Earlier editions: 2026-09
Chino Municipal Code Appendix I Comprehensive Fee Schedule
Chino Municipal Code · 2026-10 edition · updated 2026-10-04 · Chino
Cite as: Chino Municipal Code Appendix I · Text as of 2026-10-04
CITY OF CHINO USER FEES Proposed January 1, 2017
| SERVICE CENTER # | SERVICE CENTER NAME | BASE FEE/ |
Effective 1/1/2017 | Effective 1/1/2018 | PERCENT OF RECOVERY |
|---|---|---|---|---|---|
| S-00110 | BUILDING PERMIT/ |
MOST RECENT VERSION OF UNIFORM ADMINISTRATIVE CODE | ** | ** | 100% |
| S-00110 | ELECTRICAL PERMIT/ |
MOST RECENT VERSION OF UNIFORM ADMINISTRATIVE CODE | ** | ** | 100% |
| S-00110 | MECHANICAL PERMIT/ |
MOST RECENT VERSION OF UNIFORM ADMINISTRATIVE CODE | ** | ** | 100% |
| S-00110 | PLUMBING PERMIT/ |
MOST RECENT VERSION OF UNIFORM ADMINISTRATIVE CODE | ** | ** | 100% |
| S-00120 | GREEN BUILDING STANDARDS (CBSC FEE) | FEE SET BY SB 1473, BASED ON BUILDING VALUATION | ** | ** | 100% |
| S-00510 | GRADING PLAN—ROUGH—5 TO 10 ACRES | MINIMUM FOR 5 TO 10 ACRES | $1,916.00 | $1,882.00 | 100% |
| S-00520 | GRADING PLAN CHECK—ROUGH—GREATER THAN 10 ACRES | BASE FEE FOR FIRST 10 ACRES | $1,916.00 | $1,882.00 | 100% |
| S-00520 | GRADING PLAN CHECK—ROUGH—GREATER THAN 10 ACRES | PLUS FOR EACH ADDITIONAL 5 ACRES | $556.00 | $557.00 | 100% |
| S-00530 | GRADING PLAN CHECK—PRECISE—LESS THAN OR EQUAL TO 10 ACRES | BASE FEE FIRST ACRE | $976.00 | $990.00 | 100% |
| S-00530 | GRADING PLAN CHECK—PRECISE—LESS THAN OR EQUAL TO 10 ACRES | PLUS ADDITIONAL ACRE OR PORTION THEREOF, UP TO 10 ACRES | $205.00 | $208.00 | 100% |
| S-00540 | GRADING PLAN CHECK—PRECISE—GREATER THAN 10 ACRES | BASE FEE FIRST 10 ACRES | $2,821.00 | $2,862.00 | 100% |
| S-00540 | GRADING PLAN CHECK—PRECISE—GREATER THAN 10 ACRES | PLUS EACH ADDITIONAL 5 ACRES | $591.00 | $593.00 | 100% |
| S-00550 | GRADING INSPECTION-ROUGH | BASE FEE FIRST 5 ACRES | $534.00 | $556.00 | 100% |
| S-00550 | GRADING INSPECTION-ROUGH | PLUS EACH ADDITIONAL 5 ACRES | $181.00 | $186.00 | 100% |
| S-00560 | GRADING INSPECTION—PRECISE—0 TO 10 ACRES | BASE FEE FIRST ACRE | $460.00 | $472.00 | 100% |
| S-00560 | GRADING INSPECTION—PRECISE—0 TO 10 ACRES | PLUS EACH ADDITIONAL ACRE OR PORTION THEREOF, UP TO 10 ACRES | $69.00 | $71.00 | 100% |
| S-00570 | GRADING INSPECTION—PRECISE—GREATER THAN 10 ACRES | BASE FEE FIRST 10 ACRES | $1,081.00 | $1,111.00 | 100% |
| S-00570 | GRADING INSPECTION—PRECISE—GREATER THAN 10 ACRES | PLUS EACH ADDITIONAL 5 ACRES | $333.00 | $345.00 | 100% |
| S-00590 | HYDROLOGY STUDY REVIEW | BASE FEE FIRST 3 ACRES | $253.00 | $268.00 | 100% |
| S-00590 | HYDROLOGY STUDY REVIEW | PLUS EVERY ACRE OR PORTION THEREOF ABOVE 3 ACRES | $56.00 | $59.00 | 100% |
| S-00592 | EROSION CONTROL PLAN REVIEW | BASE FEE FIRST 5 ACRES | $245.00 | $255.00 | 100% |
| S-00592 | EROSION CONTROL PLAN REVIEW | PLUS EACH ADDITIONAL 5 ACRES OR PORTION THEREOF | $139.00 | $145.00 | 100% |
| S-00594 | SOIL REPORT REVIEW | FEE | $123.00 | $130.00 | 100% |
| S-00810 | TENTATIVE TRACT MAP | BASE FEE | $6,749.00 | $6,700.00 | 100% |
| S-00810 | TENTATIVE TRACT MAP | PLUS PER LOT | $13.00 | $14.00 | 100% |
| S-00820 | TENTATIVE PARCEL MAP | BASE FEE | $5,115.00 | $5,097.00 | 100% |
| S-00820 | TENTATIVE PARCEL MAP | PLUS PER LOT | $13.00 | $14.00 | 100% |
| S-00910 | FINAL SUBDIVISION MAP—TRACT | BASE FEE | $3,615.00 | $3,800.00 | 100% |
| S-00910 | FINAL SUBDIVISION MAP—TRACT | PLUS PER LOT | $60.00 | $63.00 | 100% |
| S-00920 | FINAL SUBDIVISION MAP—PARCEL | FIRST LOT | $2,990.00 | $3,144.00 | 100% |
| S-00920 | FINAL SUBDIVISION MAP—PARCEL | PLUS PER LOT | $60.00 | $63.00 | 100% |
| S-01000 | ENV. ASSESSMENT—INITIAL STUDY/ |
FEE | $1,503.00 | $1,481.00 | 100% |
| S-01100a | ENV. REVIEW—MND, ND, ADDENDUM (MITIGATED NEGATIVE DECLARATION,NEGATIVE DECLARATION, ADDENDUM) | FEE | $4,757.00 | $4,696.00 | 100% |
| S-01100b | ENV. REVIEW—EIR | FEE | $8,527.00 | $8,435.00 | 100% |
| S-01200 | BUILDING PLAN REVIEW | 75% OF THE BUILDING FEE TO COVER COST OF PLAN CHECK AND TITLE 24 ENERGY CALCULATIONS, AS WELL AS AMERICAN DISABILITY ACT REQUIREMENTS. FOR PLAN CHECK ON PLANS FOR HOUSING TRACTS WITH MODEL HOMES, 75% OF BUILDING FEE FOR EACH INDIVIDUAL MODEL AND 35% OF BUILDING FEE FOR EACH ADDITIONAL RESIDENTIAL UNIT | ** | ** | 100% |
| S-01321 | ENGINEERING PLAN CHECK—FEE BASED ON JOB VALUATION | $0 TO $25,000 PLUS 7.7% OF AMOUNT > $10,000 | $1,693.00 | $1,753.00 | 100% |
| S-01322 | ENGINEERING PLAN CHECK—FEE BASED ON JOB VALUATION | $25,001 TO $75,000 PLUS 3% OF AMOUNT > $25,000.00 | $3,142.00 | $3,273.00 | 100% |
| S-01323 | ENGINEERING PLAN CHECK—FEE BASED ON JOB VALUATION | $75,001 TO $125,000 PLUS 2.5% OF AMOUNT > $75,000.00 | $5,339.00 | $5,609.00 | 100% |
| S-01324 | ENGINEERING PLAN CHECK—FEE BASED ON JOB VALUATION | $125,001 TO $200,000 PLUS 2.4% OF AMOUNT > $125,000.00 | $7,175.00 | $7,547.00 | 100% |
| S-01325 | ENGINEERING PLAN CHECK—FEE BASED ON JOB VALUATION | $200,001 AND ABOVE PLUS 1.3% OF AMOUNT > $200,000.00 | $9,188.00 | $9,672.00 | 100% |
| S-01340 | INSPECTION OF RESIDENTIAL DRIVEWAY | FEE | $226.00 | $231.00 | 100% |
| S-01341 | INSPECTION OF COMMERCIAL DRIVEWAY | FEE | $394.00 | $404.00 | 100% |
| S-01342 | INSPECTION OF UTILITY SERVICE CUT LESS OR EQUAL TO 5' X 20' | FEE | $171.00 | $183.00 | 100% |
| S-01343 | INSPECTION OF SIDEWALK LESS THAN 150 SQ. FT | FEE | $137.00 | $146.00 | 100% |
| S-01344 | SIMPLE INSPECTION—TRAFFIC CONTROL | FEE | $43.00 | $46.00 | 100% |
| S-01400 | REVISION OF ENGINEERING PLANS | FEE | $612.00 | $624.00 | 100% |
| S-01500 | TRAFFIC IMPACT ANALYSIS REVIEW | ACTUAL COST | ** | ** | 100% |
| S-01550 | TRAFFIC CONTROL PLAN REVIEW | ACTUAL COST | ** | ** | 100% |
| S-01600 | PUBLIC IMPROVEMENT INSPECTION | MINIMUM PLUS 4.8% OF THE ESTIMATED VALUE OF CONSTRUCTION | $433.00 | $464.00 | 100% |
| S-01700 | GENERAL PLAN UPDATE | 0.05% OF THE JOB VALUATION | ** | ** | 100% |
| S-01710 | GENERAL PLAN AMENDMENT—MAP CHANGE | FEE | $5,553.00 | $5,533.00 | 100% |
| S-01720 | GENERAL PLAN AMENDMENT—TEXT CHANGE | FEE | $5,145.00 | $5,098.00 | 100% |
| S-01750 | SPECIFIC PLAN AMENDMENT REVIEW | FEE | $6,433.00 | $6,403.00 | 100% |
| S-01800 | SPECIAL CONDITIONAL USE PERMIT ONLY—COMMERCIAL/ |
FEE | $3,804.00 | $3,812.00 | 100% |
| S-01800 | SPECIAL CONDITIONAL USE PERMIT ONLY—RESIDENTIAL/ |
FEE | $1,217.00 | $1,220.00 | 32% |
| S-01850 | SPECIAL CONDITIONAL USE PERMIT AND SITE APPROVAL CONCURRENTLY | FEE | $8,467.00 | $8,452.00 | 100% |
| S-01860 | DEVELOPER MODIFICATION—SCUP | FEE | $2,962.00 | $2,966.00 | 100% |
| S-01900 | VARIANCE FEE | FEE | $3,386.00 | $3,368.00 | 100% |
| S-01900 | VARIANCE FEE | RESIDENTIAL APPLICANT | $169.00 | $168.00 | 5% |
| S-01950 | ADMIN REVIEW—RESIDENTIAL W/ |
FEE | $244.00 | $254.00 | 100% |
| S-01960 | ADMIN REVIEW—COMMERCIAL OR INDUSTRIAL WITH DRC REVIEW | FEE | $3,055.00 | $3,023.00 | 100% |
| S-01970 | ADMIN REVIEW—COMMERCIAL OR INDUSTRIAL WITHOUT DRC REVIEW | FEE | $1,575.00 | $1,582.00 | 100% |
| S-02000 | CITY COUNCIL APPEAL PROCESSING—NON-RESIDENT APPLICANT APPEALING A PLANNING COMMISSION DECISION | FEE | $2,767.00 | $2,804.00 | 100% |
| S-02000 | CITY COUNCIL APPEAL PROCESSING—RESIDENT APPLICANT APPEALING A PLANNING COMMISSION DECISION | FEE | $0.00 * | $0.00 | 0% |
