative Tract Map | Revised Residential Tentative Tract Map | Revised Residential Tentative Tract Map | Deposit-based Fee: | $10,000 |
| 4. | Tentative Commercial or Industrial Parcel Map | Tentative Commercial or Industrial Parcel Map | Tentative Commercial or Industrial Parcel Map | Deposit-based Fee: | $15,000 |
| 5. | Revised Tentative Commercial or Industrial Parcel Map | Revised Tentative Commercial or Industrial Parcel Map | Revised Tentative Commercial or Industrial Parcel Map | Deposit-based Fee: | $7,500 |
| 6. | Tentative Residential Parcel Map | Tentative Residential Parcel Map | Tentative Residential Parcel Map | Deposit-based Fee: | $10,000 |
| 7. | Revised Tentative Residential Parcel Map | Revised Tentative Residential Parcel Map | Revised Tentative Residential Parcel Map | Deposit-based Fee: | $5,000 |
| 8. | Extension of Time - Tract Map/ |
Extension of Time - Tract Map/ |
Extension of Time - Tract Map/ |
Flat Fee: | $1,866 |
| 9. | Land Division Unit Phasing Map | Land Division Unit Phasing Map | Land Division Unit Phasing Map | Deposit-based Fee: | $500 |
| 10. | Minor Change - Tract Map | Minor Change - Tract Map | Minor Change - Tract Map | Deposit-based Fee: | $1,500 |
| 11. | Minor Change - Parcel Map | Minor Change - Parcel Map | Minor Change - Parcel Map | Deposit-based Fee: | $750 |
| 12. | Reversion to Acreage | Reversion to Acreage | Reversion to Acreage | Deposit-based Fee: | $5,000 |
| 13. | Amendment of Final Tract Map | Amendment of Final Tract Map | Amendment of Final Tract Map | Deposit-based Fee: | $15,000 |
| 14. | Amendment of Final Parcel Map | Amendment of Final Parcel Map | Amendment of Final Parcel Map | Deposit-based Fee: | $5,400 |
| B. Survey Fees: | B. Survey Fees: | B. Survey Fees: | B. Survey Fees: | B. Survey Fees: | |
| 1. | Tract No. or Unit No. (Non-refundable) | Tract No. or Unit No. (Non-refundable) | Tract No. or Unit No. (Non-refundable) | Flat Fee: | $26 |
| 2. | Certificate of Correction Plus recordation fee | Certificate of Correction Plus recordation fee | Certificate of Correction Plus recordation fee | Deposit-based Fee: | $277 |
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | |
| 3. | Certificate of Land Division Compliance Plus Recordation Fee | Certificate of Land Division Compliance Plus Recordation Fee | Certificate of Land Division Compliance Plus Recordation Fee | Flat Fee: | $843 |
| 4. | Certificate of Land Division Compliance, Conditional Plus Recordation Fee | Certificate of Land Division Compliance, Conditional Plus Recordation Fee | Certificate of Land Division Compliance, Conditional Plus Recordation Fee | Deposit-based Fee: | $918 |
| 5. | Certificate of Land Division Compliance with Waiver of Final Parcel Map (Fee Per Parcel) (Does not include Recordation Fee) Plus Recordation Fee | Certificate of Land Division Compliance with Waiver of Final Parcel Map (Fee Per Parcel) (Does not include Recordation Fee) Plus Recordation Fee | Certificate of Land Division Compliance with Waiver of Final Parcel Map (Fee Per Parcel) (Does not include Recordation Fee) Plus Recordation Fee | Deposit-based Fee: | $312 |
| 6. | Lot Line Adjustment | Lot Line Adjustment | Lot Line Adjustment | Flat Fee: | $2,122 |
| a. | 1 to 10 Pages | 1 to 10 Pages | $1,416 | ||
| Additional Fee for 11 and up Pages Plus Recordation Fee | |||||
| 7. | Merger of Contiguous Parcels Plus Recordation Fee | Merger of Contiguous Parcels Plus Recordation Fee | Merger of Contiguous Parcels Plus Recordation Fee | Flat Fee: | $1,352 |
| 8. | Right-of-Way Dedication/ |
Right-of-Way Dedication/ |
Right-of-Way Dedication/ |
Flat Fee: | $2,641 |
| 9. | Final Statutory Condominium Subdivision Map Filing | Final Statutory Condominium Subdivision Map Filing | Final Statutory Condominium Subdivision Map Filing | Deposit-based Fee: | $1,655 |
| Plus per acre ($4,500 maximum) | Plus per acre ($4,500 maximum) | Plus per acre ($4,500 maximum) | Plus per acre ($4,500 maximum) | $50 | |
| 10. | Final Parcel Map Filing | Final Parcel Map Filing | Final Parcel Map Filing | Final Parcel Map Filing | Final Parcel Map Filing |
| a. Schedule "E", "I" & "J" | a. Schedule "E", "I" & "J" | a. Schedule "E", "I" & "J" | Deposit-based Fee: | $3,700 | |
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | ||
| b. Schedules "F" through "H" & "K" | b. Schedules "F" through "H" & "K" | b. Schedules "F" through "H" & "K" | Deposit-based Fee: | $2,200 | |
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | ||
| 11. | Final Subdivision Map Filing | Final Subdivision Map Filing | Final Subdivision Map Filing | Final Subdivision Map Filing | Final Subdivision Map Filing |
| a. | Schedules "A"—"D" | Schedules "A"—"D" | Deposit-based Fee: | $3,700 | |
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | ||
| 12. | Reversion to Acreage Map Filing (All Schedules) | Reversion to Acreage Map Filing (All Schedules) | Reversion to Acreage Map Filing (All Schedules) | Reversion to Acreage Map Filing (All Schedules) | $3,200 |
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | ||
| 13. | Monument Field Inspection Schedule "A"—"I" | Monument Field Inspection Schedule "A"—"I" | Monument Field Inspection Schedule "A"—"I" | Deposit-based Fee: | $3,500 |
| C. Transportation Department Fees | C. Transportation Department Fees | C. Transportation Department Fees | C. Transportation Department Fees | C. Transportation Department Fees | |
| 1. | Plan Checking by the Transportation Department as follows: | Plan Checking by the Transportation Department as follows: | Plan Checking by the Transportation Department as follows: | Plan Checking by the Transportation Department as follows: | |
| a. | At the Time of Filing of Improvement Plans for Checking. | At the Time of Filing of Improvement Plans for Checking. | At the Time of Filing of Improvement Plans for Checking. | ||
| i. | Transportation Department: For Schedule A through D Tract Maps, and Statutory Condominiums, the fee shall be whichever is greater. | Deposit-based Fee: | $2,000 | ||
| or 2% of the estimated street construction cost; | or 2% of the estimated street construction cost; | 2% | |||
| Plus 1% of water and sewer utility construction cost (as approved by the Director of Transportation). | Plus 1% of water and sewer utility construction cost (as approved by the Director of Transportation). | 1% | |||
| ii. | For Schedule "E" through "I" Maps the fee shall be whichever is greater. | Deposit-based Fee: | $2,000 | ||
| or 6% of the estimate street construction cost; | or 6% of the estimate street construction cost; | 6% | |||
