Title 15 — BUILDINGS AND CONSTRUCTION

Colton Municipal Code Ch. 15.58 Recycling Requirements

Colton Municipal Code · 2026-10 edition · updated 2026-10-04 · Colton

Cite as: Colton Municipal Code Chapter 15.58 · Text as of 2026-10-04

15.58.010 - Purpose.

The purpose of this chapter is to establish requirements for recycling by specified development activities to facilitate the city's compliance with state recycling mandates, including removal of architectural barriers to recycling and ensuring recycling of construction and demolition debris.

(Ord. No. O-04-14, § 1, 4-15-2014)

Exceptions & meaning →

15.58.020 - Applicability.

This chapter shall apply to applicants for the following types of development activities:

A. The demolition of any structure.

B. The construction of, and additions or tenant improvements with the exception of residential single family homes up to four units and projects with a valuation less than one hundred thousand dollars.

C. All reroofing activities that do not include removal of existing roof.

D. Work for which only a plumbing, only an electrical, or only a mechanical permit is required.

A Building Recycling Plan is not required for smaller demolition and renovation projects within the City whose total costs is less than one hundred thousand dollars and shall be encouraged to divert at least fifty percent of all project-related construction and demolition debris from landfill to recycling or reuse operations.

(Ord. No. O-04-14, § 2, 4-15-2014)

Exceptions & meaning →

15.58.030 - Site and Building Recycling Plan Requirements.

The applicant for any development activity subject to this chapter shall, as a condition of approval of that application, submit for review and approval a completed site and building recycling plan to the City's Building and Safety Division. The site and building recycling plan shall be based upon the application form of the building and safety department and consists of two components (site plan and building recycling plan). The plan shall include the location and design of all existing and proposed recycling and trash enclosures, design of site access points for solid waste and recycling collection vehicles and a design of the grading of the site, operational criteria for the proposed use of the property and capacity requirements for the waste generation of the building.

The Development Services Director may waive the requirement for a site plan upon its finding that: a) the development activity is a reroofing project or a demolition; or b) the development activity is a tenant improvement not requiring significant site improvements; or c) the existing trash and recycling enclosure is adequate to provide the required level of service, including capacity and access, for trash collection for recycling, for the facility.

A. Site Plan Requirements:

  1. Development Activity Other Than Duplexes, Triplexes, Fourplexes: For development activity other than duplexes, triplexes and fourplexes, the site plan shall provide for one or more double enclosures. If a trash compactor is proposed for use, the design and manufacturer's detail drawings shall be submitted with the site plan submittal. The plans shall comply with the solid waste recycling access act of 1991, the solid waste development requirements for the activity and the requirements of this code.

  2. Trash and Recycling Containers: Trash and recycling containers shall be shown on the site plan at grade.

  3. Trash and Recycling Enclosures Accessibility: Trash and recycling enclosures shall be accessible to solid waste collection vehicles. Location and access shall be designed to minimize potential injury to employees or the public and damage to property from collection vehicles. The plan shall include design for solid waste truck turnaround movements, showing access and turnaround areas, and "keep clear" areas, for solid waste collection vehicles.

  4. Adequate Capacity: Adequate capacity shall be provided for the trash and recycling enclosure design as shown on the site. Such requirements shall be based on the volume and tonnage generated by the development activity, as estimated by the City.

  5. Recycling and Trash Enclosures Required: Recycling and trash enclosures shall be required where trash receptacles are not stored wholly within a building and in any industrial project where trash receptacles are being used and the trash receptacles are not stored wholly within the building or screened by landscaping, fencing or a structure.

a. Size: Recycling and trash bin enclosures shall be sized to provide for both recycling and trash receptacles without one blocking the other for proper access.

b. Design Specifications: The design of the recycling and trash bin enclosures shall conform to the City's standard specifications and plans. Alternative enclosure designs are subject to the approval of the Public Works Director. The storage of grease or oils in the trash and recycling enclosure is prohibited.

  1. Issuance of Building Permit: No building permit shall be issued for any development activity subject to this chapter unless the site plan has been approved by the Building Official.

B. Building Recycling Plan Requirements:

  1. The storage of trash and recyclables shall be contained in dumpsters or other receptacles approved by the City.

  2. The storage of non-trash or non-recyclables in the trash and recycling enclosure is prohibited.

  3. The flow of materials through the facility shall be indicated. Interior space shall be identified in centralized areas for the consolidation of trash and recyclables (e.g., lounges, copy machine areas, etc.).

  4. An education/public outreach program shall be implemented to instruct occupants of the development about the benefits of recycling and how to recycle.

a. Promotional Literature: The owners/property managers of the development shall provide tenants with information on the proper separation of recyclables from trash. Such information will be provided upon move in and at least once each year thereafter. Employees of commercial businesses shall receive periodic training to reinforce the proper separation of materials, including the distribution of a flier that lists the materials for recycling.

b. Signage: Signage shall be permanently posted on recycling containers to distinguish them from refuse or trash containers. General instructions about how to recycle shall be posted within the recycling and trash enclosure at or near the receptacle area and shall be visible to the enclosure/receptacle users. The name and phone number of the person responsible for maintenance of the enclosure or receptacle shall be posted. Any sign visible from outside of the enclosure shall be no larger than two square feet.