| S-02010 | PLANNING COMMISSION APPEAL PROCESSING—NON-RESIDENT APPLICANT APPEALING A DECISION REGARDING DEVELOPMENT | FEE | $3,912.00 | $3,899.00 | 100% |
| S-02010 | PLANNING COMMISSION APPEAL PROCESSING—RESIDENT APPLICANT APPEALING A DECISION REGARDING DEVELOPMENT | FEE | $0.00 * | $0.00 | 0% |
| S-02100 | DEVELOPMENT TIME EXTENSION ADMINISTRATIVE | FEE | $1,058.00 | $1,061.00 | 100% |
| S-02110 | DEVELOPMENT TIME EXTENSION—DISCRETIONARY | FEE | $1,465.00 | $1,507.00 | 100% |
| S-02300 | ZONE CHANGE REVIEW | FEE | $5,836.00 | $5,767.00 | 100% |
| S-02320 | PRE-ZONE WITH ANNEXATION | FEE PLUS LAFCO FEES | $6,845.00 | $10,597.00 | 100% |
| S-02400 | ZONING ORDINANCE AMENDMENT | FEE | $3,669.00 | $3,635.00 | 100% |
| S-02500 | SIGN REVIEW | FEE | $236.00 | $242.00 | 100% |
| S-02550 | SIGN PROGRAM REVIEW | FEE | $717.00 | $701.00 | 100% |
| S-02600 | SITE APPROVAL REVIEW—WHEN APPLIED FOR SEPARATELY | FEE | $7,165.00 | $7,119.00 | 100% |
| S-02610 | MASTER SITE APPROVAL REVIEW—THE PRESERVE/ |
5—20 ACRES | $1,955.00 | $1,957.00 | 100% |
| S-02610 | MASTER SITE APPROVAL REVIEW—THE PRESERVE/ |
21—125 ACRES | $3,913.00 | $3,917.00 | 100% |
| S-02610 | MASTER SITE APPROVAL REVIEW—THE PRESERVE/ |
126 & ABOVE | $10,452.00 | $10,463.00 | 100% |
| S-02700 | SIGN ORDINANCE AMENDMENT | FEE | $5,367.00 | $5,336.00 | 100% |
| S-02800 | SIGN ORDINANCE VARIANCE | FEE | $2,316.00 | $2,304.00 | 100% |
| S-02900 | DEVELOPMENT AGREEMENT PROCESSING | ACTUAL COST | ** | ** | 100% |
| S-02910 | DEVELOPMENT AGREEMENT ANNUAL COMPLIANCE REVIEW | ACTUAL COST | ** | ** | 100% |
| S-03000 | PRELIMINARY PROJECT REVIEW | FEE | $3,328.00 | $3,349.00 | 100% |
| S-03100 | DEVELOPER MODIFICATION REQUEST FOR SITE APPROVAL | FEE | $5,502.00 | $5,434.00 | 100% |
| S-03101 | DEVELOPER MODIFICATION REQUEST FOR SITE APPROVAL/ |
FEE | $1,001.00 | $1,038.00 | 100% |
| S-03131 | DEVELOPER MODIFICATION REQUEST FOR SUBDIVISION | FEE | $2,290.00 | $2,302.00 | 100% |
| S-03140 | COVENANTS, CONDITIONS & RESTRICTIONS (CC&R) REVIEW | BASE FEE PLUS COST OF CITY ATTORNEY REVIEW | $381.00 | $389.00 | 100% |
| S-03200 | AGRICULTURAL PRESERVE WITHDRAWAL | BASE FEE PLUS OUTSIDE COSTS | $1,676.00 | $1,725.00 | 100% |
| S-03300 | AGRICULTURAL CONTRACT—PARTIAL NOTICE OF NON-RENEWAL | BASE FEE PLUS OUTSIDE COSTS | $1,247.00 | $1,278.00 | 100% |
| S-03310 | AGRICULTURAL CONTRACT—NOTICE OF NON-RENEWAL | BASE FEE PLUS OUTSIDE COSTS | $1,247.00 | $1,278.00 | 100% |
| S-03320 | AGRICULTURAL CONTRACT CANCELLATION | FEE | $2,852.00 | $2,882.00 | 100% |
| S-03400 | RIGHT-OF-WAY (R.O.W.) ENCROACHMENT | FEE | $168.00 | $173.00 | 100% |
| S-03410 | NEWSRACK PERMIT | PER PUBLICATION—ONE TIME FEE | $101.00 | $104.00 | 100% |
| S-03420 | RIGHT-OF-WAY (R.O.W.) ENCROACHMENT—MINOR | FEE | $41.00 | $43.00 | 100% |
| S-03500 | WIDE/ |
CURRENT FEES AS ALLOWED BY STATE AND ACTUAL COST FOR ADDITIONAL PLAN CHECKING AND INSPECTION FOR EXCESSIVE LOADS | ** | ** | 100% |
| S-03600 | SPECIAL AGREEMENT TO ASSIST DEVELOPMENT | ACTUAL COST | ** | ** | 100% |
| S-03610 | LOT LINE ADJUSTMENT | FEE | $722.00 | $761.00 | 100% |
| S-03620 | INFRASTRUCTURE REIMBURSEMENTS | FEE | $1,843.00 | $1,874.00 | 100% |
| S-03630 | DEEDS OF RIGHT-OF-WAY—DEDICATION/ |
FEE | $662.00 | $704.00 | 100% |
| S-03660 | MODEL HOME AGREEMENTS | ACTUAL COST | ** | ** | 100% |
| S-03700 | DETOUR/ |
FEE | $134.00 | $139.00 | 100% |
| S-03800 | SURVEY MONUMENT RESTORATION | BASE FEE PLUS COST OF LICENSED SURVEYOR | $264.00 | $272.00 | 100% |
| S-03900 | SPECIAL PERMIT BUILDING INSPECTION | FEE | $164.00 | $169.00 | 100% |
| S-04100 | SPECIAL BUSINESS PERMIT HEARING—NON-PROFIT | NO FEE | $0.00 * | $0.00 | 0% |
| S-04100A | SPECIAL BUSINESS PERMIT HEARING—REGULAR | NO HEARING | $203.00 | $213.00 | 100% |
| S-04100A | SPECIAL BUSINESS PERMIT HEARING—REGULAR | WITH HEARING PLUS ACTUAL COST FOR HEARING OFFICER | $525.00 | $545.00 | 100% |
| S-04100B | SPECIAL BUSINESS PERMIT—ADVERTISING BY DISTRIBUTION OF SAMPLES OR HANDBILLS | BASE FEE PER BUSINESS | $26.00 | $28.00 | 100% |
| S-04100B | SPECIAL BUSINESS PERMIT—ADVERTISING BY DISTRIBUTION OF SAMPLES OR HANDBILLS | PLUS PER DISTRIBUTOR | $6.00 | $6.00 | 100% |
| S-04200 | SPECIAL PERMIT INVESTIGATION | MINIMUM PLUS ACTUAL COST OF POLICE INVESTIGATION | $149.00 | $159.00 | 100% |
| S-04210 | SPECIAL PERMIT (ID BADGE) | FEE | $95.00 | $102.00 | 100% |
| S-04300 | BICYCLE REGISTRATION FEE | FEE SET BY STATE | $3.00 | $3.00 | 35% |
| S-04500 | PARKING ENFORCEMENT FINES | SET BY CITY RESOLUTION/ |
** | ** | 100% |
| S-04600 | VEHICLE INSPECTION | FEE | $38.00 | $39.00 | 100% |
| S-04650 | VIN VERIFICATION | FEE | $41.00 | $43.00 | 100% |
| S-04700 | GRAFFITI VANDALISM COST RECOVERY | BASE FEE PER SQ. FT. PLUS MAX ALLOWED BY COURT FOR POLICE INVESTIGATION | $10.00 | $10.00 | 100% |
| S-05100 | FALSE ALARM RESPONSE (IN A 12-MONTH PERIOD FROM JULY 1—JUNE 30) | FIRST THREE RESPONSES ARE FREE. FOURTH RESPONSE | $51.00 | $54.00 | 100% |
| S-05100 | FALSE ALARM RESPONSE (IN A 12-MONTH PERIOD FROM JULY 1—JUNE 30) | FIFTH RESPONSE | $89.00 | $93.00 | 100% |
| S-05100 | FALSE ALARM RESPONSE (IN A 12-MONTH PERIOD FROM JULY 1—JUNE 30) | SIXTH AND EACH SUBSEQUENT RESPONSE | $176.00 | $184.00 | 100% |
| S-05200 | POLICE REPORT SALES | COPY @ $.10 PER PAGE | $0.10 | $0.10 | 100% |
| S-05250 | POLICE PHOTO REPRODUCTION | PHOTO REPRODUCTION PLUS OUTSIDE COST OF PRINTED PHOTOS | $59.00 | $60.00 | 100% |
| S-05250 | POLICE PHOTO REPRODUCTION | PHOTOS ON CDR | $41.00 | $42.00 | 100% |
| S-05300 | LOCAL CRIMINAL HISTORY RECORD | APPLICATION | $5.00 | $6.00 | 100% |
| S-05400 | FINGERPRINT SERVICE | BASE FEE PLUS STATE/ |
$24.00 | $25.00 | 100% |
| S-05500 | CLEARANCE LETTER/ |
ABC LETTER | $32.00 | $33.00 | 100% |
| S-05500 | CLEARANCE LETTER/ |
PASSPORT LETTER | $10.00 | $10.00 | 100% |
| S-05800 | SPECIAL PARKING PERMIT | ANNUAL PERMIT | $15.00 | $15.00 | 100% |
| S-05900 | PARADE SERVICES | CITY OR SCHOOL DISTRICT SPONSPORED EVENTS | $0.00 * | $0.00 * | 0% |
| S-05900 | PARADE SERVICES | OTHER APPLICANTS—ACTUAL COST OF CITY SERVICES | ** | ** | 100% |
| S-07500 | TEMPORARY HYDRANT METER RENTAL | PER RENTAL | $123.00 | $119.00 | 100% |
| S-07500 | TEMPORARY HYDRANT METER RENTAL | DEPOSIT REQUIRED FOR COST OF METER REPLACEMENT AND ESTIMATED WATER USAGE—RESIDENTIAL $900.00; COMMERCIAL $2,000.00 | ** | ** | |
| S-07600 | WATER METER INSTALLATION | CITY INSTALLED, JUMPER INCLUDED PLUS COST OF METER FOR 5/8" TO 1" METERS | $226.00 | $225.00 | 100% |
| S-07600 | WATER METER INSTALLATION | CITY INSTALLED, NO JUMPER PLUS COST OF METER FOR 1-1/2" TO 2" METERS | $173.00 | $172.00 | 100% |
| S-07600 | WATER METER INSTALLATION | DEVELOPER INSTALLED, NO JUMPER PLUS COST OF METER FOR METERS LARGER THAN 2" | $151.00 | $149.00 | 100% |
| S-07610 | WATER METER DOWNSIZE OR UPGRADE | BASE PLUS METER COST | $185.00 | $170.00 | 100% |
| S-07700 | REQUESTED METER TEST | BASE FEE PLUS ACTUAL COST OF OUTSIDE SERVICE | $196.00 | $182.00 | 100% |
| S-07800 | WATER TURN-ON SERVICE | FEE | $24.00 | $24.00 | 100% |
| S-07900 | DELINQUENT PROCESSING CHARGE | FEE | $48.00 | $48.00 | 100% |
| S-07900 | DELINQUENT PROCESSING CHARGE | FEE IF METER LOCK HAS BEEN TAMPERED WITH | $58.00 | $58.00 | 100% |
| S-07900 | DELINQUENT PROCESSING CHARGE | FEE IF WATER VALVE HAS BEEN TAMPERED WITH PLUS COST OF THE VALVE | $393.00 | $401.00 | 100% |