| Plus 1% of water and sewer utility construction cost (as approved by the Director of Transportation). | Plus 1% of water and sewer utility construction cost (as approved by the Director of Transportation). | 1% | |||
| b. | At the Time of Filing of Improvement Plans for Signature | At the Time of Filing of Improvement Plans for Signature | Deposit-based Fee: | 2% | |
| 2% of any estimated street construction cost plus 1% of any estimated water and sewer utility construction costs added during plan check (as approved by the Director of Transportation). | 2% of any estimated street construction cost plus 1% of any estimated water and sewer utility construction costs added during plan check (as approved by the Director of Transportation). | 2% | |||
| 2. | Field Inspection, Payable to the Transportation Department prior to Recordation. | Field Inspection, Payable to the Transportation Department prior to Recordation. | Field Inspection, Payable to the Transportation Department prior to Recordation. | Field Inspection, Payable to the Transportation Department prior to Recordation. | |
| a. | Field Inspection Fee | Field Inspection Fee | Deposit-based Fee: | 3% | |
| i. | Transportation Department 3% of road and public facility improvements. | Transportation Department 3% of road and public facility improvements. | |||
| 3. | Center Line Profile Plan Check | Center Line Profile Plan Check | Center Line Profile Plan Check | Deposit-based Fee: | $800 |
| D. | D. | D. | D. | D. | |
| 1. | Plan Checking by Flood Control District as follows: | Plan Checking by Flood Control District as follows: | Plan Checking by Flood Control District as follows: | Plan Checking by Flood Control District as follows: | |
| a. | Flood Control District: Lot or site Fee; | Flood Control District: Lot or site Fee; | Deposit-based Fee: | $50 | |
| i. | 3% of the estimated cost of flood control and drainage facilities using the latest Plan Check Deposit Based Fee worksheet (as approved by the Chief Engineer) but not less than $15,000, payable at the Flood Control District. (Maximum deposit not to exceed total estimated plan check fees) | 3% of the estimated cost of flood control and drainage facilities using the latest Plan Check Deposit Based Fee worksheet (as approved by the Chief Engineer) but not less than $15,000, payable at the Flood Control District. (Maximum deposit not to exceed total estimated plan check fees) | 3% | ||
| b. | At the Time of Filing of Improvement Plans for Signature: | At the Time of Filing of Improvement Plans for Signature: | At the Time of Filing of Improvement Plans for Signature: | ||
| i. | 3% of the estimated cost of flood control and drainage facilities using the latest Plan Check Deposit Based Fee worksheet (as approved by the Chief Engineer) but not less than $15,000, payable at the Flood Control District. (Maximum deposit not to exceed total estimated plan check fees) | Deposit-based Fee: | 3% | ||
| Field Inspection, Payable to Flood Control District prior to construction. | |||||
| i. | Inspection - Original construction period. For inspection service rendered during the specified construction period (determined by the Chief Engineer), the inspection fee shall be 3% of the bonded value of maintained flood control facilities. | Inspection - Original construction period. For inspection service rendered during the specified construction period (determined by the Chief Engineer), the inspection fee shall be 3% of the bonded value of maintained flood control facilities. | 3% | ||
| ii. | Inspection - Time Extensions If work is complete after the expiration of the specified construction period, a fee of 1% of the bonded value of maintained flood control facilities will be imposed for a three-month time extension and each multiple thereof. A portion of the fee may be refunded on a prorate time based upon the portion of the three-month extension that was unused | Inspection - Time Extensions If work is complete after the expiration of the specified construction period, a fee of 1% of the bonded value of maintained flood control facilities will be imposed for a three-month time extension and each multiple thereof. A portion of the fee may be refunded on a prorate time based upon the portion of the three-month extension that was unused | 1% | ||
| 2. | a. | Flood Control Special Studies: | Flood Control Special Studies: | Deposit-based Fee: | $5,000 |
| If special hydrologic/ |
|||||
| b. | Federal Emergency Management Agency (FEMA) studies | Federal Emergency Management Agency (FEMA) studies | Deposit-based Fee: | $5,000 | |
| i. | Conditional Letter of Map Revision (CLOMR) Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required payable at the Flood Control District. | Conditional Letter of Map Revision (CLOMR) Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required payable at the Flood Control District. | |||
| ii. | CLOMR to LOMR (Letter of Map Revision) Conversion fee shall be paid at the Flood Control District prior to recordation. | Deposit-based Fee: | $2,582 | ||
| 3. | Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
Nothing contained in this subsection shall be construed to prevent or prohibit the imposition of additional or different conditions on the new tentative map. The filing fees contained in the subsection shall be applicable if any changes or alternatives are required to be made to the tentative or final/ |
(Ord. No. 671.23, § 5, 12-17-2024)
4.44.070 - Ordinance No. 547 fees.¶
| The fees for Ordinance No. 547 relating to the implementation of the Alquist-Priolo Special Studies Zones Act, shall be paid to the Planning Department as follows: | |
|---|---|
| 1. Filing of a Geologic Report for Approval Deposit-based Fee: | $800 |
| For a parcel 10 acres in size or less plus a fee for each additional acre | $20 |
| To a maximum fee for additional acreage | $770 |
| 2. Waiver of Geologic Report Deposit-based Fee: | $135 |
| Plus an additional fee upon submission to State Geologist of recommendation of approval of wavier by County Geologist | $344 |
(Ord. No. 671.23, § 6, 12-17-2024)
4.44.080 - Ordinance No. 555 fees.¶
| The fees for Ordinance No. 555, relating to the implementation of the Surface Mining and Reclamation Act of 1975, shall be paid to the Planning Department as follows: | |
|---|---|
| 1. Surface Mining Permit, Revised Permit, Revised Reclamation Plan, or stand-alone Reclamation Plan Deposit-based Fee: | $21,000 |
| 2. Appeal Filing Fee | $1,000 |
