Earlier editions: 2026-09
Title 12 — STREETS AND PUBLIC PLACES
Paradise Municipal Code Ch. 12.26 Telecommunications Infrastructure Improvements
Paradise Municipal Code · 2026-10 edition · updated 2026-10-04 · Paradise
Cite as: Paradise Municipal Code Chapter 12.26 · Text as of 2026-10-04
12.26.010 - Purpose and findings.¶
A. It is the intent of the Town of Paradise, in enacting Chapter 12.26 to streamline and simplify the process of installing and upgrading telecommunications equipment throughout the town, and to encourage deployment, improvement and modernization of telecommunications infrastructure; especially in the town's rebuild efforts after the Camp Fire in 2018.
B. The objectives of Chapter 12.26 are the following:
Minimize disruption of the town's public infrastructure, such as paved roads and sidewalks.
Ensuring efficient, non-duplicative placement of infrastructure in the town's right-of-way.
Reducing infrastructure deployment barriers by reducing costs of all underground work in the town's right-of-way for electric or gas utility, telephone or telecommunications companies and internet service providers.
C. Access to modern telecommunications infrastructure is vital for communication, emergency and disaster response, economic development, education, healthcare, among other uses.
D. It is the desire of the town to foster a fair and level playing field for all market competitors that does not disadvantage or advantage one service provider or technology over another.
E. The town seeks to promote widespread access to the most technologically advanced telecommunications services for all town residents and businesses in a nondiscriminatory manner regardless of socioeconomic status; and seeking these services will work as an incentive for residents and businesses to establish in the Town of Paradise.
F. It is the responsibility of the town to protect and control access to public rights-of-way, and ensuring that use of public rights-of-way align with the vision for a resilient and modern Town of Paradise.
G. The town has a duty to ensure that all service providers utilizing town property, facilities or rights-of-way comply with all applicable state and local health, safety and other laws.
H. It is consistent with the town's goals and values to encourage investment in telecommunications infrastructure to ensure access to ubiquitous high-speed internet services to residents, businesses, community anchor institutions, and community organizations, in order to help close the digital divide.
I. It is necessary to update town policies and practices to recognize the authority of the California Public Utilities Commission (CPUC) as established in state and federal statutes.
J. It is the desire of the town to assess fees sufficient to recover the actual costs of providing services but not to discourage improvement of necessary infrastructure.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.015 - Definitions.¶
For the purpose of this chapter, the following definitions apply:
"Company" refers to any electric or gas utility or telephone or telecommunications company, or broadband service provider that is authorized by any government entity or law to provide services or operate in the Town of Paradise.
"Conduit" refers to a tube, duct or other device or structure designed for enclosing telecommunication wires or cables.
"Excavation" refers to any process which removes material from the ground through digging, drilling, boring or other activity for the purpose of installing utilities, infrastructure or other structures or equipment.
"Facilities" and "infrastructure" refers to wires, cables, conduit, switches, transmission equipment or other equipment for use in transmitting or processing telecommunications services or for providing support or connection to such equipment.
"Feasible" refers to capable of being accomplished in a successful manner within a reasonable period of time, taking into account appropriate environmental, physical, legal, economic and technological factors.
"Incremental cost" refers to the cost associated with adding telecommunications cable, conduit and other related equipment to an excavation project, including the cost of the materials needed and any additional labor cost.
"Reconstruction" refers to any project which repairs or replaces fifty (50) percent or more of an existing road, highway or rail line.
"Rights-of-way" ("ROW") refers to the area upon or adjacent to any town-owned road, highway or rail line or along or across any of the waters or lands owned or controlled by the town.
"ROW permit" refers to a permit issued pursuant to this chapter.
"Telecommunications" refer to data, voice, video or other information provided by copper wire, coaxial cable, fiber optic cable or other technology.
"Telecommunications service providers" refers to any person, company, corporation or other entity providing data, voice, cable, video or other information services by wire, fiber optic cable or other technology.
"Town manager" refers to the town manager of the Town of Paradise or his or her designee.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.020 - Telecommunications infrastructure improvement.¶
In recognition of the need to provide local residents and businesses within the community with the infrastructure required to meet their telecommunications needs, this chapter requires the following:
A. No company may undertake any construction, reconstruction, or repaving project involving excavation of the town ROW without first obtaining a ROW permit pursuant to this chapter.
B. No fewer than thirty (30) days prior to a company's intended construction, reconstruction or repaving start date, a written application for a town public ROW permit, along with payment of any fees or deposit required by the town, shall be filed with the town manager or his or her designee, in the form and manner required by the town manager or his or her designee.