| S-08000 | DELINQUENCY NOTIFICATION | BASE FEE | $5.00 | $5.00 | 100% |
| S-08001 | DELINQUENCY NOTICE—MAIL | FEE | $5.00 | $5.00 | 100% |
| S-08100 | SEWER STOPPAGE INVESTIGATION | FEE | $36.00 | $37.00 | 100% |
| S-08200 | SEWER DYE TEST | FEE | $74.00 | $77.00 | 100% |
| S-08300 | INDUSTRIAL USER DISCHARGE PERMIT—APPLICATION | FEE | $91.00 | $90.00 | 100% |
| S-08310 | INDUSTRIAL USER DISCHARGE PERMIT PROCESSING—SIGNIFICANT DISCHARGER | FEE | $227.00 | $222.00 | 100% |
| S-08311 | INDUSTRIAL USER DISCHARGE PERMIT PROCESSING—CLASS I & II | FEE | $169.00 | $173.00 | 100% |
| S-08315 | INDUSTRIAL USER DISCHARGE PERMIT PROCESSING—NON-DISCHARGER | FEE | $96.00 | $101.00 | 100% |
| S-08320 | INDUSTRIAL USER DISCHARGE INSPECTION—SIGNIFICANT DISCHARGER | FEE | $250.00 | $245.00 | 100% |
| S-08325 | INDUSTRIAL USER DISCHARGE INSPECTION—CLASS I | FEE | $132.00 | $131.00 | 100% |
| S-08326 | INDUSTRIAL USER DISCHARGE INSPECTION—CLASS II | FEE | $139.00 | $140.00 | 100% |
| S-08327 | INDUSTRIAL USER DISCHARGE INSPECTION—NON-DISCHARGER | FEE | $90.00 | $98.00 | 100% |
| S-08333 | INDUSTRIAL USER DISCHARGE PERMIT—SAMPLING | BASE FEE IF PERFORMED BY CITY STAFF; ACTUAL COST IF PROCESSED BY CONTRACT COMPANY | $140.00 | $130.00 | 100% |
| S-08344 | INDUSTRIAL USER DISCHARGE PERMIT MODIFICATION | FEE | $144.00 | $150.00 | 100% |
| S-08350 | INDUSTRIAL PERMIT SAMPLE ANALYSIS | BASE FEE PLUS COST OF OUTSIDE LABORATORY WORK | $44.00 | $44.00 | 100% |
| S-08600 | CITY CODE UPDATE SUBSCRIPTIONS | COST OF PRINTED UPDATE MATERIAL (ACTUAL COST) | ** | ** | 100% |
| S-08700 | AUDIO/ |
PER RECORDING—CITY | $20.00 | $21.00 | 100% |
| S-08700 | AUDIO/ |
PER RECORDING—POLICE | $43.00 | $44.00 | 100% |
| S-09100 | CITY CODE BOOKS | COST OF PRINTING AND BINDING (ACTUAL COST) | ** | ** | 100% |
| S-09500 | RETURNED CHECK COLLECTION | PERSONAL DELIVERY TO HOUSE | $33.00 | $34.00 | 100% |
| S-09500 | RETURNED CHECK COLLECTION | MAILED | $22.00 | $23.00 | 100% |
| S-09500 | RETURNED CHECK COLLECTION | ELECTRONIC NOTICE | $19.00 | $20.00 | 100% |
| S-09600 | SMALL CLAIMS HEARING | FEE | $116.00 | $125.00 | 100% |
| S-09700 | REMINDER/ |
FEE | $12.00 | $13.00 | 100% |
| S-09800 | SMALL CLAIMS FILING | FEE | $29.00 | $31.00 | 100% |
| S-09900 | DUPLICATE BUSINESS LICENSE CERTIFICATE | FEE | $11.00 | $12.00 | 100% |
| S-10000 | MOBILE HOME ANNUAL REGISTRATION | PER SPACE | $16.00 | $17.00 | 100% |
| S-10001 | MOBILE HOME PREMIUM HEARING APPLICATION | FEE | $3,891.00 | $4,023.00 | 100% |
| S-10100 | ADMINISTRATIVE DECISION APPEAL | BASE FEE (HEARINGS REQUIRING MORE THAN ONE HOUR OF STAFF TIME—BASIC FEE PLUS ACTUAL COSTS, INCLUDING HEARING OFFICER) | $217.00 | $212.00 | 100% |
| S-10100 | ADMINISTRATIVE DECISION APPEAL | $0.00 FOR NON-APPLICANT FILING APPEAL | $0.00 * | $0.00 * | 0% |
| S-10200 | DOCUMENT PRINTING | MAXIMUM ALLOWABLE UNDER PUBLIC RECORDS ACT | ** | ** | 100% |
| S-10300 | PHOTOCOPYING | FIRST 9 PAGES—NO COST; OVER 9 PAGES—$.10 PER PAGE AND CHARGE FOR THE FIRST NINE PAGES | $0.10 | $0.10 | 100% |
| S-10310 | DUPLICATION OF PUBLIC RECORDS | $.10 PER PAGE | $0.10 | $0.10 | 100% |
| S-10400 | DOCUMENT CERTIFICATION | FEE | $14.00 | $15.00 | 100% |
| S-10500 | DOCUMENT PROCESSING & IMAGING | FEE PER HOUR, CHARGED ON EACH QUARTER HOUR OR FRACTION THEREOF | $120.00 | $124.00 | 100% |
| S-10500 | DOCUMENT PROCESSING & IMAGING | QUARTER HOUR | $30.00 | $31.00 | 100% |
| S-10600 | ABANDONED VEHICLES | BASE FEE PLUS TOWING FEE | $84.00 | $84.00 | 100% |
| S-10700 | FILM PERMIT APPLICATION | BASE PLUS COSTS FOR ASSOCIATED STAFF TIME; PLUS NEGOTIATED RENTAL FEE FOR USE OF PUBLIC PROPERTY | $286.00 | $300.00 | 100% |
| S-10800 | AFTER HOURS RECONNECTION | FEE | $187.00 | $184.00 | 100% |
| S-10900 | SPECIAL BUSINESS PERMIT RENEWAL | REGULAR APPLICANT | $162.00 | $170.00 | 100% |
| S-10900 | SPECIAL BUSINESS PERMIT RENEWAL | NON-PROFIT GROUP: NO FEE | $0.00 | $0.00 | 0% |
| S-11000 | DUI RESPONSE | ACTUAL COST, NOT TO EXCEED $1,000.00 | ** | ** | 100% |
| S-11200 | AFTER HOURS INSPECTION | ACTUAL COSTS USING FULLY BURDENED RATES | ** | ** | 100% |
| S-11400 | ASSESSMENT DISTRICT LIENS | BASE PLUS COST OF ASSESSMENT CONSULTANT | $462.00 | $480.00 | 100% |
| S-11700-71 | LANDSCAPING/ |
BASE PLUS ACTUAL COST OF OUTSIDE CONSULTANT FOR CONSTRUCTION PLANS | $761.00 | $740.00 | 100% |
| S-11700-71 | LANDSCAPING/ |
BASE PLUS COST OF OUTSIDE CONSULTANT FOR CONCEPTUAL PLANS | $134.00 | $131.00 | 100% |
| S-11800 | DEPARTMENT OF JUSTICE PERMIT | FEE | $53.00 | $74.00 | 100% |
| S-11900 | VEHICLE RELEASE FEE | NO FEE FOR VICTIM | $0.00 | $0.00 | 0% |
| S-11900 | VEHICLE RELEASE FEE | OTHER THAN VICTIM PLUS TOWING FEE | $208.00 | $217.00 | 100% |
| S-12000 | LOUD PARTY RESPONSE | BASE PLUS ACTUAL COST OF OFFICERS AT SCENE | $69.00 | $73.00 | 100% |
| S-12200 | PULLED METER PENALTY | FEE | $65.00 | $65.00 | 100% |
| S-12300 | ONE-DAY WATER PERMIT | BASE FEE PLUS USAGE PLUS PRO-RATED READINESS-TO-SERVE CHARGE IF KEPT LONGER THAN 1 DAY | $55.00 | $52.00 | 100% |
| S-12400 | VIDEO TAPE DUPLICATION | VIDEOTAPE, IF AVAILABLE | $10.00 | $10.00 | 100% |
| S-12500 | FIRE HYDRANT FLOW TEST | FIELD TEST | $186.00 | $188.00 | 100% |
| S-13000 | SPECIAL EVENT PERMIT—MAJOR | FEE | $568.00 | $592.00 | 100% |
| S-13000 | PLUS EACH ADDITIONAL EVENT | FEE | $568.00 | $592.00 | 100% |
| S-13000 | NON-PROFIT GROUPS—NO FEE | FEE | $0.00 * | $0.00 * | 0% |
| S-13005 | SPECIAL EVENT PERMIT—MAJOR LONGER DURATION OR LARGER SIZE EVENT—PC REVIEW | FEE | $2,763.00 | $2,899.00 | 100% |
| S-13005 | SPECIAL EVENT PERMIT—MAJOR LONGER DURATION OR LARGER SIZE EVENT—PC REVIEW | EACH ADDITIONAL PREVIOUSLY APPROVED EVENT | $568.00 | $592.00 | 100% |
| S-13005 | SPECIAL EVENT PERMIT—MAJOR LONGER DURATION OR LARGER SIZE EVENT—PC REVIEW | ADVANCED SECURITY DEPOSIT AND CITY SERVICES DEPOSIT FOR ACTUAL COSTS REQUIRED (ESTIMATED BY THE CITY STAFF) | ** | ** | 100% |
| S-13010 | SPECIAL EVENT PERMIT—MINOR | FEE | $206.00 | $214.00 | 100% |
| S-13011 | SPECIAL EVENT PERMIT—EXPEDITING FEE | FEE | $174.00 | $188.00 | 100% |
| S-13015 | SPECIAL EVENT FLYER STREET NOTIFICATION | FEE | $62.00 | $65.00 | 100% |
| S-13210B | PUBLIC UTILITY/ |
BASE PLUS 3.3% OF CONSTRUCTION COST | $328.00 | $342.00 | 100% |
| S-13220 | PUBLIC UTILITY/ |
BASE PLUS .8% OF THE COST OVER $100,000.00 | $5,248.00 | $5,445.00 | 100% |
| S-13300 | REPOSSESSED VEHICLE FEE | FEE SET BY STATUTE AT $15.00 | $15.00 | $15.00 | 100% |
| S-13600 | LEGAL ADDRESS CHANGE | FEE | $216.00 | $227.00 | 100% |
| S-13800 | TRUANCY/ |
BASE PLUS HOURLY RATE FOR OFFICER | $45.00 | $47.00 | 100% |
| S-13900 | DAMAGE TO CITY PROPERTY | ACTUAL COST USING FULLY-BURDENED HOURLY RATES PLUS COST OF OUTSIDE SERVICE | ** | ** | 100% |
| S-14800 | CONCEALED WEAPON PERMIT | MAXIMUM FEE ALLOWED IS $100.00 | $100.00 | $100.00 | 100% |
| S-14900 | ASSESSMENT DIST APP FEE | FEE | $278.00 | $288.00 | 100% |
| S-15001 | TEMPORARY BANNER PERMIT | FEE | $32.00 | $33.00 | 100% |
| S-15100 | ESCROW RETENTION AGREEMENT | AGREEMENT | $544.00 | $564.00 | 100% |
| S-15100 | ESCROW RETENTION AGREEMENT | PLUS PER MONTH MAINTENANCE FEE | $14.00 | $15.00 | 100% |
| S-15200 | ADULT-ORIENTED BUSINESS APPLICATION FEE | FEE | $504.00 | $527.00 | 100% |