| 3. Mine Inspection Fee Deposit-based Fee: | $3,500 |
| 4. Substantial Conformance to a Permit, Reclamation Plan or Interim Management Plan Deposit-based Fee: | $5,000 |
| 5. Mine Administration Fee Deposit-based Fee: | $2,000 |
(Ord. No. 671.23, § 7, 12-17-2024)
4.44.090 - Ordinance No. 559 fees.¶
| The fees for Ordinance No. 559, relating to the removal of trees, shall be paid to the Planning Department as follows: | |
|---|---|
| 1. Application for a Permit to Remove one or more Native Living Trees Deposit-based Fee: | $250 |
(Ord. No. 671.23, § 8, 12-17-2024)
4.44.100 - Ordinance No. 578 fees.¶
| The fees for Ordinance No. 578, providing for the establishment of historic preservation districts shall be paid to the Planning Department as follows: | |
|---|---|
| 1. Historic District Alteration Permit Deposit-based Fee: | $700 |
| 2. Appeal | $120 |
(Ord. No. 671.23, § 9, 12-17-2024)
4.44.110 - Ordinance No. 653 fees.¶
| The fees for Ordinance No. 653, establishing fees for examination of Records of Survey and corner Records by the County Surveyor shall be as follows: | |||||
|---|---|---|---|---|---|
| 1. | Filing a Record of Survey | Filing a Record of Survey | Filing a Record of Survey | Flat Fee: | $854 |
| Plus recording fee | Plus recording fee | Plus recording fee | Plus recording fee | ||
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | |
| a. | Amended Record of Survey | Amended Record of Survey | Flat Fee: | $809 | |
| i. | Plus recording fee | Plus recording fee | |||
| Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | Additional Fee for purposes of financing the costs of maintaining the index of the documents per CA Government Code 66466 Subdivision F. | $14 | |||
| 2. | Filing a Corner Record | Filing a Corner Record | Filing a Corner Record | Flat Fee: | $17 |
(Ord. No. 671.23, § 10, 12-17-2024)
4.44.120 - Ordinance No. 752.¶
| The fees for Ordinance No. 752, relating to the establishment of a Pre-Application Review (PAR) Procedure, shall be paid to the Planning Department and shall be as follows: | |||||
|---|---|---|---|---|---|
| a. | Pre-Application Review Deposit-based Fee: | Pre-Application Review Deposit-based Fee: | Pre-Application Review Deposit-based Fee: | Pre-Application Review Deposit-based Fee: | $5,000 |
(Ord. No. 671.23, § 11, 12-17-2024)
4.44.130 - Ordinance No. 787 fees.¶
| The fees for Ordinance No. 787, relating to fire protection regulations shall be paid to the Fire Department as follows: | |||||
|---|---|---|---|---|---|
| A. | Construction, Development & New or Modified/ |
Construction, Development & New or Modified/ |
Construction, Development & New or Modified/ |
Deposit-based Fee: | |
| 1. | Commercial Building | Commercial Building | Commercial Building | Commercial Building | $485 |
| 2. | Commercial Site Plan Review | Commercial Site Plan Review | Commercial Site Plan Review | Commercial Site Plan Review | $354 |
| 3. | Commercial Building Tenant Improvement | Commercial Building Tenant Improvement | Commercial Building Tenant Improvement | Commercial Building Tenant Improvement | $354 |
| 4. | Commercial/ |
Commercial/ |
Commercial/ |
Commercial/ |
$701 |
| 5. | Commercial/ |
Commercial/ |
Commercial/ |
Commercial/ |
$397 |
| 6. | Commercial/ |
Commercial/ |
Commercial/ |
Commercial/ |
$266 |
| 7. | Commercial/ |
Commercial/ |
Commercial/ |
Commercial/ |
$308 |
| 8. | Residential Site Plan Review | Residential Site Plan Review | Residential Site Plan Review | Flat Fee: | $138 |
| 9. | Residential Building/ |
Residential Building/ |
Residential Building/ |
Flat Fee: | $170 |
| 10. | Residential Fire Sprinkler NFPA 13D (or equivalent) System | Residential Fire Sprinkler NFPA 13D (or equivalent) System | Residential Fire Sprinkler NFPA 13D (or equivalent) System | Residential Fire Sprinkler NFPA 13D (or equivalent) System | $478 |
| 11. | Residential Fire Sprinkler Tract Production Home NFPA 13D or equivalent) System Rough & Final Inspection | Residential Fire Sprinkler Tract Production Home NFPA 13D or equivalent) System Rough & Final Inspection | Residential Fire Sprinkler Tract Production Home NFPA 13D or equivalent) System Rough & Final Inspection | Flat Fee: | $128 |
| 12. | Residential Fire Sprinkler Tract Production Home NFPA 13D (or equivalent) System Reinspection | Residential Fire Sprinkler Tract Production Home NFPA 13D (or equivalent) System Reinspection | Residential Fire Sprinkler Tract Production Home NFPA 13D (or equivalent) System Reinspection | Flat Fee: | $85 |
| 13. | Fire Alarm (New and Modification) | Fire Alarm (New and Modification) | Fire Alarm (New and Modification) | Fire Alarm (New and Modification) | $439 |
| 14. | Fire Alarm Communications Module Modification | Fire Alarm Communications Module Modification | Fire Alarm Communications Module Modification | Flat Fee: | $308 |
| 15. | Commercial Cooking Fire Suppression System | Commercial Cooking Fire Suppression System | Commercial Cooking Fire Suppression System | Commercial Cooking Fire Suppression System | $397 |
| 16. | Fire Protection Water Supply (New and Modification) | Fire Protection Water Supply (New and Modification) | Fire Protection Water Supply (New and Modification) | Fire Protection Water Supply (New and Modification) | $609 |
| 17. | Hazardous Materials Review including HMIS/ |
Hazardous Materials Review including HMIS/ |
Hazardous Materials Review including HMIS/ |
Hazardous Materials Review including HMIS/ |
$492 |
| 18. | High Piled Combustible Storage | High Piled Combustible Storage | High Piled Combustible Storage | High Piled Combustible Storage | $354 |
| 19. | Storage Rack Configuration Review | Storage Rack Configuration Review | Storage Rack Configuration Review | Storage Rack Configuration Review | $354 |
| 20. | Technical Report/ |
Technical Report/ |
Technical Report/ |
Technical Report/ |
$368 |
| 21. | Cell Tower Site/ |
Cell Tower Site/ |
Cell Tower Site/ |
Cell Tower Site/ |
$308 |
| 22. | Cell Tower Modification | Cell Tower Modification | Cell Tower Modification | Flat Fee: | $138 |
| 23. | Fire Protection Plan/ |
Fire Protection Plan/ |
Fire Protection Plan/ |
Fire Protection Plan/ |
$538 |
| 24. | Emergency Radio Repeater Coverage System | Emergency Radio Repeater Coverage System | Emergency Radio Repeater Coverage System | Emergency Radio Repeater Coverage System | $446 |
| The fees for Ordinance No. 787, relating to fire protection regulations shall be paid to the Fire Department as follows: | |||||
|---|---|---|---|---|---|
| 25. | Tract Water/ |
Tract Water/ |
