Los Angeles Municipal Code § 95.116 Connection Approval

Los Angeles Municipal Code · 2026-09 edition · updated 2026-10-04 · Los Angeles

Cite as: Los Angeles Municipal Code § 95.116 · Text as of 2026-10-04

(Amended by Ord. No. 182,848, Eff. 1/3/14.)

95.116.1.

Connection Approval. No equipment regulated by this Code shall be connected to the fuel or power supply until it complies with all applicable requirements of this Code and a final inspection tag of approval

has been issued by the Department.

EXCEPTION: The requirements of this subsection shall not be considered to prohibit the operation of any equipment installed to replace defective equipment serving an occupied portion of a building, in the event a request for inspection of that equipment has been filed with the Department not more than 48 hours after the replacement work is completed and before any portion of the equipment is concealed by any permanent portion of the building.

95.116.2.

Final Inspection. A final inspection tag of approval may, upon notice, be revoked by the Department if the Department finds that the equipment fails in any respect to comply with the requirements of this Code

or that the installation is unsafe, dangerous or a hazard to life or property.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Los Angeles Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.