Chapter 17 — WASTEWATER COLLECTION AND TREATMENT SERVICES›Article 17-I — Terms And Conditions For The Sale Of Wastewater Collection And Treatment Services
Needles Municipal Code § 10.1 Discharge Permits
Needles Municipal Code · 2026-10 edition · updated 2026-10-21 · Needles
Cite as: Needles Municipal Code § 10.1 · Text as of 2026-10-21
10.1.2 Industrial customers requesting an Industrial Wastewater Discharge Permit shall…¶
a) Name, mailing address, and location of facility b) SIC number, according to the Standard Industrial Classification Manual, Bureau of Budget, 1987, as amended. c) Wastewater constituents and characteristics as measured by a state certified laboratory. d) Time and duration of proposed discharge e) Average daily and peak wastewater flow rates, including any seasonal variances. f) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by the size, location and elevation. g) Description of activities, facilities and plant processes on the premises, including all materials which are or could be discharged h) Whether or not discharge is subject to pretreatment standards (categorical or local), and if such pretreatment will be met on a consistent basis. i) Any other information required by the city to evaluate the application.
10.1.3 Within sixty (60) days after receipt of a completed application, an approved…¶
10.1.4 Industrial Wastewater Discharge Permits shall be subject to all provisions…¶
a) The unit charge or schedule of user charges and fees for the wastewater discharge. b) Limitations on the average and maximum wastewater constituents and characteristics. c) Limitations on the average and maximum flow rate and time of discharge or requirements for flow regulation and equalization. d) Requirements for installation and maintenance of inspection and sampling facilities. e) Specifications for monitoring programs which may include sampling locations, frequency of sampling, number and type and standards for analyses. f) Compliance schedules. g) Requirements for submission of technical or discharge reports. h) Requirements for maintaining and retaining plant records relating to the wastewater discharge. i) Other conditions as deemed appropriate to ensure compliance with the permit, Terms and Conditions, or applicable laws or regulations.
10.1.5 The terms and conditions of an Industrial Wastewater Discharge Permit may be…¶
10.1.6 Permits shall be issued for a specified time period, not to exceed three years.¶
10.1.7 Industrial Wastewater Discharge Permits are issued to a specific customer for a specific operation.¶
Continue researching
Needles sources →Needles local, state and federal sources. Edit the document title or filters, then run your search.
Get a plain-English answer with a citation back to this text.
Ask AI about this code