Tract Water/ |
Tract Water/ |
$354 |
| 26. | Fire Pump | Fire Pump | Fire Pump | Fire Pump | $708 |
| 27. | Other Building Systems (including CO 2 Systems, Refrigeration, Medical Gas, Standpipes, Gas Detection) | Other Building Systems (including CO 2 Systems, Refrigeration, Medical Gas, Standpipes, Gas Detection) | Other Building Systems (including CO 2 Systems, Refrigeration, Medical Gas, Standpipes, Gas Detection) | Other Building Systems (including CO 2 Systems, Refrigeration, Medical Gas, Standpipes, Gas Detection) | $354 |
| 28. | Fuel Dispensing | Fuel Dispensing | Fuel Dispensing | Fuel Dispensing | $354 |
| 29. | Smoke Control System | Smoke Control System | Smoke Control System | Smoke Control System | $708 |
| 30. | Change of Tenant Permit | Change of Tenant Permit | Change of Tenant Permit | Flat Fee: | $262 |
| 31. | Special Event/ |
Special Event/ |
Special Event/ |
Special Event/ |
$184 |
| 32. | Pyrotechnic Outdoor Display | Pyrotechnic Outdoor Display | Pyrotechnic Outdoor Display | Pyrotechnic Outdoor Display | $524 |
| 33. | Special Effects for Filming | Special Effects for Filming | Special Effects for Filming | Special Effects for Filming | $864 |
| 34. | Stage Pyrotechnics | Stage Pyrotechnics | Stage Pyrotechnics | Stage Pyrotechnics | $524 |
| 35. | Fireworks Retail Booth | Fireworks Retail Booth | Fireworks Retail Booth | Fireworks Retail Booth | $524 |
| 36. | On-Demand Mobile Fueling Area | On-Demand Mobile Fueling Area | On-Demand Mobile Fueling Area | On-Demand Mobile Fueling Area | $354 |
| 37. | Polanco Park/ |
Polanco Park/ |
Polanco Park/ |
Polanco Park/ |
$531 |
| 38. | Alternative Automatic Fire Extinguishing System | Alternative Automatic Fire Extinguishing System | Alternative Automatic Fire Extinguishing System | Alternative Automatic Fire Extinguishing System | $531 |
| 39. | Above Ground Flammable/ |
Above Ground Flammable/ |
Above Ground Flammable/ |
Above Ground Flammable/ |
$354 |
| 40. | Fire Will Serve Letter | Fire Will Serve Letter | Fire Will Serve Letter | Flat Fee: | $138 |
| 41. | Energy Storage Systems | Energy Storage Systems | Energy Storage Systems | Energy Storage Systems | $354 |
| 42. | Solar Photovoltaic System | Solar Photovoltaic System | Solar Photovoltaic System | Solar Photovoltaic System | $354 |
| 43. | Model Rocketry | Model Rocketry | Model Rocketry | Model Rocketry | $138 |
| 44. | Traffic Calming Device Review | Traffic Calming Device Review | Traffic Calming Device Review | Traffic Calming Device Review | $184 |
| 45. | Other Regulated Systems and Equipment | Other Regulated Systems and Equipment | Other Regulated Systems and Equipment | Other Regulated Systems and Equipment | $354 |
| 46. | Fire and Life Safety Conceptual Project Review | Fire and Life Safety Conceptual Project Review | Fire and Life Safety Conceptual Project Review | Fire and Life Safety Conceptual Project Review | $184 |
| 47. | Phasing Maps | Phasing Maps | Phasing Maps | Phasing Maps | $92 |
| 48. | Environmental Constraint Maps | Environmental Constraint Maps | Environmental Constraint Maps | Environmental Constraint Maps | $92 |
| 49. | Certificate of Compliance | Certificate of Compliance | Certificate of Compliance | Certificate of Compliance | $276 |
| 50. | All Other Required/ |
All Other Required/ |
All Other Required/ |
All Other Required/ |
$184 |
| 51. | All Other Required/ |
All Other Required/ |
All Other Required/ |
All Other Required/ |
$170 |
| 52. | Expedite Plan Review Fee - As Available | Expedite Plan Review Fee - As Available | Expedite Plan Review Fee - As Available | Expedite Plan Review Fee - As Available | Double Fee |
| 53. | Work Done Without Approved Permit | Work Done Without Approved Permit | Work Done Without Approved Permit | Work Done Without Approved Permit | Double Fee |
| B. | Fire Code Operational Permits | Fire Code Operational Permits | Fire Code Operational Permits | Flat Fee: | |
| 1. | Additive Manufacturing | Additive Manufacturing | Additive Manufacturing | Additive Manufacturing | $85 |
| 2. | Aerosol Products | Aerosol Products | Aerosol Products | Aerosol Products | $85 |
| 3. | Amusement Building | Amusement Building | Amusement Building | Amusement Building | $128 |
| 4. | Aviation Facilities | Aviation Facilities | Aviation Facilities | Aviation Facilities | $170 |
| 5. | Cellulose Nitrate Film | Cellulose Nitrate Film | Cellulose Nitrate Film | Cellulose Nitrate Film | $85 |
| 6. | Combustible Dust-Producing Operations | Combustible Dust-Producing Operations | Combustible Dust-Producing Operations | Combustible Dust-Producing Operations | $85 |
| 7. | Combustible Fibers | Combustible Fibers | Combustible Fibers | Combustible Fibers | $128 |
| The fees for Ordinance No. 787, relating to fire protection regulations shall be paid to the Fire Department as follows: | |||||
|---|---|---|---|---|---|
| 8. | Compressed Gases | Compressed Gases | Compressed Gases | Compressed Gases | $170 |
| 9. | Covered and Open Mall Buildings | Covered and Open Mall Buildings | Covered and Open Mall Buildings | Covered and Open Mall Buildings | $213 |
| 10. | Cryogenic Fluids | Cryogenic Fluids | Cryogenic Fluids | Cryogenic Fluids | $170 |
| 11. | Cutting and Welding | Cutting and Welding | Cutting and Welding | Cutting and Welding | $85 |
| 12. | Dry Cleaning | Dry Cleaning | Dry Cleaning | Dry Cleaning | $170 |
| 13. | Energy Storage Systems | Energy Storage Systems | Energy Storage Systems | Energy Storage Systems | $255 |
| 14. | Exhibits and Trade Shows | Exhibits and Trade Shows | Exhibits and Trade Shows | Exhibits and Trade Shows | $170 |
| 15. | Explosives | Explosives | Explosives | Explosives | $340 |
| 16. | Fire Hydrants and Valves | Fire Hydrants and Valves | Fire Hydrants and Valves | Fire Hydrants and Valves | $85 |
| 17. | Flammable and Combustible Liquids | Flammable and Combustible Liquids | Flammable and Combustible Liquids | Flammable and Combustible Liquids | $128 |
| 18. | Floor Finishing | Floor Finishing | Floor Finishing | Floor Finishing | $85 |
| 19. | Hazardous Materials | Hazardous Materials | Hazardous Materials | Hazardous Materials | $170 |
| 20. | HPM Facilities | HPM Facilities | HPM Facilities | HPM Facilities | $128 |
| 21. | High Piled Combustible Storage < 12,000 Square Feet | High Piled Combustible Storage < 12,000 Square Feet | High Piled Combustible Storage < 12,000 Square Feet | High Piled Combustible Storage < 12,000 Square Feet | $128 |