| S-15300 | ADULT ENTERTAINER APPLICATION FEE | FEE | $295.00 | $315.00 | 100% |
| S-15401 | CITY BUSINESS LISTING | CD OR PRINTOUT (PLUS APPLICABLE CALIF. SALES TAX) | $6.00 | $6.00 | 100% |
| S-15500 | DESIGN REVIEW BOARD—THE PRESERVE & COLLEGE PARK | BASE PLUS ACTUAL STAFF TIME FOR DRB | $2,157.00 | $2,177.00 | 100% |
| S-15600 | WATER QUALITY MANAGEMENT PLAN REVIEW | FIRST 5 ACRES | $888.00 | $917.00 | 100% |
| S-15600 | WATER QUALITY MANAGEMENT PLAN REVIEW | PLUS EACH ADDITIONAL 5 ACRES | $210.00 | $217.00 | 100% |
| S-15601 | WATER QUALITY MANAGEMENT PLAN INSPECTION | FEE | $90.00 | $88.00 | 100% |
| S-15610 | INDUSTRIAL USER WASTEWATER ENFORCEMENT / INVESTIGATION | FEE | $150.00 | $147.00 | 100% |
| S-15620 | STORM WATER INSPECTION | FEE | $74.00 | $72.00 | 100% |
| S-15700 | FIREARM STORAGE FEE | FEE | $145.00 | $148.00 | 100% |
| S-15800 | ONE-DAY VENDOR PERMIT | FEE | $12.00 | $13.00 | 100% |
| S-15801 | SOLAR PANEL—RESIDENTIAL | BASE FEE (CAPPED AT $500.00) PLUS $15.00 PER KW FOR EACH KW ABOVE 15 KW | $432.00 | $450.00 | 100% |
| S-15802 | SOLAR PANEL—NON-RESIDENTIAL, 0-250kW | BASE FEE (CAPPED AT $1000.00) PLUS $7 PER KW BETWEEN 51 KW AND 250KW. | $725.00 | $752.00 | 100% |
| S-15803 | SOLAR PANEL—NON-RESIDENTIAL, ABOVE 250kW | BASE FEE CAP PLUS $5 PER KW ABOVE 250 KW | $1,000.00 | $1,000.00 | 100% |
| S-15804 | PUBLIC NOTICE FOR PROJECT ENTITLEMENTS—DEVELOPER | BASE FEE PLUS ACTUAL MAILING COST | $333.00 | $337.00 | 100% |
| S-15804 | PUBLIC NOTICE FOR PROJECT ENTITLEMENTS—DEVELOPER | NO FEE FOR RESIDENTIAL APPLICANT | $0.00 | $0.00 | 0% |
| S-15805 | COLLECTION CONTAINER PERMIT | FEE | $156.00 | $164.00 | 100% |
| S-15806 | COLLECTION CONTAINER RENEWAL PERMIT | FEE | $15.00 | $16.00 | 100% |
| S-15807 | COLLECTION CONTAINER REPLACEMENT PERMIT STICKER | FEE | $35.00 | $36.00 | 100% |
| S-15808 | TEMPORARY CERTIFICATE OF OCCUPANCY—SMALL PROJECT | FEE | N/A | $674.00 | 100% |
| S-15809 | TEMPORARY CERTIFICATE OF OCCUPANCY—MEDIUM PROJECT | FEE | N/A | $929.00 | 100% |
| S-15810 | TEMPORARY CERTIFICATE OF OCCUPANCY—LARGE PROJECT | FEE | N/A | $1,376.00 | 100% |
| S-20100 | GRANT FUNDED SERVICES | ACTUAL COST | ** | ** | 100% |
* Zero fee is based on prior council approval of 100% subsidy.
** Fees cannot be listed as one charge for one unit of service because the calculations are made either on a sliding scale or because the type of service has many different levels, each with a different fee.
(Res. 2016-078, § 1(exh. A), 2016; Res. 2017-060, §1(exh. A), 2017.)
City of Chino COMMUNITY SERVICES FEES
| SERVICE CENTER NAME | Unit/Category | 2017 Fees | 2018 Fees | Percent of Direct Cost Recovery |
|---|---|---|---|---|
| ADULT SPORTS PROGRAMS | 100% | |||
| Women's Soccer | Individual fee | $26.00 | $26.00 | |
| Soccer—Drop In Adult Resident | Individual fee | $2.00 | $2.00 | |
| Soccer—Drop In Adult Non-Resident | Individual fee | $3.00 | $3.00 | |
| Over The Line Baseball | Individual fee | $26.00 | $26.00 | |
| Sports Leagues and Tournament Fees | Team fee | $150.00— $350.00 | $150.00— $350.00 | |
| Forfeit Fee | Team fee | $10.00— $60.00 | $10.00— $60.00 | |
| Boxing Monthly Fee | Individual fee | $27.00 | $27.00 | |
| YOUTH SPORTS PROGRAMS 1 | 56% | |||
| Pee Wee Sports | Individual fee | $41.00 | $41.00 | |
| Winter Basketball | Individual fee | $63.00 | $63.00 | |
| Summer Basketball | Individual fee | $52.00 | $52.00 | |
| Flag Football | Individual fee | $52.00 | $52.00 | |
| Track | Individual fee | $10.00 | $10.00 | |
| Volleyball (6 Weeks) | Individual fee | $52.00 | $52.00 | |
| Volleyball (8 Weeks) | Individual fee | $63.00 | $63.00 | |
| Boxing Monthly Fee 2 | Individual fee | $5.00 | $5.00 | |
| Replacement Jersey Fee | Individual fee | $10.00 | $10.00 | |
| BATTING CAGES | 100% | |||
| Token | 15 pitches | $1.50 | $1.50 | |
| 15 minutes | Session | $10.00 | $10.00 | |
| 30 minutes | Session | $19.00 | $19.00 | |
| 60 minutes | Session | $32.00 | $32.00 | |
| Team Reservation, 60 minutes | Session | $29.00 | $29.00 | |
| SPORTS FACILITY RENTALS (Hourly) | 100% | |||
| Resident Youth Team | Hourly | $9.00 | $9.00 | |
| Non-Resident Youth Team | Hourly | $14.00 | $14.00 | |
| Resident Adult Team | Hourly | $14.00 | $14.00 | |
| Non-Resident Adult Team | Hourly | $24.00 | $24.00 | |
| Softball/ |
Hourly | $35.00 | $35.00 | |
| Soccer Field Prep | Hourly | $50.00 | $50.00 | |
| Adult Tournament Fee—Per team | Team fee | $30.00 | $30.00 | |
| Tournament Security Deposit | Deposit | $350.00 | $350.00 | |
| Ayala Park Synthetic Field - (in addition to the above fees) | Hourly | $40.00 | $40.00 | |
| SPORTS FACILITY MAINTENANCE (Hourly) | ||||
| Resident Youth Team (ballfield) | $1.00 | $1.00 | ||
| Resident Youth Team (soccer field/ |
$2.00 | $2.00 | ||
| Non-Resident Youth Team (ballfield) | $2.00 | $2.00 | ||
| Non-Resident Youth Team (soccer field/ |
$3.00 | $3.00 | ||
| Resident Adult Team (ballfield) | $1.00 | $1.00 | ||
| Resident Adult Team (soccer field/ |
$2.00 | $2.00 | ||
| Non-Resident Adult Team (ballfield) | $2.00 | $2.00 | ||
| Non-Resident Adult Team (soccer field/ |
$3.00 | $3.00 | ||
| SPORTS FIELD LIGHTING | 100% | |||
| Youth Groups | Hourly | $18.00 | $18.00 | |
| Adult Groups | Hourly | $22.00 | $22.00 | |
| SWIMMING LESSONS | 41% | |||
| Group Lessons | Individual fee | $72.00 | $72.00 | |
| Semi-private Lessons | Individual fee | $109.00 | $109.00 | |
| RECREATIONAL SWIMMING | Individual fee | $2.00 | $2.00 | |
| SENIOR PROGRAMS | 20% | |||
| Various | Various | |||
| RECREATION CLASSES 1 | 80% | |||
| Various | Various | |||
| CAMP 3 | 100% | |||
| Camp | Individual fee/ |
$105.00 | $105.00 | |
| Camp/ |
Individual/ |
$26.00 | $26.00 | |
| TINY TOT CLASSES | 100% | |||
| 3-days per week | Individual fee/6 weeks | $165.00 | $165.00 | |
| 2-days per week | Individual fee/6 weeks | $105.00 | $105.00 | |
| COMMUNITY EVENTS 4 | ||||
| Corporate Challenge Entry Fee | Team fee | $700.00 | $700.00 | |
| Tier 1 - Non-Profit Vendor (Food) | Individual fee | $79.00 | $79.00 | |
| Tier 1 - Non-Profit Vendor Fee (Retail) | Individual fee | $55.00 | $55.00 | |
| Tier 1 - Commercial Vendor Fee (Food) | Individual fee | $131.00 | $131.00 | |
| Tier 1 - Commercial Vendor Fee (Retail) | Individual fee | $92.00 | $92.00 | |
| Tier 1 - Commercial Vendor (Information Booth) | Individual fee | $53.00 | ||
| Tier 2 - Non-Profit Vendor Fee (Food) | Individual fee | $53.00 | $53.00 | |
| Tier 2 - Non-Profit Vendor Fee (Retail) | Individual fee | $37.00 | $37.00 | |
| Tier 2 - Commercial Vendor Fee (Food) | Individual fee | $79.00 | $79.00 | |
| Tier 2 - Commercial Vendor Fee (Retail) | Individual fee | $55.00 | $55.00 | |
| Tier 2 - Commercial Vendor (Information Booth) | Individual fee | $31.00 | ||
| Tier 3 - Non-Profit Vendor Fee (Food) | Individual fee | $26.00 | $26.00 | |
| Tier 3 - Non-Profit Vendor Fee (Retail) | Individual fee | $18.00 | $18.00 | |
| Tier 3 - Commercial Vendor Fee (Food) | Individual fee | $53.00 | $53.00 | |
| Tier 3 - Commercial Vendor Fee (Retail) | Individual fee | $37.00 | $37.00 | |
| Tier 3 - Commercial Vendor (Information Booth) | Individual fee | $21.00 | ||
| Tier 4 - Non-Profit Vendor Fee (Food) | Individual fee | $16.00 | $16.00 | |
| Tier 4 - Non-Profit Vendor Fee (Retail) | Individual fee | $11.00 | $11.00 | |