  1. Recycling receptacles shall be co-located next to trash containers in the centralized areas of office work spaces. Signage shall be employed to instruct users as to the proper separation of recyclables from trash. Signage may be posted on the wall above or adjacent to the containers or affixed to the containers. Signage shall be large enough to read from [a] five-foot distance by a person with average eyesight.

  2. No Certificate of Occupancy shall be issued for any development activity subject to this chapter structure until the adequacy of the building recycling plan has been approved by the development services director.

(Ord. No. O-04-14, § 3, 4-15-2014)

Exceptions & meaning →

15.58.040 - Construction and Demolition Recycling Requirements.

The construction and demolition requirements specify recycling or deconstruction for reuse in the removal, remodeling or new construction of any structure on the site. The construction and demolition recycling plan shall include the following:

A. Loading and Collection Area Drawing: The construction and demolition recycling plan shall include a drawing that identifies an area for the loading and collection of recyclable materials with appropriate access for collection vehicles.

B. Targeted Materials for Recycling: Targeted materials for recycling shall include concrete, asphalt, clean wood (unpainted or untreated), brick, metal, cardboard and sheetrock. The municipal utilities director may modify the targeted materials based on available markets.

C. Separation of Materials: The demolition and construction plan shall specify how the materials will be separated at the source and/or recycled by utilizing the services of a processor.

D. Plan Compliance: The Construction and Demolition (C&D) program shall demonstrate compliance with the following construction site requirements:

  1. Construction waste and demolition debris shall be removed from the construction site on a regular basis and shall not be stored on site and in the open for a period in excess of four weeks, provided that such waste is not hazardous or noxious and does not constitute a nuisance, in which case it must be appropriately secured and regularly removed from the construction site.

  2. Reasonable efforts shall be demonstrated to provide for segregation of recyclable construction materials and demolition debris for diversion from landfills.

  3. Construction waste and demolition debris that may become windblown shall be containerized to prevent litter.

E. Recycled Materials: Recycled materials to be used in construction or remodeling of the facility shall be identified.

F. Approved Demolition Permit and Building Permit: No demolition permit or building permit shall be issued for any development activity subject to this chapter unless the construction and demolition diversion program plan has been approved by the Building Official.

G. Certificate of Occupancy and Reporting Requirements/Documentation of Compliance with Construction and Demolition Diversion Program:

  1. Recycling Report a Condition of Certificate of Occupancy: The applicant shall submit a waste diversion report to the building and safety department that documents the construction and demolition debris recycled as a condition of issuing a certificate of occupancy.

  2. Requirement to Report Quantities of Waste Recycled as a Condition of the Certificate of Occupancy: The construction and demolition report shall report the estimated quantities of all construction waste and demolition debris listed in the recycling plan.

  3. Documentation of Reported Quantities: The applicant shall attach recycling receipts or provide other pertinent documentation that demonstrates waste diversion and recycling in conformance with the approved construction and demolition waste diversion plan.

(Ord. No. O-04-14, § 4, 4-15-2014)

Exceptions & meaning →

15.58.050 - Exceptions for Existing Development.

A. Existing Recycling and Trash Bin Enclosure: If the development activity is a tenant improvement for a site, not requiring significant site improvements, that has an existing trash enclosure, then the required recycling containers for the facility shall be located inside the trash enclosure. If it is not possible to locate the required recycling receptacles in the trash enclosure, based on the Development Services Director estimate of required volume, then recycling receptacles shall be located adjacent to the existing trash enclosure. Any proposed modifications to the existing trash enclosure shall comply with the requirements listed in Section 15.58.030 of this chapter.

B. No Existing Recycling and Trash Bin Enclosure: If the development activity does not have an existing trash enclosure, the development may be required to install a trash enclosure that will meet the requirements of Section 15.58.030 of this chapter. If it is determined by the Development Services Director that there is insufficient space to construct a trash and recycling enclosure, the required recycling receptacle shall be located adjacent to the existing trash receptacles. Any proposed recycling and trash enclosure shall comply with the requirements listed in Section 15.58.030 of this chapter. The Development Services Director shall have the authority to grant exceptions to the requirements under Section 15.58.030 of this chapter based on space and access considerations.

C. Waiver of Parking Requirement: In order to meet the required recycling volume requirement for the size of the facility, the planning commission and/or city council may grant a waiver to reduce required parking through approval of a variance. The Development Services Director shall have the authority to grant the use of parking spaces for the location of recycling receptacles, provided the enclosure or receptacles meet the design specifications in Section 15.58.030 of this Chapter and the reduction in parking spaces does not violate the minimum requirement for the development.

(Ord. No. O-04-14, § 5, 4-15-2014)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Colton Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.