Skip to content

Appendix A4

Section A4.602

California Green Building Standards Code (Title 24, Part 11) · 2022 edition · updated 2026-09-12 · California

RESIDENTIAL OCCUPANCIES APPLICATION CHECKLIST—continued

FEATURE OR MEASURE LEVELS
APPLICANT TO SELECT ELECTIVE MEASURES
VERIFICATIONS
ENFORCING AGENCY TO SPECIFY
VERIFICATION METHOD
FEATURE OR MEASURE Mandatory Prerequisites and electives1 Prerequisites and electives1 Enforcing
Agency

All
Installer or
Designer

All
Third
party

All
FEATURE OR MEASURE Mandatory Tier 1 Tier 2 Tier 2 Tier 2 Tier 2
Material Sources
A4.405.1 One or more of the following building materials, that do
not require additional resources for finishing are used:
1. Exterior trim not requiring paint or stain
2. Windows not requiring paint or stain
3. Siding or exterior wall coverings which do not require paint or
stain
A4.405.2 Floors that do not require additional coverings are used
including but not limited to stained, natural or stamped concrete
floors.
A4.405.3Postconsumer or preconsumer recycled content value
(RCV) materials are used on the project.
**Tier 1.**Not less than a 10 percent recycled content value.
**Tier 2.**Not less than a 15 percent recycled content value.
2 2
A4.405.4Renewable source building products are used.
Enhanced Durability and Reduced Maintenance
4.406.1 Annular spaces around pipes, electric cables, conduits or
other openings in plates at exterior walls shall be protected against
the passage of rodents by closing such openings with cement mortar,
concrete masonry or similar method acceptable to the enforcing
agency.
Water Resistance and Moisture Management
A4.407.1Install foundation and landscape drains.
A4.407.2Install gutter and downspout systems to route water at least
5 feet away from the foundation or connect to landscape drains which
discharge to a dry well, sump, bioswale, rainwater capture system or
other approved on-site location.
A4.407.3 Provide flashing details on the building plans and comply
with accepted industry standards or manufacturer’s instructions.
A4.407.4 Protect building materials delivered to the construction site
from rain and other sources of moisture.
A4.407.5In Climate Zone 16 an ice/water barrier is installed at roof
valleys, eaves and wall to roof intersections.
A4.407.6Exterior doors to the dwelling are protected to prevent
water intrusion.
A4.407.7 A permanent overhang or awning at least 2 feet in depth is
provided.

continued

Copyright © 2022 by, or licensed to, International Code Council, Inc. (ALL RIGHTS RESERVED); licensed to California Building Standards Commission pursuant to License Agreement. No further reproductions is authorized. Any unauthorized reproduction or distribution is a violation of the federal copyright act and the license agreement, and subject to civil and criminal penalties thereunder.

APPENDIX A4—RESIDENTIAL VOLUNTARY MEASURES

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Green Building Standards Code (Title 24, Part 11)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.