| Tier 4 - Commercial Vendor Fee (Food) | Individual fee | $32.00 | $32.00 | |
| Tier 4 - Commercial Vendor Fee (Retail) | Individual fee | $22.00 | $22.00 | |
| Tier 4 - Commercial Vendor (Information Booth) | Individual fee | $12.00 | ||
| Commercial Vendor (Informational Booth) | Individual fee | $53.00 | REMOVE | |
| Non-Profit Vendor (Information Booth) | Individual fee | $10.00 | $10.00 | |
| Homemade Craft Vendor Fee | Individual fee | $26.00 | $26.00 | |
| 10' x 10' Vendor Canopy Rental | Individual fee | $16.00 | $16.00 | |
| Birthday Party Package | Individual fee | $100.00— $500.00 | $100.00— $500.00 | |
| MEETING ROOM/ |
||||
| Room Set Up Fee | Flat | $32.00— $63.00 | $32.00— $63.00 | |
| Clean Up Fee—Optional | Flat | $53.00— $263.00 | $53.00— $263.00 | |
| Deposit | Refundable | $250.00 | $250.00 | |
| Custodial Personnel | Hourly | $37.00 | $37.00 | |
| Gym Floor Coverage Fee | Service fee | $63.00 | $63.00 | |
| Group II Rentals | 35% | |||
| Group II - Small room | Hourly | $13.00 | $13.00 | |
| Group II - Medium room | Hourly | $17.00 | $17.00 | |
| Group II - Large room | Hourly | $21.00 | $21.00 | |
| Group II - Double room | Hourly | $25.00 | $25.00 | |
| Group II - Auditorium | Hourly | $29.00 | $29.00 | |
| Group II - Kitchen | Flat | $16.00 | $16.00 | |
| Group II - Gymnasium | Hourly | $47.00 | $47.00 | |
| Group III Rentals | 100% | |||
| Group III - Small room | Hourly | $32.00 | $32.00 | |
| Group III - Medium room | Hourly | $42.00 | $42.00 | |
| Group III - Large room | Hourly | $53.00 | $53.00 | |
| Group III - Double room | Hourly | $63.00 | $63.00 | |
| Group III - Auditorium | Hourly | $84.00 | $84.00 | |
| Group III - Kitchen | Flat | $26.00 | $26.00 | |
| Group III - Gymnasium | Hourly | $63.00 | $63.00 | |
| Group IV Rentals | 100% | |||
| Group IV - Small room | Hourly | $47.00 | $47.00 | |
| Group IV - Medium room | Hourly | $58.00 | $58.00 | |
| Group IV - Large room | Hourly | $68.00 | $68.00 | |
| Group IV - Double room | Hourly | $84.00 | $84.00 | |
| Group IV - Auditorium | Hourly | $126.00 | $126.00 | |
| Group IV - Kitchen | Flat | $53.00 | $53.00 | |
| Group IV - Gymnasium | Hourly | $84.00 | $84.00 | |
| Group V Rentals | ||||
| Group V - Small room | Hourly | $58.00 | $58.00 | |
| Group V - Medium room | Hourly | $68.00 | $68.00 | |
| Group V - Large room | Hourly | $79.00 | $79.00 | |
| Group V - Double room | Hourly | $95.00 | $95.00 | |
| Group V - Auditorium | Hourly | $137.00 | $137.00 | |
| Group V - Kitchen | Flat | $53.00 | $53.00 | |
| Group V - Gymnasium | Hourly | $95.00 | $95.00 | |
| Alcohol Deposit | Deposit | $500.00 | $500.00 | |
| Security Guard | Hourly/ |
$26.00 | $26.00 | |
| Partner Universities/ |
||||
| Monday—Thursday Rentals | Hourly | $26.00 | $26.00 | |
| Friday—Sunday Rentals | Hourly | $37.00 | $37.00 | |
| PICNIC PAVILION RENTALS | 100% | |||
| Deposit - (up to 100 people) | Refundable deposit | $50.00 | $50.00 | |
| Deposit - (101+ people) | Refundable deposit | $100.00 | $100.00 | |
| (50 people or less) | Daily | $56.00 | $56.00 | |
| (51—100 people) | Daily | $95.00 | $95.00 | |
| (101—199) | Daily | $131.00 | $131.00 | |
| (200+ people) | Daily | $170.00 | $170.00 | |
| Preserve/ |
Daily | $32.00 | $32.00 | |
| Bouncer | Service fee | $26.00 | $26.00 | |
| AFTER SCHOOL RECREATION 6 | 70% | |||
| Weekly | Individual fee | $40.00 | $40.00 | |
| Monthly | Individual fee | $147.00 | $147.00 | |
| Weekly - Low/ |
Individual fee | $16.00 | $16.00 | |
| Monthly - Low/ |
Individual fee | $58.00 | $58.00 | |
| TEEN PROGRAMS | 10% | |||
| Monthly | Individual fee | $5.00 | $5.00 | |
| Shuttle Fee | Individual fee/ |
$21.00 | $21.00 | |
| Community Services Teen Academy | Individual fee/ |
$68.00 | $68.00 | |
| Teen Opportunity Program (Volunteer) | Individual fee | $11.00 | $11.00 | |
| Early Drop Off | Individual fee/ |
$11.00 | $11.00 | |
| TRIPS & TOURS 7 | 100% | |||
| Actual Cost | Per trip | Actual Cost | Actual Cost | |
| OTHER FEES | ||||
| Resident Counseling Fee | Hourly | $5.00 | $5.00 | |
| Non-Resident Individual Counseling | Hourly | $30.00 | $30.00 | |
| Non-Resident Program Fee 8 | Individual fee | $10.00 | $10.00 | |
| Staff Fee | Hourly | $20.00 | $20.00 | |
| Youth Anger Management | Individual fee | $75.00 | $75.00 | |
| Youth Anger Management Non-Resident | Individual fee/10 weeks | $100.00 | $100.00 | |
| PC 1000 | Individual fee/16 weeks | Fee Set by San Bernardino County | Fee Set by San Bernardino County | |
| Choices | Individual fee/52 weeks | Fee Set by San Bernardino County | Fee Set by San Bernardino County | |
| Active Parenting | Individual fee | $37.00 | $37.00 | 100% |
| Sunrise Kids (before school care) | Individual/ |
$63.00 | $63.00 | 100% |
| Open Gym - Adult Resident | Individual fee | $2.00 | $2.00 | |
| Open Gym - Adult Non-Resident | Individual fee | $3.00 | $3.00 | |
| Open Gym - Youth Non-Resident | Individual fee | $1.00 | $1.00 | |
| Gym Monthly Membership | Individual fee | $26.00 | $26.00 | |
| Gym Identification Card Fee | Individual fee | $5.00 | $5.00 | |
| Boxing Sale Items | Per Item | $1.00—$50.00 | $1.00—$50.00 | |
| Chino Store Products | Per Item | $1.00— $100.00 | $1.00— $100.00 | |
| Street Banner Fee | Group fee | $105.00 | $105.00 | |
| City BBQ Rental Fee | Group fee | $53.00 | $53.00 | |
| Skate Park Rental | Hourly | $150.00— $1,000.00 | $150.00— $1,000.00 | |
| Skate Park Deposit | Refundable | $350.00 | $350.00 | |
| Refund Processing Fee | Individual fee | $5.00 | $5.00 | |
| HEALTHY CHINO | 5% | |||
| Healthy Chino Programs | Individual fee | $5.00—$35.00 | $5.00—$35.00 | |
| Community Garden Key Deposit | Deposit | $20.00 | $20.00 |
Notes:
1 Refund Policy: Refunds/credits will only be issued before the second class/program/sport meeting.
2 Youth boxing: Under 18 or current high school student
3 Camp: Fees are non-refundable. Fees are transferable based on availability. Transferring weekly fees must be made by the Friday prior to the registered week.
4Community Events Tiers
Tier 1: 5+ Hour Events
Tier 2: 3 - 4 Hour Events
Tier 3: 0 - 2 Hour Events
5Meeting room/facility rental classification definitions and cancellation policy
Group I - City of Chino and City of Chino Service Clubs (charged only the staff time when applicable)
Group II - City of Chino non-profits including churches and community groups
Group III - City of Chino residents, non-resident non-profits including churches and community groups
Group IV - Non-resident private rentals and residentcommercial use
Group V - Non-resident commercial
Cancellation of reservation 14—30 days from date of the event, 50% of the fees are refundable.
Cancellation of reservation less than 14 days from date of the event, fees are non-refundable.
6 After school recreation: Transfers, credits, and refunds are only available if requested by the Friday prior to the registered week. Fees are transferrable based on availability.
7 Trips and tours: Refunds and credits are issued only if a requested cancellation can be filled from the waitlist.
8 Excluding recreational swimming, sports field rentals, after school meeting room rentals, and track.
(Res. 2016-078, § 1(exh. B), 2016; Res. 2017-060, §1(exh. B), 2017.)