C. The ROW application shall contain, at a minimum, all of the following information:
General information regarding any infrastructure and/or equipment that the company plans to apply for permits to install within the ROW in the next six (6) months, regardless of whether a permit is currently sought for the infrastructure and/or equipment.
Site plan of the infrastructure and/or equipment proposed to be located within the ROW, including a map in digital and/or other form required by the town, including digital geographical information system (GIS) formats.
Estimated project start and completion dates.
A traffic control plan, if required, that complies with guidelines established by the town manager or his or her designee.
D. Companies leading construction, reconstruction or repaving projects involving excavation of town rights-of-way shall notify, advise and coordinate with other companies (i.e., telephone or telecommunications companies or broadband service providers) regarding construction work to install telecommunications infrastructure in the right-of-way, to the extent reasonably practical and feasible. This coordination shall be conducted through town or company sponsored coordination meetings. The frequency of the meetings shall be determined in coordination between the town manager or his or her designee and project leading company. As a result of the coordination, installation of or upgrades to telecommunications facilities or infrastructure will be included as needed. In new developments, a company shall contact the developer to determine whether any surplus conduit is available in the areas that the company plans to install facilities or infrastructure, and whether any joint trenching or boring projects are feasible.
E. The town manager or his or her designee shall maintain a list of companies (i.e., telephone and telecommunications companies and broadband service providers) and shall send notifications to these companies regarding construction, reconstruction and repaving projects and coordination to install telecommunications infrastructure in the right-of-way, to the extent reasonably practical and feasible.
F. The town may also determine whether to participate in the installation of telecommunication infrastructure in the construction, reconstruction or repaving projects.
G. When companies or the town participate or join in a construction, reconstruction or repaving project, which involves excavation in the town ROW, by installing telecommunications facilities or infrastructure in such projects, these companies shall be responsible for the ROW permit applicant's incremental costs for installing these facilities and infrastructure.
H. The town manager or his or her designee will work with companies and contractors to identify cost-effective approaches consistent with town requirements.
I. All installations shall be approved by the town manager or his or her designee. Technical specifications for installing telecommunications infrastructure shall be discussed among companies participating in the project and technical specifications may also be developed associated to this chapter.
J. In order to verify that a company has carried out the construction, reconstruction or repaving project in the town ROW pursuant to this chapter, the town reserves the right to inspect the project, as well as to inspect all necessary documents related to said project.
K. There shall be a five-year moratorium on excavating in the town ROW that has been constructed, reconstructed, or repaved in the preceding five (5) years to protect the public infrastructure and maintain the integrity of the pavement and ROW. However, waivers to the moratorium may be granted by the town manager or his or her designee for "good cause," such as:
To repair leaks.
To respond to emergencies.
To provide services to buildings where no other reasonable means of providing service exists.
Other situations deemed by the town manager or his or her designee to be in the best interest of the general public.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.025 - Implementation.¶
No less than fifteen (15) days before this chapter takes effect, the Town of Paradise shall e-mail, fax, mail or deliver a copy of it to all telecommunications service providers and other affected entities doing business within the Town of Paradise.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.030 - Exemptions.¶
A. The town manager or his or her designee, may exempt construction, reconstruction or repaving projects from the requirements of this chapter where compliance is found to be not practical or feasible. Requests for an exemption shall be in writing, and the town manager or his or her designee's decision shall be final.
B. An exemption application shall include all information necessary for the town manager or his or her designee to make a decision, including but not limited to documentation showing factual support for the requested exemption.
C. The town manager or his or her designee may approve the exemption application in whole or in part, with or without conditions.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.035 - Enforcement of this chapter.¶
Enforcement of this chapter shall be as follows:
A. The town manager or his or her designee, shall have primary responsibility for enforcement of this chapter and shall have authority to issue citations for violation of this chapter. The town manager, or his or her designee, is authorized to establish regulations or administrative procedures to ensure compliance with this chapter.
B. A person or entity violating or failing to comply with any of the provisions of this chapter shall be guilty of an infraction.
C. The town manager or his or her designee may seek legal, injunctive, or any other relief to enforce the provisions of this chapter and any regulation or administrative procedure authorized by it.
D. The remedies and penalties provided in this chapter are cumulative and not exclusive of one another.
E. The town manager or his or her designee may inspect the premises of any construction, reconstruction, repaving or excavation project to verify compliance with this chapter.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
12.26.040 - Public nuisance.¶
Violation of this chapter is hereby declared to be a public nuisance. Any violation of this chapter shall be subject to abatement pursuant to Chapter 8.04 of the Paradise Municipal Code.
(Ord. No. 586, § 1, 11-12-2019)
Editor's note— Ord. No. 586 shall take effect thirty (30) days from its passage/adoption.
Get a plain-English answer with a citation back to this text.
Ask AI about this code