Skip to content

Chapter 11.10 — BIDDING ON PUBLIC PROJECTS

Pleasant Hill Municipal Code · 2026-07 edition · updated 2026-09-27 · Pleasant Hill

§ 11.05.010. Definitions.
§ 11.05.020. Permit required.
§ 11.05.030. Application.
§ 11.05.040. Consent to work.
§
§
§
11.05.050.
11.05.060.
11.05.070.
Fees.
Nontransferable.
Display of permits.
§
§
11.05.080.
11.05.090.
Validity – Termination.
Cash deposit or bond.
§ 11.05.100. Commencement of work.
§ 11.05.110. Completion of work.
§ 11.05.120. Conformance to
specifications.
§ 11.05.130. Backfilling.
§ 11.05.140. Trees.
§ 11.05.150. Hedges, plantings and
fences.
§ 11.05.160. Lawn or ground cover.
§ 11.05.170. Mailboxes.
§ 11.05.180. Markings on streets, curbs
and sidewalks.
§ 11.05.190. Monuments.
§ 11.05.200. Movement of vehicles.
§ 11.05.210. Pipes and conduits.
§ 11.05.220. Drainage.
§ 11.05.230. Poles or obstructions.
§ 11.05.240. Poles and transmission line
carriers.
§ 11.05.250. Relocation or removal.
§ 11.05.260. Safety devices and measures.
§
§
§
§
11.05.270.
11.05.280.
11.05.290.
11.05.300.
Interference with use.
Right of lawful use.
Exceptions.
Emergency work
§ 11.05.310. authorization.
Sign encroaching over a
street declared nuisance.
  • § 11.10.010. Purpose – City subject to Uniform Construction Cost Accounting Act.

  • § 11.10.020. Definitions.

  • § 11.10.030. Implementation by director – Delegation.

  • § 11.10.040. Public projects – Work and contracts.

  • § 11.10.050. Contractor list and construction trade journals.

  • § 11.10.060. Informal bidding procedures.

  • § 11.10.070. Formal bidding procedures. § 11.10.080. Rejection of bids – Options – No bids.

  • § 11.10.090. Cost accounting.

  • § 11.10.100. Emergency procedure.

Chapter 11.15 UNDERGROUND UTILITIES

  • Article I

  • General Provisions

  • § 11.15.010. Findings and purpose. § 11.15.020. Definitions. § 11.15.030. Waiver. § 11.15.040. Exceptions.

Article II Underground Utility Zones

  • § 11.15.050. Purpose. § 11.15.060. Scope. § 11.15.070. Underground utility zones created.

  • § 11.15.080. Proceedings for determination.

  • § 11.15.090. Hearing.

PLEASANT HILL CODE

§ 11.15.100. Allocation of costs and § 11.15.170. Action of council.
responsibilities. § 11.15.180. Method of performing work.
§ 11.15.110. Responsibility of § 11.15.190. Authority to enter property
government agency. and perform work.
§ 11.15.120. Notice to utility and § 11.15.200. Report of costs.
property owners. § 11.15.210. Assessments.
§ 11.15.130. Compliance and installation.
Article IV
Article III Construction Standards
Alternate Procedure For Conversion
§ 11.15.220. Compliance.
§ 11.15.140. Failure to install facilities. § 11.15.230. Transformers.
§ 11.15.150. List of nonconverting
property owners. Chapter 11.20
§ 11.15.160. Notice to property owners. PARADES

CHAPTER 11.05 ENCROACHMENTS

§ 11.10.010. Purpose – City subject to Uniform Construction Cost Accounting Act.

The purpose of this chapter is to provide for an alternative method for the bidding of public works projects, as authorized by Public Contract Code section 22000 and following.

The city council elects to become subject to the California Uniform Construction Cost Accounting Act, the procedures set forth in the Act, and to the California Uniform Public Construction Cost Accounting Commission's policies and procedures.

All city departments are subject to this chapter. (Public Contract Code (PCC) §§ 22001 and 22030.)

(1991 code § 2-56.1; Ord. 770 § 1, 2003)

Exceptions & meaning →

§ 11.10.020. Definitions.

  • A. Commission means the California Uniform Construction Cost Accounting Commission established under Public Contract Code section 22010.

  • B. Director means the director of public works and community development.