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| STREETS | STREETS | STREETS | STREETS | STREETS |
| LS | Traffic Control (5% of construction cost) | 5% | $ | |
| LS | Clear & Grub Site (5% of construction cost) | 5% | $ | |
| EA | Tree Removal | $ 800.00 | $ | |
| CY | Concrete Removal | $ 300.00 | $ | |
| CY | AC Pavement Removal | $ 100.00 | $ | |
| LS | Excavation (Clean Material) (5% of Construction Cost) | 5% | $ | |
| CY | Imported Common Fill (Incl. Compaction) | $ 34.00 | $ | |
| SF | Preparation of Subgrade | $ 1.00 | $ | |
| LF | PCC 8" Curb & 24" Gutter | $ 23.00 | $ | |
| LF | PCC Curb Only | $ 20.00 | $ | |
| LF | 8" A.C. Berm | $ 20.00 | $ | |
| SF | 8" PCC Cross Gutter | $ 11.00 | $ | |
| SF | 4" PCC Sidewalk | $ 5.80 | $ | |
| SF | 6" PCC Thick Drive Approach | $ 7.40 | $ | |
| SF | 8" PCC Thick Drive Approach | $ 9.00 | $ | |
| LF | 2" x 6" Redwood Header | $ 5.00 | $ | |
| EA | Street Sign | $ 475.00 | $ | |
| EA | Traffic Sign and Post | $ 400.00 | $ | |
| EA | Reflector Sign and Post | $ 175.00 | $ | |
| EA | Painted Legend | $ 6.50 | $ | |
| SF | Prime or Tack Coat | $ 0.05 | $ | |
| TON | AC Variable - <300T | $ 90.00 | $ | |
| TON | AC Variable - >300T | $ 80.00 | $ | |
| TON | CAB Variable - <300T | $ 75.00 | $ | |
| TON | CAB Variable - >300T | $ 65.00 | $ | |
| EA | Adjust Sewer Manhole to Grade | $ 665.00 | $ | |
| LS | Mobilization | 5% | $ | |
| EA | Adjust Sewer Cleanout to Grade | $ 350.00 | $ | |
| EA | Adjust Water Valve to Grade | $ 265.00 | $ | |
| EA | Street Light (City Owner) | $ 6,700.00 | $ | |
| EA | Lot Monument Setting Fee | $ 550.00 | $ | |
| LF | Sawcut A.C. | $ 3.00 | $ | |
| LF | Sawcut Concrete | $ 3.00 | $ | |
| SF | Cold Plane A.C (5 foot wide) | $ 0.28 | $ | |
| LF | Signing & Striping for | |||
| Arterial | $ 19.00 | $ | ||
| Collector | $ 13.00 | $ | ||
| Local | $ 7.00 | $ | ||
| EA | Traffic Signal (8 - Phase Controller) | $ 250,000.00 | $ | |
| EA | Modify existing Traffic Signal per Quadrant | $ 50,000.00 | $ | |
| LF | Chain Link Fence | |||
| 4 foot Residential Grade (Add $7.00/LF for Removal of Existing Fence) | $ 25.00 | $ | ||
| 6 foot School Fence (Add $9.00/LF for Removal of Existing Fence) | $ 35.00 | $ | ||
| EA | Utility Poles | |||
| Transmission | $ 11,500.00 | $ | ||
| Distribution | $ 8,000.00 | $ | ||
| Service | $ 3,000.00 | $ | ||
| SF | Landscape (Including shrubs, Hardscape, Irrigation, Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) | $ 10.00 | $ | |
| LF | 14 foot Median with Landscape, Irrigation, Lighting, Hardscape, Curb, Gutter & Pavement | $ 300.00 | $ | |
| Rail Road Crossing | ||||
| LS | Safety Equipment (Complete Including Crossing Gates, Signs, and Lights) | $ 400,000.00 | $ | |
| SF | Track Crossing (Concrete) | $ 150.00 | $ | |
| SF | Approach | $ 2.25 | $ | |
| EA | S.W. Ramps (A.D.A. Compliant) | $ 4,000.00 | $ | |
| EA | Traffic Signal Loops | $ 400.00 | $ | |
| STREET SUBTOTAL | $ | |||
| PROJECT ADDITIVES | PROJECT ADDITIVES | Project Contingencies | 10% | $ |
| Construction Staking | 3% | $ | ||
| Soils Testing | 1% | $ | ||
| Material Testing | 1% | $ | ||
| Construction Inspection | 2% | $ | ||
| Contract Administration | 1% | $ | ||
| GRAND TOTAL STREETS ONLY | $ |
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| WATER | WATER | WATER | WATER | WATER |
| LS | Traffic Control (5% of Construction Cost) | 5% | $ | |
| LF | Trench Support/ |
$ 15.00 | $ | |
| CY | Pipe Bedding (Imported) | $ 45.00 | $ | |
| LF | 6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 60.00 | $ | |
| LF | 8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. | $ 75.00 | $ | |
| LF | 10" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 80.00 | $ | |
| LF | 12" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 90.00 | $ | |
| LF | 16" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 105.00 | $ | |
| EA | 6" Gate Valve | $ 1,500.00 | $ | |
| EA | 8" Gate Valve | $ 2,000.00 | $ | |
| EA | 10" Gate Valve | $ 2,400.00 | $ | |
| EA | 12" Gate Valve | $ 2,800.00 | $ | |
| EA | 16" Gate Valve | $ 3,500.00 | $ | |
| EA | Fire Hydrant Assembly per City Std. | $ 7,500.00 | $ | |
| EA | Blow-off Assembly 6" per City Std. | $ 4,500.00 | $ | |
| EA | 2" Air Relief Assembly | $ 4,500.00 | $ | |
| EA | 1" Water Service/ |
$ 3,500.00 | $ | |
| EA | 2" Water Service/ |
$ 4,500.00 | $ | |
| WATER SUBTOTAL | $ | |||
| PROJECT ADDITIVES | PROJECT ADDITIVES | Project Contingencies | 10% | $ |
| Construction Staking | 3% | $ | ||
| Soils Testing | 1% | $ | ||
| Material Testing | 1% | $ | ||
| Construction Inspection | 2% | $ | ||
| Contract Administration | 1% | $ | ||
| GRAND TOTAL WATER ONLY | $ |
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| RECYCLED WATER | RECYCLED WATER | RECYCLED WATER | RECYCLED WATER | RECYCLED WATER |
| LS | Traffic Control (5% of Construction Cost) | 5% | $ | |
| LF | Trench Support/ |
$ 15.00 | $ | |
| CY | Pipe Bedding (Imported) | $ 45.00 | $ | |
| LF | 6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 60.00 | $ | |
| LF | 8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. | $ 75.00 | $ | |
| LF | 10" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 80.00 | $ | |
| LF | 12" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 90.00 | $ | |
| LF | 16" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration | $ 105.00 | $ | |
| EA | 6" Gate Valve | $ 1,500.00 | $ | |
| EA | 8" Gate Valve | $ 2,000.00 | $ | |
| EA | 10" Gate Valve | $ 2,400.00 | $ | |
| EA | 12" Gate Valve | $ 2,800.00 | $ | |
| EA | 16" Gate Valve | $ 3,800.00 | $ | |
| EA | Fire Hydrant Assembly per City Std. | $ 7,500.00 | $ | |
| EA | Blow-off Assembly 6" per City Std. | $ 4,500.00 | $ | |
| EA | 2" Air Relief Assembly | $ 4,500.00 | $ | |
| EA | 1" Water Service/ |
$ 3,500.00 | $ | |
| EA | 2" Water Service/ |
$ 4,500.00 | $ | |
| RECYCLED WATER SUBTOTAL | $ | |||
| PROJECT ADDITIVES | PROJECT ADDITIVES | Project Contingencies | 10% | $ |
| Construction Staking | 3% | $ | ||
| Soils Testing | 1% | $ | ||
| Material Testing | 1% | $ | ||
| Construction Inspection | 2% | $ | ||
| Contract Administration | 1% | $ | ||
| GRAND TOTAL RECYCLED WATER ONLY | $ |
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| SEWER | SEWER | SEWER | SEWER | SEWER |
| LS | Traffic Control (5% of Construction cost) | 5% | $ | |
| LF | Trench Support/ |
$ 15.00 | $ | |
| LF | 8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration | $ 92.00 | $ | |
| LF | 10" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 98.00 | $ | |
| LF | 12" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 104.00 | $ | |
| LF | 15" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 110.00 | $ | |
| LF | 18" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 140.00 | $ | |
| LF | 21" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 150.00 | $ | |
| LF | 24" V.C.P. Installed, including excavation, bedding, backfill and pavement restoration | $ 170.00 | $ | |
| EA | Sewer Saddle | $ 450.00 | $ | |
| EA | Wyes 4" x 8" Typical | $ 225.00 | $ | |
| EA | 48" Sewer Manhole | $ 5,000.00 | $ | |
| EA | 60" Sewer Manhole | $ 6,400.00 | $ | |
| EA | Sewer Cleanout | $ 1,800.00 | $ | |
| SEWER SUBTOTAL | $ | |||
| PROJECT ADDITIVES | PROJECT ADDITIVES | Project Contingencies | 10% | $ |
| Construction Staking | 3% | $ | ||
| Soils Testing | 1% | $ | ||
| Material Testing | 1% | $ | ||
| Construction Inspection | 2% | $ | ||
| Contract Administration | 1% | $ | ||
| GRAND TOTAL SEWER ONLY | $ |
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| STORM DRAIN | STORM DRAIN | STORM DRAIN | STORM DRAIN | STORM DRAIN |
| LS | Traffic Control (5% of Construction Cost) | 5% | $ | |
| LF | 24" X 36" C.M.P.A. (10 Gauge) | $ 230.00 | $ | |
| LF | 27" x 43" C.M.P.A (10 Gauge) | $ 250.00 | $ | |
| EA | Storm Drain Manhole #1 | $ 5,000.00 | $ | |
| EA | Junction Structure #2 (24" or larger) | $ 4,400.00 | $ | |
| EA | Junction Structure #4 (24" or smaller) | $ 2,500.00 | $ | |
| EA | Outlet Structure | $ 5,000.00 | $ | |
| EA | Catch Basin 3.5' Width | $ 5,500.00 | $ | |
| EA | Catch Basin 7' Width/ |
$ 6,100.00 | $ | |
| EA | Catch Basin 10' Width/ |
$ 7,000.00 | $ | |
| EA | Catch Basin 14' Width/ |
$ 8,000.00 | $ | |
| EA | Catch Basin 21' Width/ |
$ 10,000.00 | $ | |
| LF | 18 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 130.00 | $ | |
| LF | 24 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 150.00 | $ | |
| LF | 27 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 160.00 | $ | |
| LF | 30 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 175.00 | $ | |
| LF | 33 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 190.00 | $ | |
| LF | 36 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 240.00 | $ | |
| LF | 39 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 260.00 | $ | |
| LF | 42 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 275.00 | $ | |
| LF | 45 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 280.00 | $ | |
| LF | 48 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 300.00 | $ | |
| LF | 51 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 325.00 | $ | |
| LF | 54 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 350.00 | $ | |
| LF | 60 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 360.00 | $ | |
| LF | 63 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 370.00 | $ | |
| LF | 66 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 400.00 | $ | |
| LF | 72 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 460.00 | $ | |
| LF | 78 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 470.00 | $ | |
| LF | 81 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 490.00 | $ | |
| LF | 84 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 510.00 | $ | |
| LF | 90 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 540.00 | $ | |
| LF | 96 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 570.00 | $ | |
| LF | 102 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 610.00 | $ | |
| LF | 108 inch RCP Installed, including excavation, bedding, backfill and pavement restoration | $ 640.00 | $ | |
| LF | 7' x 6' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 700.00 | $ | |
| LF | 7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 820.00 | $ | |
| LF | 7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 870.00 | $ | |
| LF | 8' x 11' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 1,000.00 | $ | |
| LF | 8' x 13' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 1,100.00 | $ | |
| LF | 9' x 9' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 1,000.00 | $ | |
| LF | 9' x 12' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 1,100.00 | $ | |
| LF | 4' x 6' RCB Installed, including excavation, bedding, backfill and pavement restoration | $ 680.00 | $ | |
| STORM DRAIN SUBTOTAL | $ | |||
| PROJECT ADDITIVES | PROJECT ADDITIVES | Project Contingencies | 10% | $ |
| Construction Staking | 3% | $ | ||
| Soils Testing | 1% | $ | ||
| Material Testing | 1% | $ | ||
| Construction Inspection | 2% | $ | ||
| Contract Administration | 1% | $ | ||
| GRAND TOTAL STORM DRAIN ONLY | $ |
CITY OF CHINO ENGINEERING COST ESTIMATE
PROJECT NO: _____
LOCATION: _____
By: _____
DATE: _____
| Quantity | Unit | Item | Unit Price | Total Cost Per Item |
|---|---|---|---|---|
| ENGINEER'S ESTIMATE GRAND TOTAL | ENGINEER'S ESTIMATE GRAND TOTAL | ENGINEER'S ESTIMATE GRAND TOTAL | ENGINEER'S ESTIMATE GRAND TOTAL | $ |
| BY ENGINEER | BY ENGINEER | BY ENGINEER | BY ENGINEER | BY ENGINEER |
| Prepared By: _____ | Prepared By: _____ | Prepared By: _____ | Prepared By: _____ | Prepared By: _____ |
| R.C.E. Number: _____ | R.C.E. Number: _____ | R.C.E. Number: _____ | R.C.E. Number: _____ | R.C.E. Number: _____ |
| Expiration: _____ | Expiration: _____ | Expiration: _____ | Expiration: _____ | Expiration: _____ |
[Figure]
BY CITY
| Faithful Performance Bond (100% of Construction Cost) | Faithful Performance Bond (100% of Construction Cost) | Faithful Performance Bond (100% of Construction Cost) | Faithful Performance Bond (100% of Construction Cost) | $ |
|---|---|---|---|---|
| Labor & material Bond (50% of Construction Cost) | Labor & material Bond (50% of Construction Cost) | Labor & material Bond (50% of Construction Cost) | Labor & material Bond (50% of Construction Cost) | $ |
| Warranty Bond (10% of Construction Cost) | Warranty Bond (10% of Construction Cost) | Warranty Bond (10% of Construction Cost) | Warranty Bond (10% of Construction Cost) | $ |
(Res. 2016-078, § 1(exh. C), 2016; Res. 2017-060, § 1(exh. C), 2017.)