| 22. | High Piled Combustible Storage 12,001—50,000 Square Feet | High Piled Combustible Storage 12,001—50,000 Square Feet | High Piled Combustible Storage 12,001—50,000 Square Feet | High Piled Combustible Storage 12,001—50,000 Square Feet | $340 |
| 23. | High Piled Combustible Storage 50,001—500,000 Square Feet | High Piled Combustible Storage 50,001—500,000 Square Feet | High Piled Combustible Storage 50,001—500,000 Square Feet | High Piled Combustible Storage 50,001—500,000 Square Feet | $595 |
| 24. | High Piled Combustible Storage >500,000 Square Feet | High Piled Combustible Storage >500,000 Square Feet | High Piled Combustible Storage >500,000 Square Feet | High Piled Combustible Storage >500,000 Square Feet | $765 |
| 25. | Hot Work Operation | Hot Work Operation | Hot Work Operation | Hot Work Operation | $85 |
| 26. | Industrial Ovens | Industrial Ovens | Industrial Ovens | Industrial Ovens | $85 |
| 27. | Lumber Yard and Woodworking Plants | Lumber Yard and Woodworking Plants | Lumber Yard and Woodworking Plants | Lumber Yard and Woodworking Plants | $170 |
| 28. | Liquid- or Gas-Fueled Vehicles or Equipment in Assembly Buildings | Liquid- or Gas-Fueled Vehicles or Equipment in Assembly Buildings | Liquid- or Gas-Fueled Vehicles or Equipment in Assembly Buildings | Liquid- or Gas-Fueled Vehicles or Equipment in Assembly Buildings | $85 |
| 29. | LP-gas | LP-gas | LP-gas | LP-gas | $128 |
| 30. | Magnesium | Magnesium | Magnesium | Magnesium | $85 |
| 31. | Miscellaneous Combustible Storage | Miscellaneous Combustible Storage | Miscellaneous Combustible Storage | Miscellaneous Combustible Storage | $170 |
| 32. | Mobile Fueling of Hydrogen-Fueled Vehicles | Mobile Fueling of Hydrogen-Fueled Vehicles | Mobile Fueling of Hydrogen-Fueled Vehicles | Mobile Fueling of Hydrogen-Fueled Vehicles | $128 |
| 33. | Motor Fuel-Dispensing Facilities | Motor Fuel-Dispensing Facilities | Motor Fuel-Dispensing Facilities | Motor Fuel-Dispensing Facilities | $128 |
| 34. | Open Burning | Open Burning | Open Burning | Open Burning | $85 |
| 35. | Open Flames and Torches | Open Flames and Torches | Open Flames and Torches | Open Flames and Torches | $85 |
| 36. | Open Flames and Candles | Open Flames and Candles | Open Flames and Candles | Open Flames and Candles | $85 |
| 37. | Organic Coatings | Organic Coatings | Organic Coatings | Organic Coatings | $128 |
| 38. | Outdoor Assembly Event | Outdoor Assembly Event | Outdoor Assembly Event | Outdoor Assembly Event | $340 |
| 39. | Places of Assembly | Places of Assembly | Places of Assembly | Places of Assembly | $128 |
| 40. | Plant Extraction Systems | Plant Extraction Systems | Plant Extraction Systems | Plant Extraction Systems | $170 |
| 41. | Private Fire Hydrant | Private Fire Hydrant | Private Fire Hydrant | Private Fire Hydrant | $85 |
| 42. | Pyrotechnic Special Effects Material | Pyrotechnic Special Effects Material | Pyrotechnic Special Effects Material | Pyrotechnic Special Effects Material | $340 |
| 43. | Pyroxylin Plastics | Pyroxylin Plastics | Pyroxylin Plastics | Pyroxylin Plastics | $85 |
| 44. | Refrigeration Equipment | Refrigeration Equipment | Refrigeration Equipment | Refrigeration Equipment | $170 |
| 45. | Repair Garages and Motor Fuel-Dispensing Facilities | Repair Garages and Motor Fuel-Dispensing Facilities | Repair Garages and Motor Fuel-Dispensing Facilities | Repair Garages and Motor Fuel-Dispensing Facilities | $298 |
| 46. | Rooftop Heliports | Rooftop Heliports | Rooftop Heliports | Rooftop Heliports | $128 |
| 47. | Spraying or Dipping Operations | Spraying or Dipping Operations | Spraying or Dipping Operations | Spraying or Dipping Operations | $85 |
| The fees for Ordinance No. 787, relating to fire protection regulations shall be paid to the Fire Department as follows: | |||||
|---|---|---|---|---|---|
| 48. | Storage of Scrap Tires and Tire Byproducts | Storage of Scrap Tires and Tire Byproducts | Storage of Scrap Tires and Tire Byproducts | Storage of Scrap Tires and Tire Byproducts | $85 |
| 49. | Temporary Membrane Structures and Tents | Temporary Membrane Structures and Tents | Temporary Membrane Structures and Tents | Temporary Membrane Structures and Tents | $255 |
| 50. | Tire-Rebuilding Plants | Tire-Rebuilding Plants | Tire-Rebuilding Plants | Tire-Rebuilding Plants | $85 |
| 51. | Waste Handling | Waste Handling | Waste Handling | Waste Handling | $128 |
| 52. | Wood Products | Wood Products | Wood Products | Wood Products | $128 |
| 53. | Lithium Batteries | Lithium Batteries | Lithium Batteries | Lithium Batteries | $128 |
| 54. | Other Operational Permits | Other Operational Permits | Other Operational Permits | Other Operational Permits | $128 |
| C. | Fire & Life Safety Inspections (Includes Initial and One Re-Inspection) | Fire & Life Safety Inspections (Includes Initial and One Re-Inspection) | Fire & Life Safety Inspections (Includes Initial and One Re-Inspection) | Flat Fee: | |
| 1. | All Occupancies/ |
All Occupancies/ |
All Occupancies/ |
All Occupancies/ |
|
| a. | 3,600 Square Feet | 3,600 Square Feet | 3,600 Square Feet | $170 | |
| b. | 3,600—25,000 Square Feet | 3,600—25,000 Square Feet | 3,600—25,000 Square Feet | $255 | |
| c. | 25,001—50,000 Square Feet | 25,001—50,000 Square Feet | 25,001—50,000 Square Feet | $340 | |
| d. | 50,001—350,000 Square Feet | 50,001—350,000 Square Feet | 50,001—350,000 Square Feet | $510 | |
| e. | 350,001—750,000 Square Feet | 350,001—750,000 Square Feet | 350,001—750,000 Square Feet | $765 | |
| f. | >750,000 Square Feet | >750,000 Square Feet | >750,000 Square Feet | $1,105 | |
| 2. | R-1 Occupancies (Ex. Hotels & Motels) | R-1 Occupancies (Ex. Hotels & Motels) | R-1 Occupancies (Ex. Hotels & Motels) | Flat Fee: | |
| a. | <25 units | <25 units | <25 units | $170 | |
| b. | 26—50 units | 26—50 units | 26—50 units | $255 | |
| c. | 51—75 units | 51—75 units | 51—75 units | $340 | |
| d. | 76—100 units | 76—100 units | 76—100 units | $425 | |
| e. | >100 units | >100 units | >100 units | $510 | |
| Per additional 10 units | Per additional 10 units | Per additional 10 units | $26 | ||
| 3. | R-2 (Ex. Apartments) | R-2 (Ex. Apartments) | R-2 (Ex. Apartments) | Flat Fee: | |
| a. | 3—16 units | 3—16 units | 3—16 units | $170 | |
| b. | 17—25 units | 17—25 units | 17—25 units | $255 | |
| c. | 26—50 units | 26—50 units | 26—50 units | $340 | |
| d. | 51—75 units | 51—75 units | 51—75 units | $425 | |
| e. | 76—100 units | 76—100 units | 76—100 units | $510 | |
| f. | >100 units | >100 units | >100 units | $595 | |
| Per additional 10 units | Per additional 10 units | Per additional 10 units | $26 | ||