  • C. Facility means a building, plant, structure, real property, street, highway or other public work improvement.

  • D. Formal bidding procedures means those procedures applicable to a public project of more than $200,000, as set forth in PHMC § 11.10.070.

  • E. Informal bidding procedures means those procedures applicable to a public project of $60,000 to $200,000, as set forth in PHMC § 11.10.060.

  • F. Public project means any of the following:

    1. Construction, reconstruction, erection, alteration, renovation, improvement, demolition or repair work involving any publicly owned, leased, or operated facility; or

  • Painting or repainting of any publicly owned, leased or operated facility.

Public project does not include maintenance work. Maintenance work includes: (1) routine, recurring, and usual work for the preservation or protection of any publicly owned or operated facility for its intended purposes; (2) minor repainting; (3) resurfacing of streets and highways at less than one inch; or (4) landscape maintenance. (PCC § 22002.)

  • G. Uniform Public Construction Cost Accounting Act or the Act means the Act set forth at Public Contract Code section 22000 and following, which provides an alternative method for the bidding of public works projects.

(1991 code § 2-56.2; Ord. 770 § 1, 2003; Ord. 926 § 1, 2019)

Exceptions & meaning →

§ 11.10.030. Implementation by director – Delegation.

  • A. Implementation. The director is responsible for implementing this chapter. The director shall prepare written policies to implement this chapter.

  • B. Delegation. The city council delegates to the director or his or her designee the authority to:

    1. Approve plans, specifications and working details for all public projects, under Public Contract Code section 22039; and

    2. Award contracts for $60,000 or less, as long as the project is in the budget, the contract is approved as to form by the city attorney and the project is in accordance with this chapter.

(1991 code § 2-56.3; Ord. 770 § 1, 2003; Ord. 926 § 2, 2019)

Exceptions & meaning →

§ 11.10.040. Public projects – Work and contracts.

  • A. A public project of $60,000 or less may be performed by the employees of the city by force account, by negotiated contract or by purchase order. A contract or purchase order may be signed by the director and must be approved as to form by the city attorney. (See PHMC § 11.10.030.B.)

  • B. A public project of between $60,000 and $200,000 may be let to contract by the informal bidding procedures set forth in PHMC § 11.10.060.

  • C. A public project of more than $200,000 shall be let to contract by the formal bidding procedures set forth in PHMC § 11.10.070, except as otherwise provided in the Act or in this chapter.

  • D. No project splitting. It is unlawful to split or separate into smaller work orders or projects any project for the purpose of evading the provisions of this chapter. (PCC §§ 22032 and 22033.)

(1991 code § 2-56.4; Ord. 770 § 1, 2003; Ord. 926 § 3, 2019)

Exceptions & meaning →

§ 11.10.050. Contractor list and construction trade journals.

  • A. Contractor list. The director shall maintain a list of qualified contractors eligible to submit bids on informal contracts awarded by the city. The contractors shall be identified according to categories of work. Minimum criteria for development and maintenance of the list of contractors shall be determined by the commission. A contractor wishing to be on the list must first submit a complete application on a form provided by the city. (PCC § 22034.)

  • B. Construction trade journals. The commission determines the appropriate construction trade journals (including builders' exchanges) which shall receive notice of all informal and formal construction contracts being bid for work within Contra Costa County. (PCC §§ 22034, 22036 and 22037.)

(1991 code § 2-56.5; Ord. 770 § 1, 2003)

Exceptions & meaning →

§ 11.10.060. Informal bidding procedures.

A public project of between $60,000 and $200,000 may be let to contract by the informal bidding procedures in this section.

  • A. Notice inviting bids. The director shall mail a notice inviting informal bids to all contractors on the list for the category of work being bid or all construction trade journals specified by the Commission, or both. However, the notice shall be sent only to the construction trade journals if:
  1. The product or service is proprietary in nature such that it can only be obtained from a certain contractor or contractors; or

  2. There is no list of qualified contractors maintained by the city for the particular category of work to be performed.

The city, in its discretion, may notify additional contractors, construction trade journals, or builders' exchanges.

The notice shall be mailed not less than 10 calendar days before bids are due. The notice shall describe the project in general terms and how to obtain more detailed information about the project, and state the time and place for the submission of bids.