[Figure]
Building Valuation Data—AUGUST 2017
The International Code Council is pleased to provide the following Building Valuation Data (BVD) for its members. The BVD will be updated at six-month intervals, with the next update in February 2018. ICC strongly recommends that all jurisdictions and other interested parties actively evaluate and assess the impact of this BVD table before utilizing it in their current code enforcement related activities.
The BVD table provides the "average" construction costs per square foot, which can be used in determining permit fees for a jurisdiction. Permit fee schedules are addressed in Section 109.2 of the 2015 International Building Code (IBC) whereas Section 109.3 addresses building permit valuations. The permit fees can be established by using the BVD table and a Permit Fee Multiplier, which is based on the total construction value within the jurisdiction for the past year. The Square Foot Construction Cost table presents factors that reflect relative value of one construction classification/occupancy group to another so that more expensive construction is assessed greater permit fees than less expensive construction.
ICC has developed this data to aid jurisdictions in determining permit fees. It is important to note that while this BVD table does determine an estimated value of a building (i.e., Gross Area x Square Foot Construction Cost), this data is only intended to assist jurisdictions in determining their permit fees. This data table is not intended to be used as an estimating guide because the data only reflects average, costs and is not representative of specific construction.
This degree of precision is sufficient for the intended purpose, which is to help establish permit fees so as to fund code compliance activities. This BVD table provides jurisdictions with a simplified way to determine the estimated value of a building that does not rely on the permit applicant to determine the cost of construction. Therefore, the bidding process for a particular job and other associated factors do not affect the value of a building for determining the permit fee. Whether a specific project is bid at a cost above or below the computed value of construction does not affect the permit fee because the cost of related code enforcement activities is not directly affected by the bid process and results.
Building Valuation
The following building valuation data represents average valuations for most buildings. In conjunction with IBC Section 109.3, this data is offered as an aid for the building official to determine if the permit valuation is underestimated. Again it should be noted that, when using this data, these are "average" costs based on typical construction methods for each occupancy group and type of construction. The average costs include foundation work, structural and nonstructural building components, electrical, plumbing, mechanical and interior finish material. The data is a national average and does not take into account any regional cost differences. As such, the use of Regional Cost Modifiers is subject to the authority having jurisdiction.
Permit Fee Multiplier
Determine the Permit Fee Multiplier:
Based on historical records, determine the total annual construction value which has occurred within the jurisdiction for the past year.
Determine the percentage (%) of the building department budget expected to be provided by building permit revenue.
[Figure]
Example
;b0;The building department operates on a $300,000 budget, and it expects to cover 75 percent of that from building permit fees. The total annual construction value which occurred within the jurisdiction in the previous year is $30,000,000.
[Figure]
Permit Fee
The permit fee is determined using the building gross area, the Square Foot Construction Cost and the Permit Fee Multiplier.
Permit Fee = Gross Area x Square Foot Construction Cost X Permit Fee Multiplier
Example
Type of Construction: IIB
Area 1st story = 8,000 sq. ft.
2nd story = 8,000 sq. ft.
Height: 2 stories
Permit Fee Multiplier = 0.0075
Use Group: B
- Gross area:
Business = 2 stories x 8,000 sq. ft. = 16,000 sq. ft.
- Square Foot Construction Cost:
B/IIB = $165.19/sq. ft.
- Permit Fee:
Business = 16,000 sq. ft. x $165.19/sq. ft x 0.0075 = $19,823.00
Important Points
• The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations or repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect accurate values for that purpose. However, the Square Foot Construction Costs table can be used to determine the cost of an addition that is basically a stand-alone building which happens to be attached to an existing building. In the case of such additions, the only alterations to the existing building would involve the attachment of the addition to the existing building and the openings between the addition and the existing building.
• For purposes of establishing the Permit Fee Multiplier, the estimated total annual construction value for a given time period (1 year) is the sum of each building's value (Gross Area x Square Foot Construction Cost) for that time period (e.g., 1 year).
• The Square Foot Construction Cost does not include the price of the land on which the building is built. The Square Foot Construction Cost takes into account everything from foundation work to the roof structure and coverings but does not include the price of the land. The cost of the land does not affect the cost of related code enforcement activities and is not included in the Square Foot Construction Cost.
Square Foot Construction Costsa, b, c, d
| Group (2015 International Building Code ) | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
|---|---|---|---|---|---|---|---|---|---|
| A-1 Assembly, theaters, with stage | 233.95 | 225.89 | 220.42 | 211.39 | 198.92 | 193.15 | 204.70 | 181.63 | 174.97 |
| A-1 Assembly, theaters, without stage | 214.40 | 206.35 | 200.88 | 191.84 | 179.53 | 173.76 | 185.16 | 162.23 | 155.58 |
| A-2 Assembly, nightclubs | 182.86 | 177.56 | 173.06 | 166.05 | 156.54 | 152.22 | 160.22 | 141.73 | 136.94 |
| A-2 Assembly, restaurants, bars, banquet halls | 181.86 | 176.56 | 171.06 | 165.05 | 154.54 | 151.22 | 159.22 | 139.73 | 135.94 |
| A-3 Assembly, churches | 216.47 | 208.41 | 202.95 | 193.91 | 181.79 | 176.02 | 187.23 | 164.50 | 157.85 |
| A-3 Assembly, general, community halls, libraries, museums | 180.57 | 172.51 | 166.04 | 158.00 | 144.89 | 140.11 | 151.32 | 127.59 | 121.94 |
| A-4 Assembly, arenas | 213.40 | 205.35 | 198.88 | 190.84 | 177.53 | 172.76 | 184.16 | 160.23 | 154.58 |
| B Business | 186.69 | 179.79 | 173.86 | 165.19 | 150.70 | 145.02 | 158.70 | 132.31 | 126.48 |
| E Educational | 197.52 | 190.73 | 185.77 | 177.32 | 165.32 | 156.97 | 171.23 | 144.39 | 140.26 |
| F-1 Factory and industrial, moderate hazard | 111.86 | 106.71 | 100.58 | 96.68 | 86.77 | 82.81 | 92.61 | 72.75 | 68.09 |
| F-2 Factory and industrial, low hazard | 110.86 | 105.71 | 100.58 | 95.68 | 86.77 | 81.81 | 91.61 | 72.75 | 67.09 |
| H-1 High Hazard, explosives | 104.68 | 99.53 | 94.40 | 89.50 | 80.80 | 75.84 | 85.43 | 66.78 | N.P. |
| H234 High Hazard | 104.68 | 99.53 | 94.40 | 89.50 | 80.80 | 75.84 | 85.43 | 66.78 | 61.12 |
| H-5 HPM | 186.69 | 179.79 | 173.86 | 165.19 | 150.70 | 145.02 | 158.70 | 132.31 | 126.48 |
| I-1 Institutional, supervised environment | 187.63 | 181.26 | 176.01 | 168.60 | 155.33 | 151.11 | 168.69 | 139.15 | 134.82 |
| I-2 Institutional, hospitals | 314.17 | 307.27 | 301.34 | 292.67 | 277.18 | N.P. | 286.18 | 258.79 | N.P. |
| I-2 Institutional, nursing homes | 217.67 | 210.77 | 204.84 | 196.17 | 182.68 | N.P. | 189.68 | 164.29 | N.P. |
| I-3 Institutional, restrained | 212.42 | 205.52 | 199.59 | 190.92 | 177.93 | 171.25 | 184.43 | 159.54 | 151.71 |
| I-4 Institutional, day care facilities | 187.63 | 181.26 | 176.01 | 168.60 | 155.33 | 151.11 | 168.69 | 139.15 | 134.82 |
| M Mercantile | 136.25 | 130.95 | 125.45 | 119.44 | 109.43 | 106.11 | 113.60 | 94.63 | 90.83 |
| R-1 Residential, hotels | 189.35 | 182.99 | 177.74 | 170.33 | 156.80 | 152.58 | 170.42 | 140.62 | 136.29 |
| R-2 Residential, multiple family | 158.84 | 152.48 | 147.23 | 139.81 | 127.05 | 122.83 | 139.91 | 110.87 | 106.54 |
| R-3 Residential, one- and two-family d | 148.17 | 144.14 | 140.42 | 136.90 | 131.89 | 128.41 | 134.60 | 123.40 | 116.15 |
| R-4 Residential, care/ |
187.63 | 181.26 | 176.01 | 168.60 | 155.33 | 151.11 | 168.69 | 139.15 | 134.82 |
| S-1 Storage, moderate hazard | 103.68 | 98.53 | 92.40 | 88.50 | 78.80 | 74.84 | 84.43 | 64.78 | 60.12 |
| S-2 Storage, low hazard | 102.68 | 97.53 | 92.40 | 87.50 | 78.80 | 73.84 | 83.43 | 64.78 | 59.12 |
| U Utility, miscellaneous | 80.38 | 75.90 | 71.16 | 67.61 | 60.99 | 57.00 | 64.60 | 48.23 | 45.92 |
a. Private Garages use Utility, miscellaneous
b. For shell only buildings deduct 20 percent
c. N.P. = not permitted
d. Unfinished basements (Group R-3) = $21.00 per sq. ft.
;hn0; (Res. 2016-078, § 1(exh. D), 2016; Res. 2017-060, § 1(exh. D), 2017.)