| 4. | R-2.1/R-4 Occupancies | R-2.1/R-4 Occupancies | R-2.1/R-4 Occupancies | Flat Fee: | |
| a. | Care Facility Commercial 0—50 Clients | Care Facility Commercial 0—50 Clients | Care Facility Commercial 0—50 Clients | $255 | |
| b. | Care Facility Commercial 51—99 Clients | Care Facility Commercial 51—99 Clients | Care Facility Commercial 51—99 Clients | $340 | |
| c. | Care Facility Commercial 100—150 Clients | Care Facility Commercial 100—150 Clients | Care Facility Commercial 100—150 Clients | $425 | |
| d. | Care Facility ≥151 Clients | Care Facility ≥151 Clients | Care Facility ≥151 Clients | $510 | |
| 5. | Other Occupancies | Other Occupancies | Other Occupancies | Flat Fee: | |
| a. | High Rise Building | High Rise Building | High Rise Building | $1,360 | |
| b. | Mobile Home Park | Mobile Home Park | Deposit-based Fee: | $170 | |
| c. | Day Care Facility Residential 9—14 Clients Fire Clearance | Day Care Facility Residential 9—14 Clients Fire Clearance | Day Care Facility Residential 9—14 Clients Fire Clearance | $128 | |
| d. | Day Care Facility Commercial 0—50 Clients | Day Care Facility Commercial 0—50 Clients | Day Care Facility Commercial 0—50 Clients | $128 | |
| e. | Day Care Facility Commercial 51—100 Clients | Day Care Facility Commercial 51—100 Clients | Day Care Facility Commercial 51—100 Clients | $187 | |
| f. | Day Care Facility Commercial 101—150 Clients | Day Care Facility Commercial 101—150 Clients | Day Care Facility Commercial 101—150 Clients | $247 | |
| g. | Day Care Facility Commercial >150 Clients | Day Care Facility Commercial >150 Clients | Day Care Facility Commercial >150 Clients | $306 | |
| 6. | Miscellaneous Inspection Fees | Miscellaneous Inspection Fees | Miscellaneous Inspection Fees | Deposit-based Fee: | |
| a. | Pre-Inspection Fee | Pre-Inspection Fee | Pre-Inspection Fee | $170 | |
| b. | State License Application Update | State License Application Update | State License Application Update | $170 | |
| c. | On-Demand Mobile Fueling Fleet Inspection | On-Demand Mobile Fueling Fleet Inspection | On-Demand Mobile Fueling Fleet Inspection | $170 | |
| d. | Defensible Space Inspection | Defensible Space Inspection | Flat Fee: | $170 |
| The fees for Ordinance No. 787, relating to fire protection regulations shall be paid to the Fire Department as follows: | |||||
|---|---|---|---|---|---|
| e. | 3rd+ Inspection/ |
3rd+ Inspection/ |
3rd+ Inspection/ |
$170 | |
| D. Other Fees | D. Other Fees | D. Other Fees | D. Other Fees | Deposit-based Fee: | |
| Other Requested/ |
Other Requested/ |
Other Requested/ |
Other Requested/ |
$170 | |
| Other Requested/ |
Other Requested/ |
Other Requested/ |
Other Requested/ |
$184 | |
| Fire Planning Review (Partner City) | Fire Planning Review (Partner City) | Fire Planning Review (Partner City) | Hourly: | Hourly per Adopted Productive Hourly Rate |
(Ord. No. 671.23, § 12, 12-17-2024)
4.44.140 - Ordinance No. 847 fees.¶
The fees for Ordinance No. 847, relating to the Regulation of Noise and shall be paid to the Planning Department, and shall be as follows:
| 1. | Single Event or Continuous Event Deposit-based Fee: | Single Event or Continuous Event Deposit-based Fee: | Single Event or Continuous Event Deposit-based Fee: | Single Event or Continuous Event Deposit-based Fee: | $1,000 |
|---|
(Ord. No. 671.23, § 13, 12-17-2024)
4.44.150 - Ordinance No. 927 fees.¶
The fees for Ordinance No. 927, relating to the registration fee and annual renewal fee of Short-Term Rentals, shall be paid as follows:
| 1. | Short-Term Rental Registration Fee | Short-Term Rental Registration Fee | Short-Term Rental Registration Fee | Flat Fee: | $740 |
|---|---|---|---|---|---|
| 2. | Short-Term Rental Renewal Registration Fee | Short-Term Rental Renewal Registration Fee | Short-Term Rental Renewal Registration Fee | Flat Fee: | $540 |
(Ord. No. 671.23, § 14, 12-17-2024)
4.44.160 - Rules for Riverside County Implementing the California Environmental Quality Act (CEQA).¶
The fees and EIR deposits for environmental review pursuant to the "Rules for Riverside County Implementing the California Environmental Quality Act" shall be as follows:
| A. | No Fee Shall Be Required for the Following Projects: | No Fee Shall Be Required for the Following Projects: | No Fee Shall Be Required for the Following Projects: | No Fee Shall Be Required for the Following Projects: | |
|---|---|---|---|---|---|
| 1. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an Initial Study is conducted to determine if the project is exempt. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an Initial Study is conducted to determine if the project is exempt. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an Initial Study is conducted to determine if the project is exempt. | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an Initial Study is conducted to determine if the project is exempt. | |
| 2. | County projects when the fee will be paid into the same fund into which it is deposited. | County projects when the fee will be paid into the same fund into which it is deposited. | County projects when the fee will be paid into the same fund into which it is deposited. | County projects when the fee will be paid into the same fund into which it is deposited. | |
| 3. | Requests to improve and accept a road into the County Maintained Road System. | Requests to improve and accept a road into the County Maintained Road System. | Requests to improve and accept a road into the County Maintained Road System. | Requests to improve and accept a road into the County Maintained Road System. | |
| 4. | Preparation of an Initial Study on an application to change the zoning classification on a parcel when the application is required to be filed as a condition of approval on a previously approved application. | Preparation of an Initial Study on an application to change the zoning classification on a parcel when the application is required to be filed as a condition of approval on a previously approved application. | Preparation of an Initial Study on an application to change the zoning classification on a parcel when the application is required to be filed as a condition of approval on a previously approved application. | Preparation of an Initial Study on an application to change the zoning classification on a parcel when the application is required to be filed as a condition of approval on a previously approved application. | |
