Chino Municipal Code Ch. 15.46 Rooftop Solar Energy Systems

Chino Municipal Code · 2026-10 edition · updated 2026-10-04 · Chino

Cite as: Chino Municipal Code Chapter 15.46 · Text as of 2026-10-04

15.46.010 - Small Residential Rooftop Solar Energy System Review Process.

A. The following words and phrases as used in this section are defined as follows:

Electronic submittal means the utilization of one or more of the following:

  1. E-mail.

  2. Online permit software available through the City of Chino website.

  3. Facsimile.

  4. SolarApp+, per SB 379.

Small residential rooftop solar energy system means all of the following:

  1. A solar energy system that is no larger than 38.4 kilowatts alternating current nameplate rating or thirty kilowatts thermal.

  2. A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the city and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time.

  3. A solar energy system that is installed on a single or duplex family dwelling.

  4. A solar panel or module array that does not exceed the maximum legal building height as defined in this Code or applicable provisions of state law.

Solar energy system has the same meaning set forth in paragraphs (1) and (2) of subdivision (a) of Section 801.5 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time.

B. Prior to submitting an application, the applicant shall:

  1. Verify to the applicant's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and

  2. At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground, and bonding wiring, as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads.

C. An applicant may submit the permit application and associated documentation to the city's building division by personal, mailed, or electronic submittal together with any required permit processing and inspection fees. In the case of electronic submittal, the electronic signature of the applicant on all forms, applications, and other documentation may be used in lieu of a wet signature.

D. For a small residential rooftop solar energy system eligible for expedited review, only one inspection from the building division shall be required, which shall be done in a timely manner. A separate fire inspection is required to be performed by the Chino Valley Independent Fire District. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized; however, the subsequent inspection need not conform to the requirements of this subsection.

E. An application that satisfies the information requirements in the checklist, as determined by the building official, shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.

F. Upon confirmation by the building official of the application and supporting documentation being complete and meeting the requirements of the checklist, the building official shall administratively approve the application and issue all required permits and authorizations. Such approval does not authorize an applicant to connect the small residential rooftop energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider.

(Ord. No. 2025-007, § 2, 2025.)

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Chino Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.