CITY OF CHINO POLICE DEPARTMENT
PARKING BAIL SCHEDULE
| Municipal Code Violations | Fine * |
|---|---|
| 10.28.030 (b) - Stop/ |
$ 35.00 |
| 10.28.050 - Stop/ Park in Parkway | $ 35.00 |
| 10.28.060 (a) - Stop/ |
$ 35.00 |
| 10.28.060 (d) - No Parking Zone/ |
$ 35.00 |
| 10.28.060 (f) - Stop/ |
$ 35.00 |
| 10.28.060 (g) - Temporary No Parking/ |
$ 35.00 |
| 10.28.060 (h) - Within 20 feet of X-Walk/ |
$ 35.00 |
| 10.28.065 - No Parking on Specified Streets during Specified Days (street sweeping) | $ 35.00 |
| 10.28.090 (a)(1) - Unlawful to Park Except: Diagonal Parking Within Markings | $ 35.00 |
| 10.28.090 (a)(2) - Unlawful to Park Except: Diagonal Parking/ |
$ 35.00 |
| 10.28.100 - One Way Street/ |
$ 35.00 |
| 10.28.110 (b) - Emergency No Parking Signs | $ 35.00 |
| 10.28.120 (b) - No Parking Signs Are Adjacent to School/ When Posted | $ 35.00 |
| 10.28.130 - No Longer Than 2hr Parking/ |
$ 35.00 |
| 10.28.140 (b) - Parking on Narrow Street/ |
$ 35.00 |
| 10.28.150 - Stop/ |
$ 35.00 |
| 10.28.160 - Park for Sale or Advertising on Street | $ 35.00 |
| 10.28.170 - Parking for Auto Repairs or Greasing, on Highway | $ 35.00 |
| 10.28.180 (a) - Park/ |
$ 35.00 |
| 10.28.190 - Parking Excess of 72 Hours/ |
$ 50.00 |
| 10.29.060 (j) - Permit Parking Only: 1st Violation | $ 50.00 |
| 10.29.060 (j) - Permit Parking Only: 2nd Violation | $ 150.00 |
| 10.29.060 (j) - Permit Parking Only: 3rd Violation | $ 250.00 |
| 10.30.030 (a) - Park Commercial Veh. on Public/ |
$ 50.00 |
| 10.30.030 (a) - Park Commercial Veh. on Public/ |
$ 100.00 |
| 10.30.030 (a) - Park Commercial Veh. on Public/ |
$ 250.00 |
| 10.30.030 (b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 1st Violation | $ 50.00 |
| 10.30.030 (b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 2nd Violation within one year | $ 100.00 |
| 10.30.030 (b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 3rd Violation within one year | $ 250.00 |
| 10.30.030 (c) - Park Trailer or Semi-trailer on Public/ |
$ 50.00 |
| 10.30.030 (c) - Park Trailer or Semi-trailer on Public/ |
$ 100.00 |
| 10.30.030 (c) - Park Trailer or Semi-trailer on Public/ |
$ 250.00 |
| 10.30.030 (d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 1st Violation | $ 50.00 |
| 10.30.030 (d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 2nd Violation within one year | $ 100.00 |
| 10.30.030 (d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 3rd Violation within one year | $ 250.00 |
| 10.30.030 (e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a Consecutive Period of 6 hrs, 10,000lbs: Deemed abandoned. 1st Violation | $ 50.00 |
| 10.30.030 (e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a Consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 2nd Violation within one year | $ 100.00 |
| 10.30.030 (e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 3rd Violation within one year | $ 250.00 |
| 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/ |
$ 50.00 |
| 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/ |
$ 100.00 |
| 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/ |
$ 250.00 |
| 10.32.060 (a)(1) - Stop/ |
$ 35.00 |
| 10.32.060 (b)(1) - Stop/ |
$ 35.00 |
| 10.32.070 - Park Yellow Zone for Loading or Unloading of Passengers or Matariels | $ 35.00 |
| 10.32.080 - Stop/ |
$ 35.00 |
| 10.32.090 - Stop/ |
$ 35.00 |
| 10.44.010 - Parked Off a Truck Route/10,000 Gross Veh Wgt. Or More | $ 100.00 |
| 10.44.015 - Unattached Trailer or Semi-Trailer | $ 100.00 |
| Vehicle Code Violations | Fine * |
|---|---|
| 4000a - Expired Reg | $ 75.00 |
| 5204(a) - No Tabs | $ 75.00 |
| 21113(a) Unauthorized Parking on School or Public Grounds | $ 35.00 |
| 21211(b) Park/ |
$ 75.00 |
| 22500a - Vehicle Parked Within Intersection | $ 35.00 |
| 22500b - Vehicle Parked on Crosswalk | $ 35.00 |
| 22500c - Vehicle Parked Adjacent to Safety Zone | $ 35.00 |
| 22500d - Vehicle Parked Within 15ft of Fire Station Driveway | $ 35.00 |
| 22500e - Vehicle Blocking Driveway | $ 35.00 |
| 22500f - Vehicle Parked on a Sidewalk | $ 35.00 |
| 22500g - Vehicle Blocking Excavation | $ 35.00 |
| 22500h - Double Parking | $ 35.00 |
| 22500i - Vehicle Parked in Posted Bus Loading Zone | $ 35.00 |
| Municipal Code Violations | Fine * |
|---|---|
| 22500k - Vehicle Parked on Bridge or Tunnel | $ 35.00 |
| 22500.1 - Parked In Fire Lane | $ 75.00 |
| 22502a - 18 Inches From Curb / Wrong Way | $ 35.00 |
| 22505 - Park on State Highway/ |
$ 35.00 |
| 22507.8(a) - Handicap Disabled Only | $ 300.00 |
| 22507.8(b) - Block or Obstruct Disabled Stall/ |
$ 300.00 |
| 22507.8(c)(2) - Block or Obstruct Disabled Stall/ |
$ 300.00 |
| 22514 - Within 15ft of Fire Hydrant | $ 50.00 |
| 22515 - Unattended Running Vehicle | $ 35.00 |
| 22516 - Vehicle Locked with Person Who Can't Escape | $ 35.00 |
| 22517 - Door Open to Traffic | $ 50.00 |
| 22520 - Stopping on a Freeway | $ 35.00 |
| 22521 - Parked Within 7.5ft of Rail Road | $ 75.00 |
| 22522 - Parking Within 3ft of Sidewalk Access Ramp | $ 75.00 |
| 22526a- Grid Lock | $ 75.00 |
| County Code Violations | Fine * |
|---|---|
| CC 53.064a - Failed to Park In Stall | $ 14.00 |
| CC 53.064b - Failed to Comply with Signs/ |
$ 14.00 |
| CC 53.064c - Failed to Park in Designated Lot/ |
$ 14.00 |
| CC 3.064d - Parked to Cause Obstruction/ |
$ 14.00 |
| CC 53.065 - 15mph or Posted Speed Limit | $ 14.00 |
| CC 52.0119 - Parked in Excess of 72 hours | $ 29.00 |
* Plus State/County Surcharge of $12.50 when applicable, per County GC 76000(b) and State GC Sec. 70372(b) and 76000.3
1st Penalty Late Charge $25.00 at 32 days
2nd Penalty Late Charge $25.00 at 62 days
Delinquent Citation sent to DMV at 63 days
3rd Penalty Late Charge $25.00 at 92 days
(Res. 2016-078, § 1(exh. E), 2016; Res. 2017-060, § 1(exh. E), 2017.)
Parking Citations
STATE AND COUNTY SURCHARGES
| Government Code Section | Total Surcharge | |
|---|---|---|
| County GC § 76000(b) | Courthouse Construction Fund - GC § 76100 | |
| County GC § 76000(b) | GC § 76000 (b) - $2.50 parking penalty to the local Courthouse Construction Fund established pursuant to GC § 76100 less $1 to the general fund of the County per GC § 76000(c) | $1.50 |
| County GC § 76000(b) | GC § 76000 (c) - $1 of the $2.50 from GC § 76000 (b) - to the general fund of the County | $1.00 |
| County GC § 76000(b) | Subtotal - Courthouse Construction Fund and County General Fund | $2.50 |
| County GC § 76000(b) | Criminal Just Facilities Construction Fund - GC § 76101 | |
| County GC § 76000(b) | GC § 76000 (b) - $2.50 parking penalty to the local Criminal Justice Facilities Construction Fund established pursuant to GC § 76101 less $1 to the general fund of the County per GC § 76000 (c) | $1.50 |
| County GC § 76000(b) | GC § 76000 (c) - $1 of the $2.50 from GC § 76000 (b) - to the general fund of the County | $1.00 |
| County GC § 76000(b) | Subtotal - Criminal Just Facilities Construction Fund and County General Fund | $2.50 |
| County GC § 76000(b) | Total - County GC § 76000 (b) | $5.00 |
| State GC § 70372 (b) | State Court Facilities Construction Fund - GC § 70371 | |
| State GC § 70372 (b) | GC § 70372 (b) - $4.50 State Court Construction Parking Penalty Note: Per GC § 70372 (f) (2), 1/3 of $4.50 (or $1.50) to the State Court Facilities Fund. | $1.50 |
| State GC § 70372 (b) | GC § 70372 (b) - $4.50 State Court Construction Parking Penalty Note: Per GC § 70372 (f) (2), 2/3 of $4.50 (or $3.00) to the Immediate and Critical Needs Construction Fund | $3.00 |
| State GC § 70372 (b) | Total - State GC § 70372 (b) | $4.50 |
| State GC § 76000.3 | State Trial Court Trust Fund - GC § 76000.3 | |
| State GC § 76000.3 | Effective December 7, 2010, the city is required to assess a $3.00 parking citation surcharge. This surcharge is used to fund the State Trial Court Trust Fund and was scheduled to be sunset on July, 1, 2013 per GC § 76000.3 (1). Surcharge is now permanent. | |
| State GC § 76000.3 | Total - GC 76000.3 | $3.00 |
| Total - State and County Surcharges | $12.50 |
Source: San Bernardino County, Parking Fines Legislation Flowcharts
Effective Jan 1, 2011, after adoption of SB1021
(Res. 2016-078, § 1(exh. F), 2016; Res. 2017-060, § 1(exh. F), 2017.)
CHINO POLICE DEPARTMENT PERMITTED TOW SERVICE OPERATOR FEE SCHEDULE Chino Municipal Code CMC 5.36
The below fees have been reviewed by the chief of police or his/her designee and deemed reasonable after consultation with the current tow service operators and other public agencies.
| SERVICE PROVIDED | FEE | DESCRIPTION |
|---|---|---|
| Initial tow service | $220.00 | This fee is for up to one hour of services performed, inclusive of one driver and one light duty tow vehicle. This fee is retained by the tow service operator. |
| Additional hourly labor rate | $200.00 | This fee is for additional time after the initial hour of the tow service or a second driver and tow vehicle, if needed for a complicated tow or scene, at the request of a police department employee. This fee is retained by the tow service operator. |
| Daily outside storage * | $46.00 | This fee is for storage of a stored or impounded vehicle at the tow providers storage yard, including the initial day of the towed vehicle. |
| Daily inside storage * | $52.00 | This fee is for the storage of a stored or impounded vehicle at the tow providers storage yard, including the initial day of the towed vehicle. |
| After hours tow yard release | $100.00 | This fee is authorized in the event of a vehicle release after the normal, posted business hours of a tow service This fee is retained by the tow service operator. |
| * The tow service operator shall transmit one-half of all storage fees collected to the police chief and retain one-half of such fees as compensation for its storage services, and shall remit the balance at the end of each month to the city (CMC 5.36.130 F) |
(Res. 2017-060, § 1(exh. E), 2017.)
Get a plain-English answer with a citation back to this text.
Ask AI about this code