| B. | The fees required for requests to conduct an Initial Study relating to the following application shall be paid to the Planning Department as follows: | The fees required for requests to conduct an Initial Study relating to the following application shall be paid to the Planning Department as follows: | The fees required for requests to conduct an Initial Study relating to the following application shall be paid to the Planning Department as follows: | The fees required for requests to conduct an Initial Study relating to the following application shall be paid to the Planning Department as follows: | |
| 1. | Applications for Stand-Alone Projects Deposit-based Fee: | Applications for Stand-Alone Projects Deposit-based Fee: | Applications for Stand-Alone Projects Deposit-based Fee: | Applications for Stand-Alone Projects Deposit-based Fee: | $5,000 |
| C. | The fees for the preparation of the following environmental report shall be paid to the Planning Department as follows: | The fees for the preparation of the following environmental report shall be paid to the Planning Department as follows: | The fees for the preparation of the following environmental report shall be paid to the Planning Department as follows: | The fees for the preparation of the following environmental report shall be paid to the Planning Department as follows: | |
| 1. | Geologic Report Review Deposit-based Fee: | Geologic Report Review Deposit-based Fee: | Geologic Report Review Deposit-based Fee: | Geologic Report Review Deposit-based Fee: | $800 |
| D. | The fees for the preparation of the following special studies shall be paid to the Flood Control District as follows: | The fees for the preparation of the following special studies shall be paid to the Flood Control District as follows: | The fees for the preparation of the following special studies shall be paid to the Flood Control District as follows: | The fees for the preparation of the following special studies shall be paid to the Flood Control District as follows: | |
| 1. | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | $750 |
| If special hydrologic/ |
|||||
| 2. | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | Flood Control Special Studies Deposit-based Fee: | $3,000 |
| If special hydrologic/ |
|||||
| 3. | Federal Emergency Management Agency (FEMA) studies | Federal Emergency Management Agency (FEMA) studies | Federal Emergency Management Agency (FEMA) studies | Federal Emergency Management Agency (FEMA) studies | |
| a. | Conditional Letter of Map Revision (CLOMR) Deposit-based Fee: | Conditional Letter of Map Revision (CLOMR) Deposit-based Fee: | Conditional Letter of Map Revision (CLOMR) Deposit-based Fee: | $5,000 | |
| Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | |||||
| b. | CLOMR to LOMR (Letter of Map Revision) | CLOMR to LOMR (Letter of Map Revision) | CLOMR to LOMR (Letter of Map Revision) | ||
| Conversion fee shall be paid at the Flood Control District prior to recordation. | Conversion fee shall be paid at the Flood Control District prior to recordation. | Deposit-based Fee: | $2,582 | ||
| E. | The fees for the preparation of the following special studies shall be paid to the Transportation Department as follows: | The fees for the preparation of the following special studies shall be paid to the Transportation Department as follows: | The fees for the preparation of the following special studies shall be paid to the Transportation Department as follows: | The fees for the preparation of the following special studies shall be paid to the Transportation Department as follows: | |
| 1. | Traffic Study Analysis | Traffic Study Analysis | Traffic Study Analysis | Deposit-based Fee: | $3,000 |
(Ord. No. 671.23, § 15, 12-17-2024)
4.44.170 - Rules and regulations governing Agricultural Preserves in Riverside County fees.¶
| The fees for Agricultural Preserve Applications pursuant to the Rules and Regulations Governing Agricultural Preserves in Riverside County shall be paid to the Planning Department as follows: | |||||
|---|---|---|---|---|---|
| A. | The appropriate fee, as listed below, shall accompany the application and is not refundable: | The appropriate fee, as listed below, shall accompany the application and is not refundable: | The appropriate fee, as listed below, shall accompany the application and is not refundable: | The appropriate fee, as listed below, shall accompany the application and is not refundable: | |
| 1. | Establishment or Enlargement of an Agricultural Preserve (Applicant Initiated) | Establishment or Enlargement of an Agricultural Preserve (Applicant Initiated) | Establishment or Enlargement of an Agricultural Preserve (Applicant Initiated) | Deposit-based Fee: | $5,000 |
| 2. | Execution of a Land Conservation Contract for Land Within an Established Agricultural Preserve | Execution of a Land Conservation Contract for Land Within an Established Agricultural Preserve | Execution of a Land Conservation Contract for Land Within an Established Agricultural Preserve | Deposit-based Fee: | $750 |
| 3. | Disestablishment or Diminishment of an Agricultural Preserve (Applicant Initiated) | Disestablishment or Diminishment of an Agricultural Preserve (Applicant Initiated) | Disestablishment or Diminishment of an Agricultural Preserve (Applicant Initiated) | Deposit-based Fee: | $5,000 |
| 4. | Disestablishment or Diminishment of an Agricultural Preserve (board of supervisors Initiated) - no fee | Disestablishment or Diminishment of an Agricultural Preserve (board of supervisors Initiated) - no fee | Disestablishment or Diminishment of an Agricultural Preserve (board of supervisors Initiated) - no fee | Disestablishment or Diminishment of an Agricultural Preserve (board of supervisors Initiated) - no fee | |
| 5. | Notice of Non-Renewal | Notice of Non-Renewal | Notice of Non-Renewal | Deposit-based Fee: | $750 |
(Ord. No. 671.23, § 16, 12-17-2024)
4.44.180 - Resolution No. 85-330 fees.¶
| The fees for Resolution No. 85-330, fixing procedures to vacate and accept County highways and property offered for dedication, shall be paid to the County Surveyor as follows: | |||||
|---|---|---|---|---|---|
| A. | Vacation of Public Streets, Highways and Service Easements Pursuant to Streets and Highways Code Section 8300, et seq. | Vacation of Public Streets, Highways and Service Easements Pursuant to Streets and Highways Code Section 8300, et seq. | Vacation of Public Streets, Highways and Service Easements Pursuant to Streets and Highways Code Section 8300, et seq. | Vacation of Public Streets, Highways and Service Easements Pursuant to Streets and Highways Code Section 8300, et seq. | |
