Earlier editions: 2026-09
Lincoln Municipal Code Ch. 17.48 Monuments
Lincoln Municipal Code · 2026-10 edition · updated 2026-10-04 · Lincoln
Cite as: Lincoln Municipal Code Chapter 17.48 · Text as of 2026-10-04
17.48.010 - Monumentation requirements generally.¶
At the time of making the survey for the final map or parcel map, unless a survey is not required, the engineer or surveyor shall set sufficient durable monuments to conform with the standards prescribed in section 8771 of the Business and Professions Code so that another engineer or surveyor may readily retrace the survey.
(Ord. 347B §4, 1978: Ord. 324B §11-1, 1977)
17.48.020 - Boundary monuments.¶
Monuments shall be set on the exterior boundary of the subdivision at all corners, angle points, beginnings and endings of curves, and at intermediate points as determined by the city engineer to be reasonably necessary to establish the exterior boundaries. The locations of inaccessible points may be established by ties and shall be so noted on the final or parcel map. At least one extension boundary line shall be adequately monumented or referenced prior to recordation of the final map or parcel map.
(Ord. 324B §11-2, 1977)
17.48.030 - Interior monuments.¶
Interior monuments shall be set at all block and lot corners and angle points and at the beginnings and ends of curves, and along street and alley centerlines at the beginnings and ends of curves, at points of intersection with centerlines of other existing and proposed streets and alleys, and at the points of intersection with the exterior boundary lines. Interior property line and centerline monuments and ties may be set after the final map or parcel map is recorded.
(Ord. 324B §11-3, 1977)
17.48.040 - Deferral of setting until after recordation.¶
(a) In the event any or all of the required monuments are to be set after recordation of the final map or parcel map, the engineer or surveyor certificate shall specify the date established by the city engineer by which the monuments will be set. The subdivider shall, prior to the submission of such map to the city engineer for filing, furnish to the city engineer a cash deposit in an amount equal to the estimated cost of setting such deferred monuments.
(b) In the event the deferred monuments are not set within the period of time specified, or within the approved extended period of time, and provided that all improvement work has been completed, the city engineer shall give written notice directing the engineer or surveyor of record to set such monuments within 60 days.
(c) If the engineer or surveyor of record fails to set the monuments within the time specified, the city engineer shall take action to have a substitute engineer or surveyor set the monuments required. The city engineer shall pay the substitute engineer or surveyor from the cash deposit from the subdivider.
(Ord. 324B §11-4, 1977)
17.48.050 - Type, positioning and marks.¶
All monuments set in the course of the survey as required by this title shall be of the type specified by the city engineer and shall be set to the depth and in the manner prescribed therefor. Further, all monuments shall be visibly marked or tagged as required by the city engineer.
(Ord. 324B §11-5, 1977)
17.48.060 - Survey data to be shown on maps.¶
The city engineer shall specify the survey data and information to be shown on each final map or parcel map.
(Ord. 324B §11-6, 1977)
Get a plain-English answer with a citation back to this text.
Ask AI about this code