  • B. Opening of bids and award of contract. At the time provided in the notice, all bids timely received shall be opened. Unless all bids are rejected, the contract shall be awarded to the lowest responsible bidder.

The city manager is authorized to award contracts up to $200,000 as long as the project is in the budget and the contract is approved as to form by the city attorney. The city manager may approve a project in an emergency situation when funds are available and the contract is approved as to form by the city attorney. (See also PHMC § 11.10.100, Emergency procedure.) If a project between $60,000 and $200,000 is not in the budget and is not an emergency, the contract is awarded only by the city council.

If all bids received are greater than $200,000, the city council may award the contract at $212,500 or less to the lowest responsible bidder, if it determines the cost estimate of the public agency was reasonable. The council must act by passing a resolution, with a fourfifths vote. If the bids are greater than $212,500, the project must be rebid under the formal bidding procedures below. (PCC § 22034.)

(1991 code § 2-56.6; Ord. 770 § 1, 2003; Ord. 926 § 4, 2019)

Exceptions & meaning →

§ 11.10.070. Formal bidding procedures.

  • A. General. A public project of more than $200,000 shall be let to contract by the formal bidding procedures.

  • B. Notice. The notice shall state the time and place for receiving and opening sealed bids and distinctly describe the project. The notice shall be:

    1. Published in a newspaper of general circulation in the city at least 14 calendar days before the bid opening date; and

    2. Mailed to all construction trade journals identified under PHMC § 11.10.050 at least 30 calendar days before the bid opening date.

The city may give any other notice it deems proper. (PCC § 22037.)

  • C. Opening of bids and award of contract. At the time provided in the notice, all bids timely received shall be opened. Unless all bids are rejected, the contract shall be awarded to the lowest responsible bidder. The contract is awarded by resolution of the city council.

  • (1991 code § 2-56.7; Ord. 770 § 1, 2003; Ord. 926 § 5, 2019)

Exceptions & meaning →

§ 11.10.080. Rejection of bids – Options – No bids.

  • A. Rejection of bids. In its discretion, the city may reject any bids presented. If all bids are rejected after the first invitation of bids, the city may re-evaluate its cost estimates of the project and either:

    1. Abandon the project;

    2. Re-advertise for bids; or

    3. Have the project done by force account without further complying with this chapter. In electing this option, the city council shall first adopt a resolution by a four-fifths vote, declaring that the project can be performed more economically by the employees of the city.

  • B. Options. If a contract is awarded, it shall be awarded to the lowest responsible bidder. If two or more bids are the same and the lowest, the city may accept the one it chooses.

  • C. No bids received. If no bids are received through the formal or informal procedure, the project may be performed by negotiated contract or by the employees of the city by force account, without further complying with this chapter. (PCC § 22038.)

  • (1991 code § 2-56.8; Ord. 770 § 1, 2003)

Exceptions & meaning →

§ 11.10.090. Cost accounting.

Whenever the city elects to have its own forces perform work on any public project, the city shall follow cost accounting procedures established by the commission.

The commission may review the city's accounting procedures whenever it receives evidence that work:

  • A. Is to be performed by the city forces after rejection of all bids, claiming work can be done less expensively by the city;

  • B. Exceeds the force account limits;

  • C. Has been improperly classified as maintenance work. (PCC §§ 22017, 22019 and 22042.) (1991 code § 2-56.9; Ord. 770 § 1, 2003)

Exceptions & meaning →

§ 11.10.100. Emergency procedure.

In case of emergency when repair or replacements are necessary, the city may proceed at once to replace or repair any public facility without adopting plans, specifications, strain sheets, or working details, or giving notice for bids to let contracts. The work may be done by day labor under the direction of the director, by contractor, or by a combination of the two. In any such emergency, if notice for bids will not be given, the city shall comply with the procedures in Public Contract Code section 22050 (Emergency Contracting Procedures). These procedures require, before any emergency action is taken, that the city council authorize the action by a fourfifths vote and make a finding based on substantial evidence that: (A) the emergency will not permit a delay resulting from the competitive solicitation for bids, and (B) the action is necessary to respond to the emergency. The council must also review the action at every regular meeting until the action is terminated. (PCC §§ 22035, 22050.) (1991 code § 2-56.10; Ord. 770 § 1, 2003)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Pleasant Hill Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.