| 1. | General Vacation | General Vacation | General Vacation | Deposit-based Fee: | $4,000 |
| 2. | Summary Vacation | Summary Vacation | Summary Vacation | Deposit-based Fee: | $2,500 |
| B. | Street Names | Street Names | Street Names | Deposit-based Fee: | $4,000 |
| 1. | Change Requiring Public Hearings | Change Requiring Public Hearings | Change Requiring Public Hearings | Change Requiring Public Hearings | |
| Plus per additional street name fee | Plus per additional street name fee | Plus per additional street name fee | Plus per additional street name fee | ||
| 2. | Street Name Adoption (Naming Un-Named Easements | Street Name Adoption (Naming Un-Named Easements | Street Name Adoption (Naming Un-Named Easements | Deposit-based Fee: | $2,500 |
(Ord. No. 671.23, § 17, 12-17-2024)
4.44.190 - Resolution No. 1993-131 fees.¶
| The fees for Resolution No. 93-131, a Resolution of the board of supervisors of Riverside County Regarding School Facilities Impact Mitigation, shall be paid to the County of Riverside and deposited into the General Fund, and shall be as follows: | |||||
|---|---|---|---|---|---|
| A. | Decision of the Planning Director regarding certification of any school district mitigation plan. | Decision of the Planning Director regarding certification of any school district mitigation plan. | Decision of the Planning Director regarding certification of any school district mitigation plan. | Decision of the Planning Director regarding certification of any school district mitigation plan. | |
| 1. | Appeals | Appeals | Appeals | Deposit-based Fee: | $743 |
(Ord. No. 671.23, § 18, 12-17-2024)
4.44.200 - Resolution No. 2019-037 fees.¶
| The fees for Resolution No. 2019-037 Establishing Procedures and Requirements for the Consideration of Development Agreements, as now adopted or hereafter amended, shall be paid to the Transportation and Land Management Agency or the Planning Department as provided herein. The fees shall be as follows: | |||||
|---|---|---|---|---|---|
| A. | Each application for a development agreement shall be accompanied by the following fees. The following fees shall also apply to any application to amend or cancel, in whole or in part, a development agreement. | Each application for a development agreement shall be accompanied by the following fees. The following fees shall also apply to any application to amend or cancel, in whole or in part, a development agreement. | Each application for a development agreement shall be accompanied by the following fees. The following fees shall also apply to any application to amend or cancel, in whole or in part, a development agreement. | Deposit-based Fee: | $5,000 |
(Ord. No. 671.23, § 19, 12-17-2024)
4.44.210 - Miscellaneous fees.¶
| The following fees are hereby established to defray the estimated reasonable cost of providing searches of county archives, performing research on planning, flood control, parks, and environmental health information, providing consultation services related to land use matters, as and when requested, reviewing various legal documents, certifying, and checking concrete batch plants and design mixes, and survey services. The fees shall be paid to the Department as indicated herein: | |||||
|---|---|---|---|---|---|
| A. | 1. | Deposit for Planning Research | Deposit for Planning Research | Deposit for Planning Research | Hourly rates as set through the annual budget process. |
| Per hour fee of staff time expended computed at each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | Per hour fee of staff time expended computed at each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | Per hour fee of staff time expended computed at each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | Hourly rates as set through the annual budget process. | ||
| a. | Planning Department | Planning Department | Hourly rates as set through the annual budget process. | ||
| B. | 1. | Flood Control Research/ |
Flood Control Research/ |
Flood Control Research/ |
$65/hr. |
| No fee will be imposed for the first half hour of service; thereafter, however, per hour fee of staff time expended, computed at $16.25 per each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | No fee will be imposed for the first half hour of service; thereafter, however, per hour fee of staff time expended, computed at $16.25 per each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | No fee will be imposed for the first half hour of service; thereafter, however, per hour fee of staff time expended, computed at $16.25 per each ¼ hour, or fraction thereof, for information or documents which are not readily available and accessible. | $65/hr. | ||
| C. | 1. | Environmental Health Department Consultation Fee per hour | Environmental Health Department Consultation Fee per hour | Environmental Health Department Consultation Fee per hour | See Ord. No. 640 for the current rate. |
| D. | 1. | Miscellaneous Survey Case | Miscellaneous Survey Case | Miscellaneous Survey Case | |
| a. | County Surveyor | Deposit-based Fee: | $1,000 | ||
| E. | 1. | Preparation of agreements pursuant to Chapter 6.5 (Section 21178 et seq.) of the California Environmental Quality Act. | Preparation of agreements pursuant to Chapter 6.5 (Section 21178 et seq.) of the California Environmental Quality Act. | Deposit-based Fee: | $5,000 |
| a. | Planning Department | Planning Department | |||
| F. | 1. | Graffiti Sales | Graffiti Sales | Graffiti Sales | |
| a. | License | License | $45 | ||
| b. | License Renewal | License Renewal | $30 | ||
| c. | Annual Inspection based on fully burdened rate, Building Inspector II ½ hr. | Annual Inspection based on fully burdened rate, Building Inspector II ½ hr. | |||
| G. | Preparation of a real property interest agreement for a project involving a solar power plant. | Preparation of a real property interest agreement for a project involving a solar power plant. | Deposit-based Fee: | $25,000 | |
| a. | Transportation and Land Management Agency | Transportation and Land Management Agency | |||
| H. | Special Multiple Family Development | Special Multiple Family Development | Special Multiple Family Development | Special Multiple Family Development | |
| 1. | Design Review | Design Review | Design Review | Deposit-based Fee: | $5,000 |
| 2. | Streamline Review | Streamline Review | Streamline Review | Deposit-based Fee: | $5,000 |
(Ord. No. 671.23, § 20, 12-17-2024)